Dartmouth Power Associates Limited Partnership, et al., 48116-48117 [E5-4422]
Download as PDF
48116
Federal Register / Vol. 70, No. 157 / Tuesday, August 16, 2005 / Notices
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–4448 Filed 8–15–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
listed in ascending order within each
docket classification.
1. Dartmouth Power Associates Limited
Partnership
[Docket No. EC05–117–000]
Take notice that on August 2, 2005,
Dartmouth Power Associates Limited
Partnership (Dartmouth Power)
submitted an application requesting
authorization under section 203 of the
Federal Power Act of a disposition of
jurisdictional facilities that would result
from the proposed indirect transfer of
100 percent of the interests in
Dartmouth Power to Morris Energy
Group, LLC, or its wholly-owned
subsidiary. Dartmouth Power states that
it is a public utility within the meaning
of section 201(e) of the Federal Power
Act.
Comment Date: 5 p.m. Eastern Time
on August 23, 2005.
2. Ameren Services Company on behalf
of Ameren Energy Development
Company, Ameren Energy Marketing
Company, AmerenEnergy Medina
Valley Cogen, L.L.C., and Electric
Energy Inc.
[Docket No. EC05–118–000]
Take notice that on August 5, 2005,
Ameren Services Company (Ameren
Services), on behalf of Ameren Energy
Development Company (AED), Ameren
Energy Marketing Company (AEM),
AmerenEnergy Medina Valley Cogen
(No. 4), L.L.C. (Medina Valley), and
Electric Energy, Inc. (EEI) (collectively,
AED, AEM, Medina Valley and EEI are
also referred to as Applicants),
submitted an application pursuant to
section 203 of the Federal Power Act,
and Part 33 of the Commission
regulations, 18 CFR Part 33, requesting
all Commission authorizations and
approvals necessary for AED to receive
as a contribution from Ameren Energy
Resources Company (AER) all of AER’s
stock ownership in AEM, and EEI, and
through its acquisition of AmerenEnergy
Medina Valley Cogen, (No. 4) L.L.C.
(Medina No. 4), indirect ownership of
Medina Valley.
Ameren Services states that this filing
have been served on all affected state
commissions.
Comment Date: 5 p.m. Eastern Time
on August 26, 2005.
Dartmouth Power Associates Limited
Partnership, et al.; Electric Rate and
Corporate Filings
3. Boston Generating, LLC, Mystic I,
LLC, Mystic Development, LLC, Fore
River Development, LLC, Tyr Energy,
LLC, K Road BG Management, EBG
Holdings, LLC and K Road BG LLC
August 9, 2005.
[Docket No. EC05–119–000]
The following filings have been made
with the Commission. The filings are
On August 5, 2005, Boston
Generating, LLC (Boston Generating)
[Docket No. EC05–117–000, et al.]
VerDate jul<14>2003
18:02 Aug 15, 2005
Jkt 205001
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
and its three wholly-owned
subsidiaries, Mystic I, LLC, Mystic
Development, LLC, and Fore River
Development, LLC (Project Companies),
Tyr Energy, LLC (Tyr), K Road BG
Management LLC (K Road BG
Management), EBG Holdings, LLC (EBG)
and K Road BG LLC (‘‘K Road BG’’)
(collectively, Applicants), submitted a
request for authorization pursuant to
Section 203 of the Federal Power Act for
a change in control of Boston
Generating’s Project Companies by the
replacement of the current asset
manager, Tyr, with a new asset manager,
K Road BG Management; to the extent
required, authorization for the indirect
disposition of jurisdictional assets as a
result of certain proposed changes in the
ownership, management and scope of
operations of EBG; blanket authorization
for certain categories of future transfers
or changes of ownership or control of
membership interests in EBG.
Comment Date: 5 p.m. Eastern Time
on August 26, 2005.
Standard Paragraph
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (19 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protests to the
Federal Energy Regulatory Commission,
E:\FR\FM\16AUN1.SGM
16AUN1
Federal Register / Vol. 70, No. 157 / Tuesday, August 16, 2005 / Notices
888 First Street, NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available to review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please email FERCOnlineSupport@ferc.gov or
call (866) 208–3676 (toll free). For TYY,
call (202) 502–8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–4422 Filed 8–15–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings # 1
August 10, 2005.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER02–600–005.
Applicants: Delta Energy Center, LLC
Description: Delta Energy Center, LLC
submits First Revised Sheet Nos. 3 and
4 to FERC Electric Tariff, Original
Volume 1 to be effective 3/21/05 in
compliance with the Commission’s
orders dated 4/15/05 and 6/28/05 in
Docket No. ER02–600–003 and 004.
Filed Date: 07/28/2005.
Accession Number: 20050801–0013.
Comment Date: 5 p.m. Eastern Time
on Thursday, August 18, 2005.
Docket Numbers: ER02–1656–030.
Applicants: California Independent
System Operator Corporation
Description: California Independent
System Operator Corporation’s
compliance filing regarding convergence
bidding pursuant to the Commission’s
7/1/05 order, 112 FERC¶61,013 (2005).
Filed Date: 08/02/2005.
Accession Number: 20050805–0157.
Comment Date: 5:00 p.m. Eastern
Time on Tuesday, August 23, 2005.
Docket Numbers: ER02–2339–002.
Applicants: Citadel Energy Products
LLC.
Description: Citadel Energy Products
LLC submits an updated market power
analysis and a revised tariff sheet to its
market-based rate.
Filed Date: 07/28/2005.
Accession Number: 20050801–0015.
VerDate jul<14>2003
18:02 Aug 15, 2005
Jkt 205001
Comment Date: 5 p.m. Eastern Time
on Thursday, August 18, 2005.
Docket Numbers: ER04–886–002.
Applicants: Entergy Services, Inc.
Description: Entergy Services, Inc.
submits its compliance refund report
pursuant to the Commission’s order
issued 6/16/05, 111 FERC¶61,405
(2005).
Filed Date: 08/01/2005.
Accession Number: 20050804–0221.
Comment Date: 5 p.m. Eastern Time
on Monday, August 22, 2005.
Docket Numbers: ER05–752–002.
Applicants: Midwest Independent
Transmission System Operator, Inc. PJM
Interconnection, L.L.C.
Description: Midwest Independent
Transmission System Operator Inc. and
PJM Interconnection, L.L.C. submit
clarifying revisions to the calculation of
Capacity Benefit Margin under the
Cogeneration Management Process of
their Joint Operating Agreement as
required by the Commission’s 7/05/05
order, 112¶61.029 (2005).
Filed Date: 08/04/2005.
Accession Number: 20050805–0268.
Comment Date: 5 p.m. Eastern Time
on Thursday, August 15, 2005.
Docket Numbers: ER05–1164–001.
Applicants: TPGC, LP.
Description: TPGC, LP submits a
Notice of Cancellation of its marketbased electric tariff.
Filed Date: 07/29/2005.
Accession Number: 20050805–0168.
Comment Date: 5 p.m. Eastern Time
on Friday, August 19, 2005.
Docket Numbers: ER05–1175–001.
Applicants: NorthWestern Energy.
Description: NorthWestern
Corporation d/b/a NorthWestern Energy
(NorthWestern Energy) submit corrected
cover sheet with the correct designation
to their 6/30/05 filing in Docket No.
ER05–1175–000.
Filed Date: 08/02/2005.
Accession Number: 20050805–0155.
Comment Date: 5 p.m. Eastern Time
on Tuesday, August 23, 2005.
Docket Numbers: ER05–1285–000
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool
Inc. submits revisions to its regional
Open Access Transmission Tariff.
Filed Date: 08/02/2005.
Accession Number: 20050804–0203.
Comment Date: 5 p.m. Eastern Time
on Tuesday, August 23, 2005.
Docket Numbers: ER95–1787–017.
Applicants: Texaco Natural Gas Inc.
Description: Texaco Natural Gas Inc.
submits updated triennial market power
analysis and revised market-based rate
tariff sheets.
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
48117
Filed Date: 08/02/2005.
Accession Number: 20050805–0247.
Comment Date: 5 p.m. Eastern Time
on Tuesday, August 23, 2005.
Docket Numbers: ER96–1145–015.
Applicants: Alternate Power Source,
Inc.
Description: Alternate Power Source,
Inc. submits updated power market
analysis.
Filed Date: 08/01/2005.
Accession Number: 20050801–5041.
Comment Date: 5 p.m. Eastern Time
on Monday, August 22, 2005.
Docket Numbers: ER96–2640–015.
Applicants: CHI Power Marketing Inc.
Description: CHI Power Marketing
Inc. submits its triennial updated
market analysis and revisions to its
market-based rate schedule.
Filed Date: 08/01/2005.
Accession Number: 20050804–0207.
Comment Date: 5 p.m. Eastern Time
on Monday, August 22, 2005.
Docket Numbers: ER96–719–006;
EL05–59–000.
Applicants: MidAmerican Energy
Company.
Description: MidAmerican Energy
Company, in compliance with the
Commission’s 6/1/05 Order (111
FERC¶61,320 (2005)), submits
additional information addressing
transmission market power concerns
and a sales tariff addressing generation
market power concerns that were raised
in connection with MidAmerican’s most
recent market power update.
Filed Date: 08/01/2005.
Accession Number: 20050804–0205.
Comment Date: 5 p.m. Eastern Time
on Monday, August 29, 2005.
Docket Numbers: ER98–4643–003.
Applicants: Storm Lake Power
Partners I LLC.
Description: Storm Lake Power
Partners I LLC submits its updated
market power analysis in support of its
continued market-based rate authority.
Filed Date: 08/01/2005.
Accession Number: 20050805–0248.
Comment Date: 5:00 p.m. Eastern
Time on Monday, August 22, 2005.
Docket Numbers: ER99–2774–008.
Applicants: Duke Energy Trading &
Marketing, L.L.C.
Description: Duke Energy Trading &
Marketing, L.L.C. submits its market
power update.
Filed Date: 08/01/2005.
Accession Number: 20050803–0145.
Comment Date: 5 p.m. Eastern Time
on Monday, August 22, 2005.
Docket Numbers: ER99–3151–004.
Applicants: PSEG Energy Resources &
Trade LLC.
Description: PSEG Energy Resources &
Trade LLC submits notice of change in
E:\FR\FM\16AUN1.SGM
16AUN1
Agencies
[Federal Register Volume 70, Number 157 (Tuesday, August 16, 2005)]
[Notices]
[Pages 48116-48117]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-4422]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EC05-117-000, et al.]
Dartmouth Power Associates Limited Partnership, et al.; Electric
Rate and Corporate Filings
August 9, 2005.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. Dartmouth Power Associates Limited Partnership
[Docket No. EC05-117-000]
Take notice that on August 2, 2005, Dartmouth Power Associates
Limited Partnership (Dartmouth Power) submitted an application
requesting authorization under section 203 of the Federal Power Act of
a disposition of jurisdictional facilities that would result from the
proposed indirect transfer of 100 percent of the interests in Dartmouth
Power to Morris Energy Group, LLC, or its wholly-owned subsidiary.
Dartmouth Power states that it is a public utility within the meaning
of section 201(e) of the Federal Power Act.
Comment Date: 5 p.m. Eastern Time on August 23, 2005.
2. Ameren Services Company on behalf of Ameren Energy Development
Company, Ameren Energy Marketing Company, AmerenEnergy Medina Valley
Cogen, L.L.C., and Electric Energy Inc.
[Docket No. EC05-118-000]
Take notice that on August 5, 2005, Ameren Services Company (Ameren
Services), on behalf of Ameren Energy Development Company (AED), Ameren
Energy Marketing Company (AEM), AmerenEnergy Medina Valley Cogen (No.
4), L.L.C. (Medina Valley), and Electric Energy, Inc. (EEI)
(collectively, AED, AEM, Medina Valley and EEI are also referred to as
Applicants), submitted an application pursuant to section 203 of the
Federal Power Act, and Part 33 of the Commission regulations, 18 CFR
Part 33, requesting all Commission authorizations and approvals
necessary for AED to receive as a contribution from Ameren Energy
Resources Company (AER) all of AER's stock ownership in AEM, and EEI,
and through its acquisition of AmerenEnergy Medina Valley Cogen, (No.
4) L.L.C. (Medina No. 4), indirect ownership of Medina Valley.
Ameren Services states that this filing have been served on all
affected state commissions.
Comment Date: 5 p.m. Eastern Time on August 26, 2005.
3. Boston Generating, LLC, Mystic I, LLC, Mystic Development, LLC, Fore
River Development, LLC, Tyr Energy, LLC, K Road BG Management, EBG
Holdings, LLC and K Road BG LLC
[Docket No. EC05-119-000]
On August 5, 2005, Boston Generating, LLC (Boston Generating) and
its three wholly-owned subsidiaries, Mystic I, LLC, Mystic Development,
LLC, and Fore River Development, LLC (Project Companies), Tyr Energy,
LLC (Tyr), K Road BG Management LLC (K Road BG Management), EBG
Holdings, LLC (EBG) and K Road BG LLC (``K Road BG'') (collectively,
Applicants), submitted a request for authorization pursuant to Section
203 of the Federal Power Act for a change in control of Boston
Generating's Project Companies by the replacement of the current asset
manager, Tyr, with a new asset manager, K Road BG Management; to the
extent required, authorization for the indirect disposition of
jurisdictional assets as a result of certain proposed changes in the
ownership, management and scope of operations of EBG; blanket
authorization for certain categories of future transfers or changes of
ownership or control of membership interests in EBG.
Comment Date: 5 p.m. Eastern Time on August 26, 2005.
Standard Paragraph
Any person desiring to intervene or to protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (19 CFR 385.211 and
385.214) on or before 5 p.m. Eastern time on the specified comment
date. It is not necessary to separately intervene again in a subdocket
related to a compliance filing if you have previously intervened in the
same docket. Protests will be considered by the Commission in
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Anyone filing a motion to
intervene or protest must serve a copy of that document on the
Applicant. In reference to filings initiating a new proceeding,
interventions or protests submitted on or before the comment deadline
need not be served on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://
www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies of the intervention or protests to the Federal Energy
Regulatory Commission,
[[Page 48117]]
888 First Street, NE., Washington, DC 20426.
The filings in the above proceedings are accessible in the
Commission's eLibrary system by clicking on the appropriate link in the
above list. They are also available to review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the Web site that enables subscribers to receive e-mail notification
when a document is added to a subscribed docket(s). For assistance with
any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov or
call (866) 208-3676 (toll free). For TYY, call (202) 502-8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-4422 Filed 8-15-05; 8:45 am]
BILLING CODE 6717-01-P