Nuclear Management Company, LLC; Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing, 48198-48200 [E5-4419]
Download as PDF
48198
Federal Register / Vol. 70, No. 157 / Tuesday, August 16, 2005 / Notices
requirements with respect to at least one
contention will not be permitted to
participate as a party.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene, and have the opportunity to
participate fully in the conduct of the
hearing.
If a hearing is requested, the
Commission will make a final
determination on the issue of no
significant hazards consideration. The
final determination will serve to decide
when the hearing is held. If the final
determination is that the amendment
request involves no significant hazards
consideration, the Commission may
issue the amendment and make it
immediately effective, notwithstanding
the request for a hearing. Any hearing
held would take place after issuance of
the amendment. If the final
determination is that the amendment
request involves a significant hazards
consideration, any hearing held would
take place before the issuance of any
amendment.
Nontimely requests and/or petitions
and contentions will not be entertained
absent a determination by the
Commission or the presiding officer of
the Atomic Safety and Licensing Board
that the petition, request and/or the
contentions should be granted based on
a balancing of the factors specified in 10
CFR 2.309(c)(1)(i)–(viii).
A request for a hearing or a petition
for leave to intervene must be filed by:
(1) First class mail addressed to the
Office of the Secretary of the
Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, Attention: Rulemaking and
Adjudications Staff; (2) courier, express
mail, and expedited delivery services:
Office of the Secretary, Sixteenth Floor,
One White Flint North, 11555 Rockville
Pike, Rockville, Maryland, 20852,
Attention: Rulemaking and
Adjudications Staff; (3) E-mail
addressed to the Office of the Secretary,
U.S. Nuclear Regulatory Commission,
HEARINGDOCKET@NRC.GOV; or (4)
facsimile transmission addressed to the
Office of the Secretary, U.S. Nuclear
Regulatory Commission, Washington,
DC, Attention: Rulemakings and
Adjudications Staff at (301) 415–1101,
verification number is (301) 415–1966.
A copy of the request for hearing and
petition for leave to intervene should
also be sent to the Office of the General
Counsel, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, and it is requested that copies be
transmitted either by means of facsimile
transmission to 301–415–3725 or by email to OGCMailCenter@nrc.gov. A copy
VerDate jul<14>2003
18:02 Aug 15, 2005
Jkt 205001
of the request for hearing and petition
for leave to intervene should also be
sent to Nicholas S. Reynolds, Esquire,
Winston and Strawn, 1700 K Street,
NW., Washington, DC 20006–3817,
attorney for the licensee.
For further details with respect to this
action, see the application for
amendment dated July 21, 2005, which
is available for public inspection at the
Commission’s Public Document Room
(PDR), located at One White Flint North,
Public File Area O1 F21, 11555
Rockville Pike (first floor), Rockville,
Maryland. Publicly available records
will be accessible electronically from
the ADAMS Public Electronic Reading
Room on the Internet at the NRC Web
site https://www.nrc.gov/readingrm.html. Persons who do not have
access to ADAMS or who encounter
problems in accessing the documents
located in ADAMS, should contact the
NRC PDR Reference staff by telephone
at 1–800–397–4209, 301–415–4737, or
by e-mail to pdr@nrc.gov.
Dated in Rockville, Maryland, this 9th day
of August 2005.
For the Nuclear Regulatory Commission.
Drew G. Holland,
Project Manager, Section 1, Project
Directorate IV, Division of Licensing Project
Management, Office of Nuclear Reactor
Regulation.
[FR Doc. E5–4418 Filed 8–15–05; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 50–266 and 50–301]
Nuclear Management Company, LLC;
Notice of Consideration of Issuance of
Amendments to Facility Operating
Licenses, Proposed No Significant
Hazards Consideration Determination,
and Opportunity for a Hearing
The U.S. Nuclear Regulatory
Commission (the Commission) is
considering issuance of amendments to
Facility Operating License Nos. DPR–24
and DPR–27 issued to Nuclear
Management Company, LLC (the
licensee), for operation of the Point
Beach Nuclear Plant (PBNP), Units 1
and 2, located in the Town of Two
Creeks, Manitowoc County, Wisconsin.
The proposed amendments would
revise the licensing basis as described in
the Point Beach Nuclear Plant Final
Safety Analysis Report to incorporate
the proposed Unit 1 reactor vessel head
(RVH) drop analysis and the revised
Unit 2 RVH drop analysis.
Before issuance of the proposed
license amendments, the Commission
PO 00000
Frm 00100
Fmt 4703
Sfmt 4703
will have made findings required by the
Atomic Energy Act of 1954, as amended
(the Act), and the Commission’s
regulations.
The Commission has made a
proposed determination that the
amendment requests involve no
significant hazards consideration. Under
the Commission’s regulations in title 10
of the Code Of Federal Regulations (10
CFR), section 50.92, this means that
operation of the facility in accordance
with the proposed amendments would
not (1) involve a significant increase in
the probability or consequences of an
accident previously evaluated; or (2)
create the possibility of a new or
different kind of accident from any
accident previously evaluated; or (3)
involve a significant reduction in a
margin of safety. As required by 10 CFR
50.91(a), the licensee has provided its
analysis of the issue of no significant
hazards consideration, which is
presented below:
1. Would the proposed amendment involve
a significant increase in the probability or
consequences of any accident previously
evaluated?
Response: No.
The proposed change incorporates the
revised heavy load analysis into the PBNP
FSAR. This analysis involves the postulated
drop of the RVH [reactor vessel head] over a
reactor vessel containing fuel assemblies.
Assuming that the BMI [bottom mounted
instrument] tubes are severed as a result of
displacement of the reactor vessel, a decrease
in reactor coolant inventory will occur. Thus,
a RVH drop can be postulated as an initiator
of a Loss of Coolant Accident (LOCA) under
shutdown conditions.
A RVH drop is of sufficiently low
probability such that, for Unit 1, the
probability of a LOCA is not significantly
increased over the current licensing basis
large break LOCA. For Unit 2, the probability
is unchanged from the previously approved
RVH drop analysis.
For Unit 1, supplemental administrative
controls have been established to assure
continued availability of multiple
independent sources of water to provide core
cooling and makeup water well in excess of
the postulated LOCA. Containment closure
will also be established during this evolution.
No pressurization of the reactor coolant
system will occur as a result of this
postulated event. For Unit 2, the previously
approved administrative controls have been
revised, consistent with those submitted for
Unit 1 herein, to provide additional makeup
water capacity.
The calculated radiological consequences
of the postulated RVH drop are within those
calculated for the current licensing basis
large break LOCA. Therefore, the
consequences of a LOCA are not increased.
The proposed change is consistent with
safety analysis assumptions and resultant
consequences. All Technical Specifications
are satisfied and required equipment is
operable. Therefore, this change would not
E:\FR\FM\16AUN1.SGM
16AUN1
Federal Register / Vol. 70, No. 157 / Tuesday, August 16, 2005 / Notices
significantly increase the probability of
occurrence or consequences of any accident
previously evaluated.
2. Would the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
For Unit 1, the proposed change
incorporates the revised heavy load analysis
into the PBNP FSAR. This analysis involves
the postulated drop of the RVH over a reactor
vessel containing fuel assemblies. Assuming
that the BMI tubes are severed as a result of
displacement of the reactor vessel, a decrease
in reactor coolant inventory will occur. Thus,
a RVH drop can be postulated as an initiator
of a LOCA under shutdown conditions.
Adequate core cooling and makeup water
remains available from core cooling water
systems. Maintaining core cooling and
makeup and closing containment assures that
the drop of a RVH is bounded by the existing
licensing basis analysis for a LOCA. The drop
of a RVH was previously evaluated by the
NRC for Unit 2 in a safety evaluation dated
June 24, 2005. Therefore, the proposed
changes would not create the possibility of a
new or different kind of accident from any
previously evaluated.
3. Would the proposed amendment result
in a significant reduction in a margin of
safety?
Response: No.
For Unit 1, the proposed change
incorporates the revised heavy load analysis
into the PBNP FSAR. This analysis involves
the postulated drop of the RVH over a reactor
vessel containing fuel assemblies. Assuming
that the BMI tubes are severed as a result of
displacement of the reactor vessel, a decrease
in reactor coolant inventory will occur. Thus,
a RVH drop can be postulated as an initiator
of a LOCA under shutdown conditions.
The frequency and consequences of a RVH
drop are comparable to or within those of the
current licensing basis large break LOCA.
The proposed change does not alter any
safety limits, limiting safety system settings,
or limiting conditions for operation as
defined in the Technical Specifications. The
drop of a RVH was previously evaluated by
the NRC for Unit 2 in a safety evaluation
dated June 24, 2005. Therefore, the proposed
amendment does not result in a significant
reduction in a margin of safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
The Commission is seeking public
comments on this proposed
determination. Any comments received
within 30 days after the date of
publication of this notice will be
considered in making any final
determination.
Normally, the Commission will not
issue the amendments until the
expiration of 60 days after the date of
VerDate jul<14>2003
18:02 Aug 15, 2005
Jkt 205001
publication of this notice. The
Commission may issue the license
amendments before expiration of the 60day period provided that its final
determination is that the amendments
involve no significant hazards
consideration. In addition, the
Commission may issue the amendments
prior to the expiration of the 30-day
comment period should circumstances
change during the 30-day comment
period such that failure to act in a
timely way would result, for example in
derating or shutdown of the facility.
Should the Commission take action
prior to the expiration of either the
comment period or the notice period, it
will publish in the Federal Register a
notice of issuance. Should the
Commission make a final No Significant
Hazards Consideration Determination,
any hearing will take place after
issuance. The Commission expects that
the need to take this action will occur
very infrequently.
Written comments may be submitted
by mail to the Chief, Rules and
Directives Branch, Division of
Administrative Services, Office of
Administration, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, and should cite the publication
date and page number of this Federal
Register notice. Written comments may
also be delivered to Room 6D59, Two
White Flint North, 11545 Rockville
Pike, Rockville, Maryland, from 7:30
a.m. to 4:15 p.m. Federal workdays.
Documents may be examined, and/or
copied for a fee, at the NRC’s Public
Document Room (PDR), located at One
White Flint North, Public File Area O1
F21, 11555 Rockville Pike (first floor),
Rockville, Maryland.
The filing of requests for hearing and
petitions for leave to intervene is
discussed below.
Within 60 days after the date of
publication of this notice, the licensee
may file a request for a hearing with
respect to issuance of the amendments
to the subject facility operating license
and any person whose interest may be
affected by this proceeding and who
wishes to participate as a party in the
proceeding must file a written request
for a hearing and a petition for leave to
intervene. Requests for a hearing and a
petition for leave to intervene shall be
filed in accordance with the
Commission’s ‘‘Rules of Practice for
Domestic Licensing Proceedings’’ in 10
CFR part 2. Interested persons should
consult a current copy of 10 CFR 2.309,
which is available at the Commission’s
PDR, located at One White Flint North,
Public File Area O1F21, 11555
Rockville Pike (first floor), Rockville,
Maryland. Publicly available records
PO 00000
Frm 00101
Fmt 4703
Sfmt 4703
48199
will be accessible from the Agencywide
Documents Access and Management
System’s (ADAMS) Public Electronic
Reading Room on the Internet at the
NRC Web site, https://www.nrc.gov/
reading-rm/doc-collections/cfr/. If a
request for a hearing or petition for
leave to intervene is filed by the above
date, the Commission or a presiding
officer designated by the Commission or
by the Chief Administrative Judge of the
Atomic Safety and Licensing Board
Panel, will rule on the request and/or
petition; and the Secretary or the Chief
Administrative Judge of the Atomic
Safety and Licensing Board will issue a
notice of a hearing or an appropriate
order.
As required by 10 CFR 2.309, a
petition for leave to intervene shall set
forth with particularity the interest of
the petitioner in the proceeding, and
how that interest may be affected by the
results of the proceeding. The petition
should specifically explain the reasons
why intervention should be permitted
with particular reference to the
following general requirements: (1) The
name, address and telephone number of
the requestor or petitioner; (2) the
nature of the requestor’s/petitioner’s
right under the Act to be made a party
to the proceeding; (3) the nature and
extent of the requestor’s/petitioner’s
property, financial, or other interest in
the proceeding; and (4) the possible
effect of any decision or order which
may be entered in the proceeding on the
requestor’s/petitioner’s interest. The
petition must also identify the specific
contentions which the petitioner/
requestor seeks to have litigated at the
proceeding.
Each contention must consist of a
specific statement of the issue of law or
fact to be raised or controverted. In
addition, the petitioner/requestor shall
provide a brief explanation of the bases
for the contention and a concise
statement of the alleged facts or expert
opinion which support the contention
and on which the petitioner intends to
rely in proving the contention at the
hearing. The petitioner/requestor must
also provide references to those specific
sources and documents of which the
petitioner is aware and on which the
petitioner intends to rely to establish
those facts or expert opinion. The
petition must include sufficient
information to show that a genuine
dispute exists with the applicant on a
material issue of law or fact.
Contentions shall be limited to matters
within the scope of the amendment
under consideration. The contention
must be one which, if proven, would
entitle the petitioner to relief. A
petitioner/requestor who fails to satisfy
E:\FR\FM\16AUN1.SGM
16AUN1
48200
Federal Register / Vol. 70, No. 157 / Tuesday, August 16, 2005 / Notices
these requirements with respect to at
least one contention will not be
permitted to participate as a party.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene, and have the opportunity to
participate fully in the conduct of the
hearing.
If a hearing is requested, the
Commission will make a final
determination on the issue of no
significant hazards consideration. The
final determination will serve to decide
when the hearing is held. If the final
determination is that the amendment
request involves no significant hazards
consideration, the Commission may
issue the amendment and make it
immediately effective, notwithstanding
the request for a hearing. Any hearing
held would take place after issuance of
the amendment. If the final
determination is that the amendment
request involves a significant hazards
consideration, any hearing held would
take place before the issuance of any
amendment.
Nontimely requests and/or petitions
and contentions will not be entertained
absent a determination by the
Commission or the presiding officer of
the Atomic Safety and Licensing Board
that the petition, request and/or the
contentions should be granted based on
a balancing of the factors specified in 10
CFR 2.309(c)(1)(i)–(viii).
A request for a hearing or a petition
for leave to intervene must be filed by:
(1) First class mail addressed to the
Office of the Secretary of the
Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, Attention: Rulemaking and
Adjudications Staff; (2) courier, express
mail, and expedited delivery services:
Office of the Secretary, Sixteenth Floor,
One White Flint North, 11555 Rockville
Pike, Rockville, Maryland, 20852,
Attention: Rulemaking and
Adjudications Staff; (3) E-mail
addressed to the Office of the Secretary,
U.S. Nuclear Regulatory Commission,
hearingdocket@nrc.gov; or (4) facsimile
transmission addressed to the Office of
the Secretary, U.S. Nuclear Regulatory
Commission, Washington, DC,
Attention: Rulemaking and
Adjudications Staff at (301) 415–1101,
verification number is (301) 415–1966.
A copy of the request for hearing and
petition for leave to intervene should
also be sent to the Office of the General
Counsel, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, and it is requested that copies be
transmitted either by means of facsimile
transmission to 301–415–3725 or by email to OGCMailCenter@nrc.gov. A copy
VerDate jul<14>2003
18:02 Aug 15, 2005
Jkt 205001
of the request for hearing and petition
for leave to intervene should also be
sent to the Jonathan Rogoff, Esquire,
Vice President, Counsel & Secretary,
Nuclear Management Company, LLC,
700 First Street, Hudson, WI 54016,
attorney for the licensee.
For further details with respect to this
action, see the application for
amendments dated July 24, 2005, which
is available for public inspection at the
Commission’s PDR, located at One
White Flint North, File Public Area O1
F21, 11555 Rockville Pike (first floor),
Rockville, Maryland. Publicly available
records will be accessible from the
Agencywide Documents Access and
Management System’s (ADAMS) Public
Electronic Reading Room on the Internet
at the NRC Web site, https://
www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to
ADAMS or who encounter problems in
accessing the documents located in
ADAMS, should contact the NRC PDR
Reference staff by telephone at 1–800–
397–4209, 301–415–4737, or by e-mail
to pdr@nrc.gov.
Dated at Rockville, Maryland, this 10th day
of August 2005.
For the Nuclear Regulatory Commission.
Harold K. Chernoff,
Senior Project Manager, Section 1, Project
Directorate III, Division of Licensing Project
Management, Office of Nuclear Reactor
Regulation.
[FR Doc. E5–4419 Filed 8–15–05; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
Sunshine Federal Register Notice
AGENCY HOLDING THE MEETINGS: Nuclear
Regulatory Commission.
DATE: Weeks of August 15, 22, 29, and
September 5, 12, 19, 2005.
PLACE: Commissioners’ Conference
Room, 11555 Rockville Pike, Rockville,
Maryland.
STATUS: Public and closed.
MATTERS TO BE CONSIDERED:
Week of August 15, 2005
Tuesday, August 16, 2005.
10 a.m. Meeting with Organization of
Agreement States (OAS) and the
Conference of Radiation Control
Program Directors CRCPD) (Public
Meeting) (Contact: Shawn Smith,
301–415–2620).
This meeting will be Web cast live at
the Web address—https://www.nrc.gov.
1 p.m. Discussion of Security Issues
(Closed—Ex. 3 & 9).
PO 00000
Frm 00102
Fmt 4703
Sfmt 4703
Week of August 22, 2005—Tentative
There are no meetings scheduled for
the week of August 22, 2005.
Week of August 29, 2005—Tentative
There are no meetings scheduled for
the week of August 29, 2005.
Week of September 5, 2005—Tentative
Wednesday, September 7, 2005.
9 a.m. Discussion of Security Issues
(Closed—Ex. 1).
1:30 p.m. Discussion of Security Issues
(Closed—Ex. 3).
Week of September 12, 2005—Tentative
There are no meetings scheduled for
the week of September 12, 2005.
Week of September 19, 2005—Tentative
There are no meetings scheduled for
the week of September 19, 2005. *The
schedule for Commission meetings is
subject to change on short notice. To
verify the status of meetings call
(recording)—(301) 415–1292. Contact
person for more information: Michelle
Schroll, (301) 415–1662.
*
*
*
*
*
The NRC Commission Meeting
Schedule can be found on the Internet
at: https://www.nrc.gov/what-we-do/
policy-making/schedule.html.
*
*
*
*
*
The NRC provides reasonable
accommodation to individuals with
disabilities where appropriate. If you
need a reasonable accommodation to
participate in these public meetings, or
need this meeting notice or the
transcript or other information from the
public meetings in another format (e.g.,
braille, large print), please notify the
NRC’s Disability Program Coordinator,
August Spector, at 301–415–7080, TDD:
301–415–2100, or by e-mail at
aks@nrc.gov. Determinations on
requests for reasonable accommodation
will be made on a case-by-case basis.
*
*
*
*
*
This notice is distributed by mail to
several hundred subscribers; if you no
longer wish to receive it, or would like
to be added to the distribution, please
contact the Office of the Secretary,
Washington, DC 20555 (301–415–1969).
In addition, distribution of this meeting
notice over the Internet system is
available. If you are interested in
receiving this Commission meeting
schedule electronically, please send an
electronic message to dkw@nrc.gov.
Dated: August 11, 2005.
R. Michelle Schroll,
Office of the Secretary.
[FR Doc. 05–16256 Filed 8–12–05; 10:22 am]
BILLING CODE 7590–01–M
E:\FR\FM\16AUN1.SGM
16AUN1
Agencies
[Federal Register Volume 70, Number 157 (Tuesday, August 16, 2005)]
[Notices]
[Pages 48198-48200]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-4419]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-266 and 50-301]
Nuclear Management Company, LLC; Notice of Consideration of
Issuance of Amendments to Facility Operating Licenses, Proposed No
Significant Hazards Consideration Determination, and Opportunity for a
Hearing
The U.S. Nuclear Regulatory Commission (the Commission) is
considering issuance of amendments to Facility Operating License Nos.
DPR-24 and DPR-27 issued to Nuclear Management Company, LLC (the
licensee), for operation of the Point Beach Nuclear Plant (PBNP), Units
1 and 2, located in the Town of Two Creeks, Manitowoc County,
Wisconsin.
The proposed amendments would revise the licensing basis as
described in the Point Beach Nuclear Plant Final Safety Analysis Report
to incorporate the proposed Unit 1 reactor vessel head (RVH) drop
analysis and the revised Unit 2 RVH drop analysis.
Before issuance of the proposed license amendments, the Commission
will have made findings required by the Atomic Energy Act of 1954, as
amended (the Act), and the Commission's regulations.
The Commission has made a proposed determination that the amendment
requests involve no significant hazards consideration. Under the
Commission's regulations in title 10 of the Code Of Federal Regulations
(10 CFR), section 50.92, this means that operation of the facility in
accordance with the proposed amendments would not (1) involve a
significant increase in the probability or consequences of an accident
previously evaluated; or (2) create the possibility of a new or
different kind of accident from any accident previously evaluated; or
(3) involve a significant reduction in a margin of safety. As required
by 10 CFR 50.91(a), the licensee has provided its analysis of the issue
of no significant hazards consideration, which is presented below:
1. Would the proposed amendment involve a significant increase
in the probability or consequences of any accident previously
evaluated?
Response: No.
The proposed change incorporates the revised heavy load analysis
into the PBNP FSAR. This analysis involves the postulated drop of
the RVH [reactor vessel head] over a reactor vessel containing fuel
assemblies. Assuming that the BMI [bottom mounted instrument] tubes
are severed as a result of displacement of the reactor vessel, a
decrease in reactor coolant inventory will occur. Thus, a RVH drop
can be postulated as an initiator of a Loss of Coolant Accident
(LOCA) under shutdown conditions.
A RVH drop is of sufficiently low probability such that, for
Unit 1, the probability of a LOCA is not significantly increased
over the current licensing basis large break LOCA. For Unit 2, the
probability is unchanged from the previously approved RVH drop
analysis.
For Unit 1, supplemental administrative controls have been
established to assure continued availability of multiple independent
sources of water to provide core cooling and makeup water well in
excess of the postulated LOCA. Containment closure will also be
established during this evolution. No pressurization of the reactor
coolant system will occur as a result of this postulated event. For
Unit 2, the previously approved administrative controls have been
revised, consistent with those submitted for Unit 1 herein, to
provide additional makeup water capacity.
The calculated radiological consequences of the postulated RVH
drop are within those calculated for the current licensing basis
large break LOCA. Therefore, the consequences of a LOCA are not
increased. The proposed change is consistent with safety analysis
assumptions and resultant consequences. All Technical Specifications
are satisfied and required equipment is operable. Therefore, this
change would not
[[Page 48199]]
significantly increase the probability of occurrence or consequences
of any accident previously evaluated.
2. Would the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
For Unit 1, the proposed change incorporates the revised heavy
load analysis into the PBNP FSAR. This analysis involves the
postulated drop of the RVH over a reactor vessel containing fuel
assemblies. Assuming that the BMI tubes are severed as a result of
displacement of the reactor vessel, a decrease in reactor coolant
inventory will occur. Thus, a RVH drop can be postulated as an
initiator of a LOCA under shutdown conditions.
Adequate core cooling and makeup water remains available from
core cooling water systems. Maintaining core cooling and makeup and
closing containment assures that the drop of a RVH is bounded by the
existing licensing basis analysis for a LOCA. The drop of a RVH was
previously evaluated by the NRC for Unit 2 in a safety evaluation
dated June 24, 2005. Therefore, the proposed changes would not
create the possibility of a new or different kind of accident from
any previously evaluated.
3. Would the proposed amendment result in a significant
reduction in a margin of safety?
Response: No.
For Unit 1, the proposed change incorporates the revised heavy
load analysis into the PBNP FSAR. This analysis involves the
postulated drop of the RVH over a reactor vessel containing fuel
assemblies. Assuming that the BMI tubes are severed as a result of
displacement of the reactor vessel, a decrease in reactor coolant
inventory will occur. Thus, a RVH drop can be postulated as an
initiator of a LOCA under shutdown conditions.
The frequency and consequences of a RVH drop are comparable to
or within those of the current licensing basis large break LOCA. The
proposed change does not alter any safety limits, limiting safety
system settings, or limiting conditions for operation as defined in
the Technical Specifications. The drop of a RVH was previously
evaluated by the NRC for Unit 2 in a safety evaluation dated June
24, 2005. Therefore, the proposed amendment does not result in a
significant reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
The Commission is seeking public comments on this proposed
determination. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendments until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendments before expiration of the
60-day period provided that its final determination is that the
amendments involve no significant hazards consideration. In addition,
the Commission may issue the amendments prior to the expiration of the
30-day comment period should circumstances change during the 30-day
comment period such that failure to act in a timely way would result,
for example in derating or shutdown of the facility. Should the
Commission take action prior to the expiration of either the comment
period or the notice period, it will publish in the Federal Register a
notice of issuance. Should the Commission make a final No Significant
Hazards Consideration Determination, any hearing will take place after
issuance. The Commission expects that the need to take this action will
occur very infrequently.
Written comments may be submitted by mail to the Chief, Rules and
Directives Branch, Division of Administrative Services, Office of
Administration, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001, and should cite the publication date and page number of
this Federal Register notice. Written comments may also be delivered to
Room 6D59, Two White Flint North, 11545 Rockville Pike, Rockville,
Maryland, from 7:30 a.m. to 4:15 p.m. Federal workdays. Documents may
be examined, and/or copied for a fee, at the NRC's Public Document Room
(PDR), located at One White Flint North, Public File Area O1 F21, 11555
Rockville Pike (first floor), Rockville, Maryland.
The filing of requests for hearing and petitions for leave to
intervene is discussed below.
Within 60 days after the date of publication of this notice, the
licensee may file a request for a hearing with respect to issuance of
the amendments to the subject facility operating license and any person
whose interest may be affected by this proceeding and who wishes to
participate as a party in the proceeding must file a written request
for a hearing and a petition for leave to intervene. Requests for a
hearing and a petition for leave to intervene shall be filed in
accordance with the Commission's ``Rules of Practice for Domestic
Licensing Proceedings'' in 10 CFR part 2. Interested persons should
consult a current copy of 10 CFR 2.309, which is available at the
Commission's PDR, located at One White Flint North, Public File Area
O1F21, 11555 Rockville Pike (first floor), Rockville, Maryland.
Publicly available records will be accessible from the Agencywide
Documents Access and Management System's (ADAMS) Public Electronic
Reading Room on the Internet at the NRC Web site, https://www.nrc.gov/
reading-rm/doc-collections/cfr/. If a request for a hearing or petition
for leave to intervene is filed by the above date, the Commission or a
presiding officer designated by the Commission or by the Chief
Administrative Judge of the Atomic Safety and Licensing Board Panel,
will rule on the request and/or petition; and the Secretary or the
Chief Administrative Judge of the Atomic Safety and Licensing Board
will issue a notice of a hearing or an appropriate order.
As required by 10 CFR 2.309, a petition for leave to intervene
shall set forth with particularity the interest of the petitioner in
the proceeding, and how that interest may be affected by the results of
the proceeding. The petition should specifically explain the reasons
why intervention should be permitted with particular reference to the
following general requirements: (1) The name, address and telephone
number of the requestor or petitioner; (2) the nature of the
requestor's/petitioner's right under the Act to be made a party to the
proceeding; (3) the nature and extent of the requestor's/petitioner's
property, financial, or other interest in the proceeding; and (4) the
possible effect of any decision or order which may be entered in the
proceeding on the requestor's/petitioner's interest. The petition must
also identify the specific contentions which the petitioner/requestor
seeks to have litigated at the proceeding.
Each contention must consist of a specific statement of the issue
of law or fact to be raised or controverted. In addition, the
petitioner/requestor shall provide a brief explanation of the bases for
the contention and a concise statement of the alleged facts or expert
opinion which support the contention and on which the petitioner
intends to rely in proving the contention at the hearing. The
petitioner/requestor must also provide references to those specific
sources and documents of which the petitioner is aware and on which the
petitioner intends to rely to establish those facts or expert opinion.
The petition must include sufficient information to show that a genuine
dispute exists with the applicant on a material issue of law or fact.
Contentions shall be limited to matters within the scope of the
amendment under consideration. The contention must be one which, if
proven, would entitle the petitioner to relief. A petitioner/requestor
who fails to satisfy
[[Page 48200]]
these requirements with respect to at least one contention will not be
permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing.
If a hearing is requested, the Commission will make a final
determination on the issue of no significant hazards consideration. The
final determination will serve to decide when the hearing is held. If
the final determination is that the amendment request involves no
significant hazards consideration, the Commission may issue the
amendment and make it immediately effective, notwithstanding the
request for a hearing. Any hearing held would take place after issuance
of the amendment. If the final determination is that the amendment
request involves a significant hazards consideration, any hearing held
would take place before the issuance of any amendment.
Nontimely requests and/or petitions and contentions will not be
entertained absent a determination by the Commission or the presiding
officer of the Atomic Safety and Licensing Board that the petition,
request and/or the contentions should be granted based on a balancing
of the factors specified in 10 CFR 2.309(c)(1)(i)-(viii).
A request for a hearing or a petition for leave to intervene must
be filed by: (1) First class mail addressed to the Office of the
Secretary of the Commission, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, Attention: Rulemaking and Adjudications
Staff; (2) courier, express mail, and expedited delivery services:
Office of the Secretary, Sixteenth Floor, One White Flint North, 11555
Rockville Pike, Rockville, Maryland, 20852, Attention: Rulemaking and
Adjudications Staff; (3) E-mail addressed to the Office of the
Secretary, U.S. Nuclear Regulatory Commission, hearingdocket@nrc.gov;
or (4) facsimile transmission addressed to the Office of the Secretary,
U.S. Nuclear Regulatory Commission, Washington, DC, Attention:
Rulemaking and Adjudications Staff at (301) 415-1101, verification
number is (301) 415-1966. A copy of the request for hearing and
petition for leave to intervene should also be sent to the Office of
the General Counsel, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001, and it is requested that copies be transmitted either by
means of facsimile transmission to 301-415-3725 or by e-mail to
OGCMailCenter@nrc.gov. A copy of the request for hearing and petition
for leave to intervene should also be sent to the Jonathan Rogoff,
Esquire, Vice President, Counsel & Secretary, Nuclear Management
Company, LLC, 700 First Street, Hudson, WI 54016, attorney for the
licensee.
For further details with respect to this action, see the
application for amendments dated July 24, 2005, which is available for
public inspection at the Commission's PDR, located at One White Flint
North, File Public Area O1 F21, 11555 Rockville Pike (first floor),
Rockville, Maryland. Publicly available records will be accessible from
the Agencywide Documents Access and Management System's (ADAMS) Public
Electronic Reading Room on the Internet at the NRC Web site, https://
www.nrc.gov/reading-rm/adams.html. Persons who do not have access to
ADAMS or who encounter problems in accessing the documents located in
ADAMS, should contact the NRC PDR Reference staff by telephone at 1-
800-397-4209, 301-415-4737, or by e-mail to pdr@nrc.gov.
Dated at Rockville, Maryland, this 10th day of August 2005.
For the Nuclear Regulatory Commission.
Harold K. Chernoff,
Senior Project Manager, Section 1, Project Directorate III, Division of
Licensing Project Management, Office of Nuclear Reactor Regulation.
[FR Doc. E5-4419 Filed 8-15-05; 8:45 am]