California Independent System Operator Corporation; Notice of FERC Staff Attendance, 47194 [E5-4366]
Download as PDF
47194
Federal Register / Vol. 70, No. 155 / Friday, August 12, 2005 / Notices
j. Cooperating Agencies: We are
asking Federal, State, local, and tribal
agencies with jurisdiction and/or
special expertise with respect to
environmental issues to cooperate with
us in the preparation of the
environmental document. Agencies who
would like to request cooperating status
should follow the instructions in item k
below.
k. Deadline for filing requests for
cooperating agency status: September
27, 2005.
All documents (original and eight
copies) should be filed with: Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
Requests for cooperating agency status
may be filed electronically via the
Internet in lieu of paper. The
Commission strongly encourages
electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
l. The applications are not ready for
environmental analysis at this time.
m. The Spokane River Hydroelectric
Project consists of four hydroelectric
developments with a total authorized
capacity of 122.92 megawatts (MW) as
follows:
(1) Upper Falls development is a runof-river facility consisting of a 366-footlong, 35.5-foot-high dam across the
north channel of the Spokane River; a
70-foot-long, 30-foot-high intake
structure across the south channel; an
800-acre-foot reservoir; a 350-foot-long,
18-foot-diameter penstock; and a singleunit powerhouse with a generator
nameplate capacity of 10 MW.
(2) Monroe Street development is a
run-of-river facility consisting of a 240foot-long, 24-foot-high dam; a 30-acrefoot reservoir; a 332-foot-long, 14-footdiameter penstock; and an underground
single-unit powerhouse with a generator
nameplate capacity of 14.82 MW.
(3) Nine Mile development is a runof-river facility consisting of a 466-footlong, 58-foot-high dam; a 4,600 acre-foot
reservoir; a 120-foot-long, 5 footdiameter diversion tunnel; and a 4-unit
powerhouse with a nameplate capacity
of 26.4 MW.
VerDate jul<14>2003
17:14 Aug 11, 2005
Jkt 205001
(4) Long Lake development is a
storage-type facility consisting of a 593foot-long, 213-foot-high main dam; a
247-foot-long, 108-foot-high cutoff dam;
a 105,080-acre-foot reservoir; four 236foot-long, 16-foot-diameter penstocks;
and a 4-unit powerhouse with a
nameplate capacity of 71.7 MW.
The Post Falls Hydroelectric Project
consists of a 431-foot-long, 31-foot-high
dam across the north channel of the
Spokane River; a 127-foot-long, 25-foothigh dam across the south channel; a
215-foot-long, 64-foot-high dam across
the middle channel; six 56-foot-long,
11.25-foot-diameter penstocks; and a 6unit powerhouse integral to the middle
channel dam with a generator
nameplate capacity of 14.75 MW. The
project impounds the upper 9 miles of
the Spokane River between the three
dams and the Coeur d’Alene Lake outlet
and influences water levels in Coeur
d’Alene Lake as well as portions of the
St. Joe River, St. Maries River, and
Coeur d’Alene River. Coeur d’Alene
Lake and the affected Spokane River, St.
Joe River, St. Maries River, and Coeur
d’Alene River reaches provide a
combined usable storage capacity of
223,100 acre-feet.
n. Copies of the applications are
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the appropriate
docket number excluding the last three
digits in the docket number field to
access the document. For assistance,
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. Copies are also
available for inspection and
reproduction at the address in item h
above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to these or other pending
projects. For assistance, contact FERC
Online Support.
o. With this notice, we are initiating
consultation with the Washington and
Idaho State Historic Preservation
Officers (SHPOs), as required by section
106 of the National Historic
Preservation Act, and the regulations of
the Advisory Council on Historic
Preservation, 36 CFR 800.4.
p. Procedural schedule and final
amendments: The applications will be
processed according to the following
Hydro Licensing Schedule. Revisions to
the schedule will be made as needed.
Notice soliciting final terms and conditions—
February 2006;
Notice of the availability of the draft EIS—
September 2006;
Notice of the availability of the final EIS—
March 2007;
Ready for Commission’s decision on the
application—July 2007.
Final amendments to the applications
must be filed with the Commission no
later than 30 days from the issuance
date of the notice soliciting final terms
and conditions.
Magalie R. Salas,
Secretary.
[FR Doc. E5–4369 Filed 8–11–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER02–1656–000]
California Independent System
Operator Corporation; Notice of FERC
Staff Attendance
August 5, 2005.
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that on August 16, 2005,
members of its staff will attend a
stakeholder meeting on the California
Independent System Operator
Corporation’s (CAISO) proposed
changes to its tariff. The purpose of this
meeting is to receive stakeholder input
on: (1) the CAISO’s proposed simplified
and revised tariff; and (2) the CAISO’s
proposed Market Redesign and
Technology Upgrade (MRTU) tariff
language. This meeting will be held at
the CAISO’s facility, located at 151 Blue
Ravine Road, Folsom, CA 95630.
Sponsored by the CAISO, the meeting
is open to the public, and staff’s
attendance is part of the Commission’s
ongoing outreach efforts. The meeting
may discuss matters at issue in Docket
No. ER02–1656–000.
For further information, contact
Katherine Gensler at
katherine.gensler@ferc.gov; (916) 294–
0275.
Magalie R. Salas,
Secretary.
[FR Doc. E5–4366 Filed 8–11–05; 8:45 am]
BILLING CODE 6717–01–P
Issue Acceptance letter—October 2005;
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
E:\FR\FM\12AUN1.SGM
12AUN1
Agencies
[Federal Register Volume 70, Number 155 (Friday, August 12, 2005)]
[Notices]
[Page 47194]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-4366]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER02-1656-000]
California Independent System Operator Corporation; Notice of
FERC Staff Attendance
August 5, 2005.
The Federal Energy Regulatory Commission (Commission) hereby gives
notice that on August 16, 2005, members of its staff will attend a
stakeholder meeting on the California Independent System Operator
Corporation's (CAISO) proposed changes to its tariff. The purpose of
this meeting is to receive stakeholder input on: (1) the CAISO's
proposed simplified and revised tariff; and (2) the CAISO's proposed
Market Redesign and Technology Upgrade (MRTU) tariff language. This
meeting will be held at the CAISO's facility, located at 151 Blue
Ravine Road, Folsom, CA 95630.
Sponsored by the CAISO, the meeting is open to the public, and
staff's attendance is part of the Commission's ongoing outreach
efforts. The meeting may discuss matters at issue in Docket No. ER02-
1656-000.
For further information, contact Katherine Gensler at
katherine.gensler@ferc.gov; (916) 294-0275.
Magalie R. Salas,
Secretary.