Download as PDF 47194 Federal Register / Vol. 70, No. 155 / Friday, August 12, 2005 / Notices j. Cooperating Agencies: We are asking Federal, State, local, and tribal agencies with jurisdiction and/or special expertise with respect to environmental issues to cooperate with us in the preparation of the environmental document. Agencies who would like to request cooperating status should follow the instructions in item k below. k. Deadline for filing requests for cooperating agency status: September 27, 2005. All documents (original and eight copies) should be filed with: Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. Requests for cooperating agency status may be filed electronically via the Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov) under the ‘‘e-Filing’’ link. l. The applications are not ready for environmental analysis at this time. m. The Spokane River Hydroelectric Project consists of four hydroelectric developments with a total authorized capacity of 122.92 megawatts (MW) as follows: (1) Upper Falls development is a runof-river facility consisting of a 366-footlong, 35.5-foot-high dam across the north channel of the Spokane River; a 70-foot-long, 30-foot-high intake structure across the south channel; an 800-acre-foot reservoir; a 350-foot-long, 18-foot-diameter penstock; and a singleunit powerhouse with a generator nameplate capacity of 10 MW. (2) Monroe Street development is a run-of-river facility consisting of a 240foot-long, 24-foot-high dam; a 30-acrefoot reservoir; a 332-foot-long, 14-footdiameter penstock; and an underground single-unit powerhouse with a generator nameplate capacity of 14.82 MW. (3) Nine Mile development is a runof-river facility consisting of a 466-footlong, 58-foot-high dam; a 4,600 acre-foot reservoir; a 120-foot-long, 5 footdiameter diversion tunnel; and a 4-unit powerhouse with a nameplate capacity of 26.4 MW. VerDate jul<14>2003 17:14 Aug 11, 2005 Jkt 205001 (4) Long Lake development is a storage-type facility consisting of a 593foot-long, 213-foot-high main dam; a 247-foot-long, 108-foot-high cutoff dam; a 105,080-acre-foot reservoir; four 236foot-long, 16-foot-diameter penstocks; and a 4-unit powerhouse with a nameplate capacity of 71.7 MW. The Post Falls Hydroelectric Project consists of a 431-foot-long, 31-foot-high dam across the north channel of the Spokane River; a 127-foot-long, 25-foothigh dam across the south channel; a 215-foot-long, 64-foot-high dam across the middle channel; six 56-foot-long, 11.25-foot-diameter penstocks; and a 6unit powerhouse integral to the middle channel dam with a generator nameplate capacity of 14.75 MW. The project impounds the upper 9 miles of the Spokane River between the three dams and the Coeur d’Alene Lake outlet and influences water levels in Coeur d’Alene Lake as well as portions of the St. Joe River, St. Maries River, and Coeur d’Alene River. Coeur d’Alene Lake and the affected Spokane River, St. Joe River, St. Maries River, and Coeur d’Alene River reaches provide a combined usable storage capacity of 223,100 acre-feet. n. Copies of the applications are available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the appropriate docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. Copies are also available for inspection and reproduction at the address in item h above. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to these or other pending projects. For assistance, contact FERC Online Support. o. With this notice, we are initiating consultation with the Washington and Idaho State Historic Preservation Officers (SHPOs), as required by section 106 of the National Historic Preservation Act, and the regulations of the Advisory Council on Historic Preservation, 36 CFR 800.4. p. Procedural schedule and final amendments: The applications will be processed according to the following Hydro Licensing Schedule. Revisions to the schedule will be made as needed. Notice soliciting final terms and conditions— February 2006; Notice of the availability of the draft EIS— September 2006; Notice of the availability of the final EIS— March 2007; Ready for Commission’s decision on the application—July 2007. Final amendments to the applications must be filed with the Commission no later than 30 days from the issuance date of the notice soliciting final terms and conditions. Magalie R. Salas, Secretary. [FR Doc. E5–4369 Filed 8–11–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER02–1656–000] California Independent System Operator Corporation; Notice of FERC Staff Attendance August 5, 2005. The Federal Energy Regulatory Commission (Commission) hereby gives notice that on August 16, 2005, members of its staff will attend a stakeholder meeting on the California Independent System Operator Corporation’s (CAISO) proposed changes to its tariff. The purpose of this meeting is to receive stakeholder input on: (1) the CAISO’s proposed simplified and revised tariff; and (2) the CAISO’s proposed Market Redesign and Technology Upgrade (MRTU) tariff language. This meeting will be held at the CAISO’s facility, located at 151 Blue Ravine Road, Folsom, CA 95630. Sponsored by the CAISO, the meeting is open to the public, and staff’s attendance is part of the Commission’s ongoing outreach efforts. The meeting may discuss matters at issue in Docket No. ER02–1656–000. For further information, contact Katherine Gensler at katherine.gensler@ferc.gov; (916) 294– 0275. Magalie R. Salas, Secretary. [FR Doc. E5–4366 Filed 8–11–05; 8:45 am] BILLING CODE 6717–01–P Issue Acceptance letter—October 2005; PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 E:\FR\FM\12AUN1.SGM 12AUN1

Agencies

[Federal Register Volume 70, Number 155 (Friday, August 12, 2005)]
[Notices]
[Page 47194]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-4366]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER02-1656-000]


California Independent System Operator Corporation; Notice of 
FERC Staff Attendance

August 5, 2005.
    The Federal Energy Regulatory Commission (Commission) hereby gives 
notice that on August 16, 2005, members of its staff will attend a 
stakeholder meeting on the California Independent System Operator 
Corporation's (CAISO) proposed changes to its tariff. The purpose of 
this meeting is to receive stakeholder input on: (1) the CAISO's 
proposed simplified and revised tariff; and (2) the CAISO's proposed 
Market Redesign and Technology Upgrade (MRTU) tariff language. This 
meeting will be held at the CAISO's facility, located at 151 Blue 
Ravine Road, Folsom, CA 95630.
    Sponsored by the CAISO, the meeting is open to the public, and 
staff's attendance is part of the Commission's ongoing outreach 
efforts. The meeting may discuss matters at issue in Docket No. ER02-
1656-000.
    For further information, contact Katherine Gensler at 
katherine.gensler@ferc.gov; (916) 294-0275.

Magalie R. Salas,
Secretary.