Environmental Impacts Statements; Notice of Availability, 47199 [05-16036]

Download as PDF Federal Register / Vol. 70, No. 155 / Friday, August 12, 2005 / Notices Draft EISs EIS No. 20050262, ERP No. D–FHW– D40333–DC, Klingle Road Reconstruction Project, Reconstructing for Vehicular and Recreational Uses, Between Porter Street, NW., and Cortland Place, NW., Funding, Washington, DC Summary: EPA has environmental concerns about the proposed project related to hazardous materials, specifically possible lead contamination of Klingle Creek, as well as noise impacts and the sufficient delineation of flood hazards. Rating EC2. Final EISs EIS No. 20050208, ERP No. F–AFS– 65381–SD, Sioux Ranger District Oil and Gas Leasing Project, Implementation, Sioux Ranger District, Custer National, Harding County, SD Summary: No formal comment letter was sent to the preparing agency. EIS No. 20050233, ERP No. F–FHW– F40420–MI, I–75 from M–102 to M–59 Proposed Widening and Reconstruction, Transportation Improvements, Funding, NPDES Permit and U.S. Army COE Section 404 Permit, Oakland County, MI Summary: EPA has no objections to the preferred alternative. EIS No. 20050252, ERP No. F–NPS– J61105–CO, Colorado National Monument General Management Plan, Implementation, Mesa County, CO Summary: EPA’s major concerns have been addressed in the final EIS; therefore, EPA has no objections to the proposed action. EIS No. 20050277, ERP No. F–FHW– H40172–MO, U.S. Route 67 Corridor Project, Improvements from south of Fredericktown to south of Neelyville, Madison, Wayne and Butler Counties, MO Summary: EPA has no objections to the preferred alternative. EIS No. 20050282, ERP No. F–FHW– F40424–OH, U.S. 33 Nelsonville Bypass Project, To Upgrade Existing Four-Lane Controlled Access Expressway between Haydenville in Hocking County and New Floodwood in Hocking and Athens Counties, OH Summary: EPA has no objections to the proposed project and preferred alternative. Dated: August 9, 2005. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 05–16035 Filed 8–11–05; 8:45 am] BILLING CODE 6560–50–P VerDate jul<14>2003 17:14 Aug 11, 2005 Jkt 205001 ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6666–3] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/ Weekly receipt of Environmental Impact Statements Filed 8/1/2005 Through 8/5/2005 Pursuant to 40 CFR 1506.9. EIS No. 20050325, Draft EIS, AFS, WV, Programmatic—Monongahela National Forest Plan Revision, Proposes to Revise Land and Resource Management Plan, Barbour, Grant, Greebrier, Nicholas, Pendleton, Pocahontab, Preston, Randolph, Tucker, Webster Counties, WV, Comment Period Ends: 09/26/2005, Contact: Clyde Thompson 304–636– 1800 EIS No. 20050326, Final EIS, AFS, CA, Burlington Ridge Trails Project, To Eliminate, Reconstruct/or Reroute Unsound Trail Sections, Tahoe National Forest, Yuba River Ranger District, Camptonville, Nevada County, CA, Wait Period Ends: 09/26/ 2005, Contact: Mary Furney 530–478– 6263 EIS No. 20050327, Final EIS, AFS, CO, County Line Vegetation Management Project, Salvaging Spruce Beetle Infected Trees and Thinning SpruceFir Stand, Rio Grande National Forest, Conejos Peak Ranger District, Conejos County, CO, Wait Period Ends: 09/12/ 2005, Contact: John Murphy 719–852– 5941 EIS No. 20050328, Draft EIS, FHW, LA, US 90 Corridor, Proposed Interstate Highway 49 (I49 ) South Improvement from Raceland to the Davis Pond Diversion Canal, Section of Independent Utility 1 (SIU 1), Lafourche and St. Charles Parishes, LA, Comment Period Ends: 09/30/ 2005, Contact: William C. Farr 225– 757–7615 EIS No. 20050329, Final EIS, NPS, ID, Craters of the Moon National Monument and Preserve, Update and Consolidate Management Plans, into One Comprehensive Plan, Snake River Plain, Butte, Blaine, Lincoln, and Minidoka Counties, ID, Wait Period Ends: 09/12/2005, Contact: Adrienne Anderson 303–987–6730 EIS No. 20050330, Final EIS, AFS, 00, Black-Tailed Prairie Dog Conservation and Management on the Nebraska National Forest and Associated Units, Implementation, Dawes, Sioux Blaine, PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 47199 Cherry, Thomas Counties, NE and Custer, Fall River, Jackson, Pennington, Jones, Lyman, Stanley Counties, SD, Wait Period Ends:, 09/ 12/2005 Contact: Jeffrey S. Abegglen 308–432–4475 EIS No. 20050331, Final EIS, COE, TX, Programmatic—Lower Colorado River Basin Study, Provide Flood Damage Reduction and Ecosystem Restoration, Colorado River, TX, Wait Period Ends: 09/12/2005, Contact: Rob Newman 817–886–1762 EIS No. 20050332, Final EIS, AFS, AK, Couverden Timer Sales, Harvesting Timber, NPDES, Coast Guard Bridge Permit, U.S. Army COE Section 10 and 404 Permits, Tongass National Forest, Juneau Ranger District, Chilkat Peninsula, AK, Wait Period Ends: 09/ 12/2005, Contact: Dave Carr 907–790– 7402 Amended Notices EIS No. 20050209, Draft EIS, NPS, WY, Grand Teton National Park Transportation Plan, Implementation, Grand Teton National park, Teton County, WY, Comment Period Ends: 08/25/2005, Contact: Adrienne Anderson 303–987–6730 Revision of FR Notice Published on 06/03/2005: Extending the Comment Period from 08/01/2005 to 08/25/2005. Dated: August 9, 2005. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 05–16036 Filed 8–11–05; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [FRL–7951–7] Notice of a Scientific Peer Review Meeting to Review the Document: The Inventory of Sources and Environmental Releases of Dioxin-Like Compounds in the U.S.: the Year 2000 Update, March, 2005 (EPA/600/P/03/ 002a) Environmental Protection Agency. ACTION: Notice of external peer-review panel meeting. AGENCY: SUMMARY: The U.S. Environmental Protection Agency (EPA) is announcing that ERG, an EPA contractor for external scientific peer review, will convene a panel of experts and organize and conduct an independent external peerreview workshop to review the draft report, ‘‘The Inventory of Sources and Environmental Releases of Dioxin-Like E:\FR\FM\12AUN1.SGM 12AUN1

Agencies

[Federal Register Volume 70, Number 155 (Friday, August 12, 2005)]
[Notices]
[Page 47199]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-16036]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6666-3]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/

Weekly receipt of Environmental Impact Statements
Filed 8/1/2005 Through 8/5/2005
Pursuant to 40 CFR 1506.9.
EIS No. 20050325, Draft EIS, AFS, WV, Programmatic--Monongahela 
National Forest Plan Revision, Proposes to Revise Land and Resource 
Management Plan, Barbour, Grant, Greebrier, Nicholas, Pendleton, 
Pocahontab, Preston, Randolph, Tucker, Webster Counties, WV, Comment 
Period Ends: 09/26/2005, Contact: Clyde Thompson 304-636-1800
EIS No. 20050326, Final EIS, AFS, CA, Burlington Ridge Trails Project, 
To Eliminate, Reconstruct/or Reroute Unsound Trail Sections, Tahoe 
National Forest, Yuba River Ranger District, Camptonville, Nevada 
County, CA, Wait Period Ends: 09/26/2005, Contact: Mary Furney 530-478-
6263
EIS No. 20050327, Final EIS, AFS, CO, County Line Vegetation Management 
Project, Salvaging Spruce Beetle Infected Trees and Thinning Spruce-Fir 
Stand, Rio Grande National Forest, Conejos Peak Ranger District, 
Conejos County, CO, Wait Period Ends: 09/12/2005, Contact: John Murphy 
719-852-5941
EIS No. 20050328, Draft EIS, FHW, LA, US 90 Corridor, Proposed 
Interstate Highway 49 (I49 ) South Improvement from Raceland to the 
Davis Pond Diversion Canal, Section of Independent Utility 1 (SIU 1), 
Lafourche and St. Charles Parishes, LA, Comment Period Ends: 09/30/
2005, Contact: William C. Farr 225-757-7615
EIS No. 20050329, Final EIS, NPS, ID, Craters of the Moon National 
Monument and Preserve, Update and Consolidate Management Plans, into 
One Comprehensive Plan, Snake River Plain, Butte, Blaine, Lincoln, and 
Minidoka Counties, ID, Wait Period Ends: 09/12/2005, Contact: Adrienne 
Anderson 303-987-6730
EIS No. 20050330, Final EIS, AFS, 00, Black-Tailed Prairie Dog 
Conservation and Management on the Nebraska National Forest and 
Associated Units, Implementation, Dawes, Sioux Blaine, Cherry, Thomas 
Counties, NE and Custer, Fall River, Jackson, Pennington, Jones, Lyman, 
Stanley Counties, SD, Wait Period Ends:, 09/12/2005 Contact: Jeffrey S. 
Abegglen 308-432-4475
EIS No. 20050331, Final EIS, COE, TX, Programmatic--Lower Colorado 
River Basin Study, Provide Flood Damage Reduction and Ecosystem 
Restoration, Colorado River, TX, Wait Period Ends: 09/12/2005, Contact: 
Rob Newman 817-886-1762
EIS No. 20050332, Final EIS, AFS, AK, Couverden Timer Sales, Harvesting 
Timber, NPDES, Coast Guard Bridge Permit, U.S. Army COE Section 10 and 
404 Permits, Tongass National Forest, Juneau Ranger District, Chilkat 
Peninsula, AK, Wait Period Ends: 09/12/2005, Contact: Dave Carr 907-
790-7402

Amended Notices

EIS No. 20050209, Draft EIS, NPS, WY, Grand Teton National Park 
Transportation Plan, Implementation, Grand Teton National park, Teton 
County, WY, Comment Period Ends: 08/25/2005, Contact: Adrienne Anderson 
303-987-6730 Revision of FR Notice Published on 06/03/2005: Extending 
the Comment Period from 08/01/2005 to 08/25/2005.

    Dated: August 9, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 05-16036 Filed 8-11-05; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.