Environmental Impacts Statements; Notice of Availability, 47199 [05-16036]
Download as PDF
Federal Register / Vol. 70, No. 155 / Friday, August 12, 2005 / Notices
Draft EISs
EIS No. 20050262, ERP No. D–FHW–
D40333–DC, Klingle Road
Reconstruction Project,
Reconstructing for Vehicular and
Recreational Uses, Between Porter
Street, NW., and Cortland Place, NW.,
Funding, Washington, DC
Summary: EPA has environmental
concerns about the proposed project
related to hazardous materials,
specifically possible lead contamination
of Klingle Creek, as well as noise
impacts and the sufficient delineation of
flood hazards. Rating EC2.
Final EISs
EIS No. 20050208, ERP No. F–AFS–
65381–SD, Sioux Ranger District Oil
and Gas Leasing Project,
Implementation, Sioux Ranger
District, Custer National, Harding
County, SD
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20050233, ERP No. F–FHW–
F40420–MI, I–75 from M–102 to M–59
Proposed Widening and
Reconstruction, Transportation
Improvements, Funding, NPDES
Permit and U.S. Army COE Section
404 Permit, Oakland County, MI
Summary: EPA has no objections to
the preferred alternative.
EIS No. 20050252, ERP No. F–NPS–
J61105–CO, Colorado National
Monument General Management Plan,
Implementation, Mesa County, CO
Summary: EPA’s major concerns have
been addressed in the final EIS;
therefore, EPA has no objections to the
proposed action.
EIS No. 20050277, ERP No. F–FHW–
H40172–MO, U.S. Route 67 Corridor
Project, Improvements from south of
Fredericktown to south of Neelyville,
Madison, Wayne and Butler Counties,
MO
Summary: EPA has no objections to
the preferred alternative.
EIS No. 20050282, ERP No. F–FHW–
F40424–OH, U.S. 33 Nelsonville
Bypass Project, To Upgrade Existing
Four-Lane Controlled Access
Expressway between Haydenville in
Hocking County and New Floodwood
in Hocking and Athens Counties, OH
Summary: EPA has no objections to
the proposed project and preferred
alternative.
Dated: August 9, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 05–16035 Filed 8–11–05; 8:45 am]
BILLING CODE 6560–50–P
VerDate jul<14>2003
17:14 Aug 11, 2005
Jkt 205001
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6666–3]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/
Weekly receipt of Environmental Impact
Statements
Filed 8/1/2005 Through 8/5/2005
Pursuant to 40 CFR 1506.9.
EIS No. 20050325, Draft EIS, AFS, WV,
Programmatic—Monongahela
National Forest Plan Revision,
Proposes to Revise Land and Resource
Management Plan, Barbour, Grant,
Greebrier, Nicholas, Pendleton,
Pocahontab, Preston, Randolph,
Tucker, Webster Counties, WV,
Comment Period Ends: 09/26/2005,
Contact: Clyde Thompson 304–636–
1800
EIS No. 20050326, Final EIS, AFS, CA,
Burlington Ridge Trails Project, To
Eliminate, Reconstruct/or Reroute
Unsound Trail Sections, Tahoe
National Forest, Yuba River Ranger
District, Camptonville, Nevada
County, CA, Wait Period Ends: 09/26/
2005, Contact: Mary Furney 530–478–
6263
EIS No. 20050327, Final EIS, AFS, CO,
County Line Vegetation Management
Project, Salvaging Spruce Beetle
Infected Trees and Thinning SpruceFir Stand, Rio Grande National Forest,
Conejos Peak Ranger District, Conejos
County, CO, Wait Period Ends: 09/12/
2005, Contact: John Murphy 719–852–
5941
EIS No. 20050328, Draft EIS, FHW, LA,
US 90 Corridor, Proposed Interstate
Highway 49 (I49 ) South Improvement
from Raceland to the Davis Pond
Diversion Canal, Section of
Independent Utility 1 (SIU 1),
Lafourche and St. Charles Parishes,
LA, Comment Period Ends: 09/30/
2005, Contact: William C. Farr 225–
757–7615
EIS No. 20050329, Final EIS, NPS, ID,
Craters of the Moon National
Monument and Preserve, Update and
Consolidate Management Plans, into
One Comprehensive Plan, Snake
River Plain, Butte, Blaine, Lincoln,
and Minidoka Counties, ID, Wait
Period Ends: 09/12/2005, Contact:
Adrienne Anderson 303–987–6730
EIS No. 20050330, Final EIS, AFS, 00,
Black-Tailed Prairie Dog Conservation
and Management on the Nebraska
National Forest and Associated Units,
Implementation, Dawes, Sioux Blaine,
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
47199
Cherry, Thomas Counties, NE and
Custer, Fall River, Jackson,
Pennington, Jones, Lyman, Stanley
Counties, SD, Wait Period Ends:, 09/
12/2005 Contact: Jeffrey S. Abegglen
308–432–4475
EIS No. 20050331, Final EIS, COE, TX,
Programmatic—Lower Colorado River
Basin Study, Provide Flood Damage
Reduction and Ecosystem Restoration,
Colorado River, TX, Wait Period Ends:
09/12/2005, Contact: Rob Newman
817–886–1762
EIS No. 20050332, Final EIS, AFS, AK,
Couverden Timer Sales, Harvesting
Timber, NPDES, Coast Guard Bridge
Permit, U.S. Army COE Section 10
and 404 Permits, Tongass National
Forest, Juneau Ranger District, Chilkat
Peninsula, AK, Wait Period Ends: 09/
12/2005, Contact: Dave Carr 907–790–
7402
Amended Notices
EIS No. 20050209, Draft EIS, NPS, WY,
Grand Teton National Park
Transportation Plan, Implementation,
Grand Teton National park, Teton
County, WY, Comment Period Ends:
08/25/2005, Contact: Adrienne
Anderson 303–987–6730 Revision of
FR Notice Published on 06/03/2005:
Extending the Comment Period from
08/01/2005 to 08/25/2005.
Dated: August 9, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 05–16036 Filed 8–11–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–7951–7]
Notice of a Scientific Peer Review
Meeting to Review the Document: The
Inventory of Sources and
Environmental Releases of Dioxin-Like
Compounds in the U.S.: the Year 2000
Update, March, 2005 (EPA/600/P/03/
002a)
Environmental Protection
Agency.
ACTION: Notice of external peer-review
panel meeting.
AGENCY:
SUMMARY: The U.S. Environmental
Protection Agency (EPA) is announcing
that ERG, an EPA contractor for external
scientific peer review, will convene a
panel of experts and organize and
conduct an independent external peerreview workshop to review the draft
report, ‘‘The Inventory of Sources and
Environmental Releases of Dioxin-Like
E:\FR\FM\12AUN1.SGM
12AUN1
Agencies
[Federal Register Volume 70, Number 155 (Friday, August 12, 2005)]
[Notices]
[Page 47199]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-16036]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6666-3]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/
Weekly receipt of Environmental Impact Statements
Filed 8/1/2005 Through 8/5/2005
Pursuant to 40 CFR 1506.9.
EIS No. 20050325, Draft EIS, AFS, WV, Programmatic--Monongahela
National Forest Plan Revision, Proposes to Revise Land and Resource
Management Plan, Barbour, Grant, Greebrier, Nicholas, Pendleton,
Pocahontab, Preston, Randolph, Tucker, Webster Counties, WV, Comment
Period Ends: 09/26/2005, Contact: Clyde Thompson 304-636-1800
EIS No. 20050326, Final EIS, AFS, CA, Burlington Ridge Trails Project,
To Eliminate, Reconstruct/or Reroute Unsound Trail Sections, Tahoe
National Forest, Yuba River Ranger District, Camptonville, Nevada
County, CA, Wait Period Ends: 09/26/2005, Contact: Mary Furney 530-478-
6263
EIS No. 20050327, Final EIS, AFS, CO, County Line Vegetation Management
Project, Salvaging Spruce Beetle Infected Trees and Thinning Spruce-Fir
Stand, Rio Grande National Forest, Conejos Peak Ranger District,
Conejos County, CO, Wait Period Ends: 09/12/2005, Contact: John Murphy
719-852-5941
EIS No. 20050328, Draft EIS, FHW, LA, US 90 Corridor, Proposed
Interstate Highway 49 (I49 ) South Improvement from Raceland to the
Davis Pond Diversion Canal, Section of Independent Utility 1 (SIU 1),
Lafourche and St. Charles Parishes, LA, Comment Period Ends: 09/30/
2005, Contact: William C. Farr 225-757-7615
EIS No. 20050329, Final EIS, NPS, ID, Craters of the Moon National
Monument and Preserve, Update and Consolidate Management Plans, into
One Comprehensive Plan, Snake River Plain, Butte, Blaine, Lincoln, and
Minidoka Counties, ID, Wait Period Ends: 09/12/2005, Contact: Adrienne
Anderson 303-987-6730
EIS No. 20050330, Final EIS, AFS, 00, Black-Tailed Prairie Dog
Conservation and Management on the Nebraska National Forest and
Associated Units, Implementation, Dawes, Sioux Blaine, Cherry, Thomas
Counties, NE and Custer, Fall River, Jackson, Pennington, Jones, Lyman,
Stanley Counties, SD, Wait Period Ends:, 09/12/2005 Contact: Jeffrey S.
Abegglen 308-432-4475
EIS No. 20050331, Final EIS, COE, TX, Programmatic--Lower Colorado
River Basin Study, Provide Flood Damage Reduction and Ecosystem
Restoration, Colorado River, TX, Wait Period Ends: 09/12/2005, Contact:
Rob Newman 817-886-1762
EIS No. 20050332, Final EIS, AFS, AK, Couverden Timer Sales, Harvesting
Timber, NPDES, Coast Guard Bridge Permit, U.S. Army COE Section 10 and
404 Permits, Tongass National Forest, Juneau Ranger District, Chilkat
Peninsula, AK, Wait Period Ends: 09/12/2005, Contact: Dave Carr 907-
790-7402
Amended Notices
EIS No. 20050209, Draft EIS, NPS, WY, Grand Teton National Park
Transportation Plan, Implementation, Grand Teton National park, Teton
County, WY, Comment Period Ends: 08/25/2005, Contact: Adrienne Anderson
303-987-6730 Revision of FR Notice Published on 06/03/2005: Extending
the Comment Period from 08/01/2005 to 08/25/2005.
Dated: August 9, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 05-16036 Filed 8-11-05; 8:45 am]
BILLING CODE 6560-50-P