Environmental Impact Statements and Regulations; Availability of EPA Comments, 47198-47199 [05-16035]

Download as PDF 47198 Federal Register / Vol. 70, No. 155 / Friday, August 12, 2005 / Notices ROM should be formatted in Wordperfect or ASCII file, avoiding the use of special characters and any form of encryption, and may be mailed to the mailing address above. FOR FURTHER INFORMATION CONTACT: Monica Jahan Bose, Air and Radiation Law Office (2344A), Office of General Counsel, U.S. Environmental Protection Agency, 1200 Pennsylvania Ave., NW., Washington, DC 20460, telephone: (202) 564–1822. SUPPLEMENTARY INFORMATION: I. Additional Information About the Proposed Settlement This settlement would resolve a lawsuit seeking a response to an Eleventh Circuit remand with respect to a petition to object to a Title V permit issued by Georgia Environmental Protection Division for the Oglethorpe Power Corporation’s Wansley Combined Cycle Energy Facility in Heard County, Georgia. Under the proposed settlement, the parties would seek to stay the pending litigation, and Sierra Club would dismiss its lawsuit if the Administrator issues a response to the court remand by September 15, 2005. The settlement does not require the Administrator to respond to the remand or the petition to object in any particular way. If the settlement becomes final and the Administrator issues a response to the remand by September 15, 2005, then EPA will make a payment to Sierra Club in settlement of Sierra Club’s claims for attorneys’ fees. For a period of thirty (30) days following the date of publication of this notice, the Agency will receive written comments relating to the proposed settlement agreement from persons who were not named as parties or interveners to the litigation in question. EPA or the Department of Justice may withdraw or withhold consent to the proposed settlement agreement if the comments disclose facts or considerations that indicate that such consent is inappropriate, improper, inadequate, or inconsistent with the requirements of the Act. Unless EPA or the Department of Justice determine, based on any comment which may be submitted, that consent to the settlement agreement should be withdrawn, the terms of the agreement will be affirmed. II. Additional Information About Commenting on the Proposed Settlement A. How Can I Get A Copy of the Settlement? EPA has established an official public docket for this action under Docket ID No. OGC–2005–0012 which contains a VerDate jul<14>2003 17:14 Aug 11, 2005 Jkt 205001 copy of the settlement. The official public docket is available for public viewing at the Office of Environmental Information (OEI) Docket in the EPA Docket Center, EPA West, Room B102, 1301 Constitution Ave., NW., Washington, DC. The EPA Docket Center Public Reading Room is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays. The telephone number for the Public Reading Room is (202) 566–1744, and the telephone number for the OEI Docket is (202) 566–1752. An electronic version of the public docket is available through EPA’s electronic public docket and comment system, EPA Dockets. You may use EPA Dockets at https://www.epa.gov/edocket/ to submit or view public comments, access the index listing of the contents of the official public docket, and to access those documents in the public docket that are available electronically. Once in the system, select ‘‘search,’’ then key in the appropriate docket identification number. It is important to note that EPA’s policy is that public comments, whether submitted electronically or in paper, will be made available for public viewing in EPA’s electronic public docket as EPA receives them and without change, unless the comment contains copyrighted material, CBI, or other information whose disclosure is restricted by statute. Information claimed as CBI and other information whose disclosure is restricted by statute is not included in the official public docket or in EPA’s electronic public docket. EPA’s policy is that copyrighted material, including copyrighted material contained in a public comment, will not be placed in EPA’s electronic public docket but will be available only in printed, paper form in the official public docket. Although not all docket materials may be available electronically, you may still access any of the publicly available docket materials through the EPA Docket Center. B. How and To Whom Do I Submit Comments? You may submit comments as provided in the ADDRESSES section. Please ensure that your comments are submitted within the specified comment period. Comments received after the close of the comment period will be marked ‘‘late.’’ EPA is not required to consider these late comments. If you submit an electronic comment, EPA recommends that you include your name, mailing address, and an e-mail address or other contact information in the body of your comment and with any PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 disk or CD–ROM you submit. This ensures that you can be identified as the submitter of the comment and allows EPA to contact you in case EPA cannot read your comment due to technical difficulties or needs further information on the substance of your comment. Any identifying or contact information provided in the body of a comment will be included as part of the comment that is placed in the official public docket, and made available in EPA’s electronic public docket. If EPA cannot read your comment due to technical difficulties and cannot contact you for clarification, EPA may not be able to consider your comment. Your use of EPA’s electronic public docket to submit comments to EPA electronically is EPA’s preferred method for receiving comments. The electronic public docket system is an ‘‘anonymous access’’ system, which means EPA will not know your identity, e-mail address, or other contact information unless you provide it in the body of your comment. In contrast to EPA’s electronic public docket, EPA’s electronic mail (e-mail) system is not an ‘‘anonymous access’’ system. If you send an e-mail comment directly to the Docket without going through EPA’s electronic public docket, your e-mail address is automatically captured and included as part of the comment that is placed in the official public docket, and made available in EPA’s electronic public docket. Dated: August 9, 2005. Richard B. Ossias, Acting Associate General Counsel, Air and Radiation Law Office, Office of General Counsel. [FR Doc. 05–16037 Filed 8–11–05; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6666–4] Environmental Impact Statements and Regulations; Availability of EPA Comments Availability of EPA comments prepared pursuant to the Environmental Review Process (ERP), under section 309 of the Clean Air Act and Section 102(2)(c) of the National Environmental Policy Act as amended. Requests for copies of EPA comments can be directed to the Office of Federal Activities at 202–564–7167. An explanation of the ratings assigned to draft environmental impact statements (EISs) was published in FR dated April 1, 2005 (70 FR 16815). E:\FR\FM\12AUN1.SGM 12AUN1 Federal Register / Vol. 70, No. 155 / Friday, August 12, 2005 / Notices Draft EISs EIS No. 20050262, ERP No. D–FHW– D40333–DC, Klingle Road Reconstruction Project, Reconstructing for Vehicular and Recreational Uses, Between Porter Street, NW., and Cortland Place, NW., Funding, Washington, DC Summary: EPA has environmental concerns about the proposed project related to hazardous materials, specifically possible lead contamination of Klingle Creek, as well as noise impacts and the sufficient delineation of flood hazards. Rating EC2. Final EISs EIS No. 20050208, ERP No. F–AFS– 65381–SD, Sioux Ranger District Oil and Gas Leasing Project, Implementation, Sioux Ranger District, Custer National, Harding County, SD Summary: No formal comment letter was sent to the preparing agency. EIS No. 20050233, ERP No. F–FHW– F40420–MI, I–75 from M–102 to M–59 Proposed Widening and Reconstruction, Transportation Improvements, Funding, NPDES Permit and U.S. Army COE Section 404 Permit, Oakland County, MI Summary: EPA has no objections to the preferred alternative. EIS No. 20050252, ERP No. F–NPS– J61105–CO, Colorado National Monument General Management Plan, Implementation, Mesa County, CO Summary: EPA’s major concerns have been addressed in the final EIS; therefore, EPA has no objections to the proposed action. EIS No. 20050277, ERP No. F–FHW– H40172–MO, U.S. Route 67 Corridor Project, Improvements from south of Fredericktown to south of Neelyville, Madison, Wayne and Butler Counties, MO Summary: EPA has no objections to the preferred alternative. EIS No. 20050282, ERP No. F–FHW– F40424–OH, U.S. 33 Nelsonville Bypass Project, To Upgrade Existing Four-Lane Controlled Access Expressway between Haydenville in Hocking County and New Floodwood in Hocking and Athens Counties, OH Summary: EPA has no objections to the proposed project and preferred alternative. Dated: August 9, 2005. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 05–16035 Filed 8–11–05; 8:45 am] BILLING CODE 6560–50–P VerDate jul<14>2003 17:14 Aug 11, 2005 Jkt 205001 ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6666–3] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/ Weekly receipt of Environmental Impact Statements Filed 8/1/2005 Through 8/5/2005 Pursuant to 40 CFR 1506.9. EIS No. 20050325, Draft EIS, AFS, WV, Programmatic—Monongahela National Forest Plan Revision, Proposes to Revise Land and Resource Management Plan, Barbour, Grant, Greebrier, Nicholas, Pendleton, Pocahontab, Preston, Randolph, Tucker, Webster Counties, WV, Comment Period Ends: 09/26/2005, Contact: Clyde Thompson 304–636– 1800 EIS No. 20050326, Final EIS, AFS, CA, Burlington Ridge Trails Project, To Eliminate, Reconstruct/or Reroute Unsound Trail Sections, Tahoe National Forest, Yuba River Ranger District, Camptonville, Nevada County, CA, Wait Period Ends: 09/26/ 2005, Contact: Mary Furney 530–478– 6263 EIS No. 20050327, Final EIS, AFS, CO, County Line Vegetation Management Project, Salvaging Spruce Beetle Infected Trees and Thinning SpruceFir Stand, Rio Grande National Forest, Conejos Peak Ranger District, Conejos County, CO, Wait Period Ends: 09/12/ 2005, Contact: John Murphy 719–852– 5941 EIS No. 20050328, Draft EIS, FHW, LA, US 90 Corridor, Proposed Interstate Highway 49 (I49 ) South Improvement from Raceland to the Davis Pond Diversion Canal, Section of Independent Utility 1 (SIU 1), Lafourche and St. Charles Parishes, LA, Comment Period Ends: 09/30/ 2005, Contact: William C. Farr 225– 757–7615 EIS No. 20050329, Final EIS, NPS, ID, Craters of the Moon National Monument and Preserve, Update and Consolidate Management Plans, into One Comprehensive Plan, Snake River Plain, Butte, Blaine, Lincoln, and Minidoka Counties, ID, Wait Period Ends: 09/12/2005, Contact: Adrienne Anderson 303–987–6730 EIS No. 20050330, Final EIS, AFS, 00, Black-Tailed Prairie Dog Conservation and Management on the Nebraska National Forest and Associated Units, Implementation, Dawes, Sioux Blaine, PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 47199 Cherry, Thomas Counties, NE and Custer, Fall River, Jackson, Pennington, Jones, Lyman, Stanley Counties, SD, Wait Period Ends:, 09/ 12/2005 Contact: Jeffrey S. Abegglen 308–432–4475 EIS No. 20050331, Final EIS, COE, TX, Programmatic—Lower Colorado River Basin Study, Provide Flood Damage Reduction and Ecosystem Restoration, Colorado River, TX, Wait Period Ends: 09/12/2005, Contact: Rob Newman 817–886–1762 EIS No. 20050332, Final EIS, AFS, AK, Couverden Timer Sales, Harvesting Timber, NPDES, Coast Guard Bridge Permit, U.S. Army COE Section 10 and 404 Permits, Tongass National Forest, Juneau Ranger District, Chilkat Peninsula, AK, Wait Period Ends: 09/ 12/2005, Contact: Dave Carr 907–790– 7402 Amended Notices EIS No. 20050209, Draft EIS, NPS, WY, Grand Teton National Park Transportation Plan, Implementation, Grand Teton National park, Teton County, WY, Comment Period Ends: 08/25/2005, Contact: Adrienne Anderson 303–987–6730 Revision of FR Notice Published on 06/03/2005: Extending the Comment Period from 08/01/2005 to 08/25/2005. Dated: August 9, 2005. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 05–16036 Filed 8–11–05; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [FRL–7951–7] Notice of a Scientific Peer Review Meeting to Review the Document: The Inventory of Sources and Environmental Releases of Dioxin-Like Compounds in the U.S.: the Year 2000 Update, March, 2005 (EPA/600/P/03/ 002a) Environmental Protection Agency. ACTION: Notice of external peer-review panel meeting. AGENCY: SUMMARY: The U.S. Environmental Protection Agency (EPA) is announcing that ERG, an EPA contractor for external scientific peer review, will convene a panel of experts and organize and conduct an independent external peerreview workshop to review the draft report, ‘‘The Inventory of Sources and Environmental Releases of Dioxin-Like E:\FR\FM\12AUN1.SGM 12AUN1

Agencies

[Federal Register Volume 70, Number 155 (Friday, August 12, 2005)]
[Notices]
[Pages 47198-47199]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-16035]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6666-4]


Environmental Impact Statements and Regulations; Availability of 
EPA Comments

    Availability of EPA comments prepared pursuant to the Environmental 
Review Process (ERP), under section 309 of the Clean Air Act and 
Section 102(2)(c) of the National Environmental Policy Act as amended. 
Requests for copies of EPA comments can be directed to the Office of 
Federal Activities at 202-564-7167. An explanation of the ratings 
assigned to draft environmental impact statements (EISs) was published 
in FR dated April 1, 2005 (70 FR 16815).

[[Page 47199]]

Draft EISs

EIS No. 20050262, ERP No. D-FHW-D40333-DC, Klingle Road Reconstruction 
Project, Reconstructing for Vehicular and Recreational Uses, Between 
Porter Street, NW., and Cortland Place, NW., Funding, Washington, DC
    Summary: EPA has environmental concerns about the proposed project 
related to hazardous materials, specifically possible lead 
contamination of Klingle Creek, as well as noise impacts and the 
sufficient delineation of flood hazards. Rating EC2.

Final EISs

EIS No. 20050208, ERP No. F-AFS-65381-SD, Sioux Ranger District Oil and 
Gas Leasing Project, Implementation, Sioux Ranger District, Custer 
National, Harding County, SD
    Summary: No formal comment letter was sent to the preparing agency.

EIS No. 20050233, ERP No. F-FHW-F40420-MI, I-75 from M-102 to M-59 
Proposed Widening and Reconstruction, Transportation Improvements, 
Funding, NPDES Permit and U.S. Army COE Section 404 Permit, Oakland 
County, MI
    Summary: EPA has no objections to the preferred alternative.

EIS No. 20050252, ERP No. F-NPS-J61105-CO, Colorado National Monument 
General Management Plan, Implementation, Mesa County, CO
    Summary: EPA's major concerns have been addressed in the final EIS; 
therefore, EPA has no objections to the proposed action.

EIS No. 20050277, ERP No. F-FHW-H40172-MO, U.S. Route 67 Corridor 
Project, Improvements from south of Fredericktown to south of 
Neelyville, Madison, Wayne and Butler Counties, MO
    Summary: EPA has no objections to the preferred alternative.

EIS No. 20050282, ERP No. F-FHW-F40424-OH, U.S. 33 Nelsonville Bypass 
Project, To Upgrade Existing Four-Lane Controlled Access Expressway 
between Haydenville in Hocking County and New Floodwood in Hocking and 
Athens Counties, OH
    Summary: EPA has no objections to the proposed project and 
preferred alternative.

    Dated: August 9, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 05-16035 Filed 8-11-05; 8:45 am]