S.D. Warren Company; Notice of Public Meeting on Draft Environmental Assessment, 46835 [E5-4334]
Download as PDF
Federal Register / Vol. 70, No. 154 / Thursday, August 11, 2005 / Notices
Description: California Independent
System Operator Corporation’s
amendment to filing and response to
FERC’s 7/13/05 deficiency letter in
Docket No. ER05–1013–000.
Filed Date: 08/02/2005.
Accession Number: 20050804–0094.
Comment Date: 5 p.m. eastern time on
Friday, August 12, 2005.
Docket Numbers: ER95–1374–018;
ER96–1122–015.
Applicants: National Fuel Gas
Resources, Inc.; NFR Power Inc.
Description: National Fuel Resources
Inc. and NFR Power Inc. submit their
Triennial Market Power Reviews and
Revisions to their Market-Based Rate
Tariffs.
Filed Date: 07/27/2005.
Accession Number: 20050729–0047.
Comment Date: 5 p.m. eastern time on
Wednesday, August 17, 2005.
Docket Numbers: ER97–3428–008.
Applicants: Tri Valley Corporation.
Description: Tri-Valley Corporation
submits its Triennial Updated Market
Power Analysis.
Filed Date: 07/29/2005.
Accession Number: 20050729–5052.
Comment Date: 5 p.m. eastern time on
Friday, August 19, 2005.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
VerDate jul<14>2003
16:14 Aug 10, 2005
Jkt 205001
46835
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
allan.creamer@ferc.gov, with questions
or for additional information.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–4346 Filed 8–10–05; 8:45 am]
In accordance with the National
Environmental Policy Act of 1969, as
amended, and the Federal Energy
Regulatory Commission’s (Commission
or FERC) regulations (18 CFR part 380),
Commission staff has reviewed the
application for license for the Portal
Hydroelectric Project (FERC No. 2174–
012) and has prepared a draft
environmental assessment (DEA). The
project is located on Camp 61 Creek and
Rancheria Creek in Fresno County,
California.
The DEA contains the staff’s analysis
of the potential environmental effects of
the project and concludes that licensing
the project, with appropriate
environmental protective measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
Copies of the DEA are available for
review in Public Reference Room 2–A of
the Commission’s offices at 888 First
Street, NE., Washington, DC. The DEA
also may be viewed on the
Commission’s Internet Web site (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (202) 502–6088, or on the
Commission’s Web site using the
eLibrary link.
Any comments on the DEA should be
filed within 30 days of the date of this
notice and should be addressed to
Magalie R. Salas, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
Please reference ‘‘Portal Hydroelectric
Project, FERC Project No. 2174–012’’ on
all comments. Comments may be filed
electronically via the Internet in lieu of
paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2984–042]
S.D. Warren Company; Notice of Public
Meeting on Draft Environmental
Assessment
August 4, 2005.
The Commission hereby gives notice
that members of its staff will conduct a
public meeting on August 18, 2005,
from 7 to 10 p.m. (EST) at the Windham
High School Auditorium, located at 406
Gray Road, Windham, Maine.
The purpose of the meeting is to
request additional comments on the
draft environmental assessment (EA)
prepared for the relicensing of the Eel
Weir Project, FERC No. 2984. The draft
EA was issued and publicly noticed on
July 11, 2005, and is available for review
on the Commission’s Web site at
https://www.ferc.gov, using the
‘‘eLibrary’’ link. The project is located
on the Presumpscot River at the outlet
of Sebago Lake, in Cumberland County,
Maine.
This meeting is open to the public.
All local, state, and Federal agencies,
Indian tribes, and other interested
parties are invited to participate. A
transcript of the meeting will be
prepared.
Please contact Allan Creamer at (202)
502–8365, or via e-mail at
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–4334 Filed 8–10–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2174–012–California]
Southern California Edison; Notice of
Availability of Draft Environmental
Assessment
August 4, 2005.
E:\FR\FM\11AUN1.SGM
11AUN1
Agencies
[Federal Register Volume 70, Number 154 (Thursday, August 11, 2005)]
[Notices]
[Page 46835]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-4334]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2984-042]
S.D. Warren Company; Notice of Public Meeting on Draft
Environmental Assessment
August 4, 2005.
The Commission hereby gives notice that members of its staff will
conduct a public meeting on August 18, 2005, from 7 to 10 p.m. (EST) at
the Windham High School Auditorium, located at 406 Gray Road, Windham,
Maine.
The purpose of the meeting is to request additional comments on the
draft environmental assessment (EA) prepared for the relicensing of the
Eel Weir Project, FERC No. 2984. The draft EA was issued and publicly
noticed on July 11, 2005, and is available for review on the
Commission's Web site at https://www.ferc.gov, using the ``eLibrary''
link. The project is located on the Presumpscot River at the outlet of
Sebago Lake, in Cumberland County, Maine.
This meeting is open to the public. All local, state, and Federal
agencies, Indian tribes, and other interested parties are invited to
participate. A transcript of the meeting will be prepared.
Please contact Allan Creamer at (202) 502-8365, or via e-mail at
allan.creamer@ferc.gov, with questions or for additional information.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-4334 Filed 8-10-05; 8:45 am]
BILLING CODE 6717-01-P