Combined Notice of Filings #1, 46502-46503 [E5-4315]

Download as PDF 46502 Federal Register / Vol. 70, No. 153 / Wednesday, August 10, 2005 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 August 04, 2005. Take notice that the Commission received the following electric rate filings Docket Numbers: ER01–2214–005. Applicants: Entergy Services, Inc. Description: Entergy Services, Inc. (Entergy) submits its response to the Commission’s 7/19/05 letter requesting additional information regarding Entergy’s January 24, 2005 filing of a refund report, in particular information relating to the calculation of refunds Entergy’s Schedule (Energy Imbalances Service). Filed Date: 07/29/2005. Accession Number: 20050802–0001. Comment Date: 5 p.m. eastern time on Friday, August 19, 2005. Docket Numbers: ER05–1262–000. Applicants: Flat Rock Windpower LLC. Description: Application of Flat Rock Windpower, LLC requesting blanket approval of market-based rates for the wholesale sale of electric energy, capacity and ancillary services from its new wind farm located in Lewis County, New York. Filed Date: 07/29/2005. Accession Number: 20050803–0070. Comment Date: 5 p.m. eastern time on Friday, August 19, 2005. Docket Numbers: ER05–1263–000. Applicants: PJM Interconnection L.L.C. Description: PJM Interconnection, L.L.C. submits amended network integration transmission service agreements with Southeastern Power Administration & Virginia Electric & Power Company d/b/a Dominion Virginia Power to become effective July 1, 2005. Filed Date: 07/29/2005. Accession Number: 20050803–0071. Comment Date: 5 p.m. eastern time on Friday, August 19, 2005. Docket Numbers: ER05–1265–000. Applicants: Mid American Energy Company. Description: MidAmerican Energy Company submits a revised Interconnection Agreement with Central Iowa Power Cooperative. Filed Date: 07/29/2005. Accession Number: 20050803–0074. Comment Date: 5 p.m. eastern time on Friday, August 19, 2005. Docket Numbers: ER05–1266–000. Applicants: Ontelaunee Power Operating, Company, LLC. VerDate jul<14>2003 15:02 Aug 09, 2005 Jkt 205001 Description: Ontelaunee Power Operating Company, LLC submits a Notice of Succession to notify the Commission that, as a result of a name change, it adopts the CES Marketing VI, LLC FERC Rate Schedule 1 as its own; and an amendment to the Rate Schedule to include changes to reflect the name change and corrections in the reporting requirement for changes in status and in Market Behavior Rule 2(b). Filed Date: 07/29/2005. Accession Number: 20050803–0064. Comment Date: 5 p.m. eastern time on Friday, August 19, 2005. Docket Numbers: ER05–1270–000. Applicants: Allegheny Energy Supply Company, LLC; Monongahela Power Company. Description: Allegheny Energy Supply Company, LLC and Monongahela Power Company submit rate schedules which specify their revenue requirement for providing cost-based Reactive Support and Voltage Control from Generation Sources Service from Bath County Generating plant located in the Dominion Virginia Power Zone within the PJM control area administered by the PJM Interconnection, L.L.C. Filed Date: 07/29/2005. Accession Number: 20050803–0057. Comment Date: 5 p.m. eastern time on Friday, August 19, 2005. Docket Numbers: ER05–1271–000. Applicants: Lake Benton Power Partners II, LLC. Description: Lake Benton Power Partners II, LLC submits revised Code of Conduct tariff sheets. Filed Date: 07/29/2005. Accession Number: 20050803–0056. Comment Date: 5 p.m. eastern time on Friday, August 19, 2005. Docket Numbers: ER05–1272–000. Applicants: Duke Power, a division of Duke Energy Corporation. Description: Duke Power, a Division of Duke Energy Corporation, submits First Revised Sheet 2 and 3 to Duke Power’s Wholesale Cost-Based Rate Tariff providing for the sales of capacity and energy within the Duke Power control area, to become effective 7/30/05. Filed Date: 07/29/2005. Accession Number: 20050803–0055. Comment Date: 5 p.m. eastern time on Friday, August 19, 2005. Docket Numbers: ER05–1273–000. Applicants: Mid-Continent Area Power Pool. Description: Mid-Continent Area Power Pool on behalf of its public utility members submits revisions to a component of charges for scheduling and tariff administration service under MAPP Schedule F. PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 Filed Date: 07/29/2005. Accession Number: 20050803–0075. Comment Date: 5 p.m. eastern time on Friday, August 19, 2005. Docket Numbers: ER05–1279–000. Applicants: PJM Interconnection, L.L.C.; Progress Energy Carolinas, Inc. Description: PJM Interconnection L.L.C. and Carolina Power & Light Company d/b/a Progress Energy Carolinas, Inc. submit their Joint Operating Agreement executed on 7/27/05. Filed Date: 07/29/2005. Accession Number: 20050803–0063. Comment Date: 5 p.m. eastern time on Friday, August 19, 2005. Docket Numbers: ER05–534–002; ER05–365–004; ER03–296–004; ER01– 3121–003; ER02–418–002; ER03–416– 005; ER05–332–002; ER03–951–004; ER04–94–002; ER02–417–002; ER05– 481–002. Applicants: Eastern Desert Power LLC; Elk River Windfarm, LLC; Flying Cloud Power Partners, LLC; Klamath Energy LLC; Klamath Generation LLC; Klondike Wind Power LLC; Klondike Wind Power II LLC; Moraine Wind LLC; Mountain View Power Partners III, LLC; Phoenix Wind Power LLC; Trimont Wind I LLC. Description: The above-listed subsidiaries of PPM Energy, Inc. submit a joint triennial market power update in compliance with the Commission’s Order issued 5/31/05, 111 FERC ¶ 61,295 (2005). Filed Date: 07/29/2005. Accession Number: 20050803–0051. Comment Date: 5 p.m. eastern time on Friday, August 19, 2005. Docket Numbers: ER05–718–003. Applicants: California Independent System Operator Corporation. Description: California Independent System Operator Corporation, in compliance with the Commission’s 4/7/ 05 order (111 FERC ¶ 61,008 (2005)), submits its proposal to maintain the ‘‘asbid’’ settlement rules for setting intertie transactions (import/export bids) as the longer-term solution to remain in effect beyond the 9/30/05 sunset date specified in the 4/7/05 order. Filed Date: 07/26/2005. Accession Number: 20050728–0050. Comment Date: 5 p.m. eastern time on Tuesday, August 16, 2005. Docket Numbers: ER96–795–012. Applicants: Gateway Energy Marketing. Description: Gateway Energy Marketing submits its Triennial Updated Market Power Analysis in compliance with the Commission’s order issued 5/31/05, 111 FERC ¶ 61,295. E:\FR\FM\10AUN1.SGM 10AUN1 Federal Register / Vol. 70, No. 153 / Wednesday, August 10, 2005 / Notices Filed Date: 07/29/2005. Accession Number: 20050729–5051. Comment Date: 5 p.m. eastern time on Friday, August 19, 2005. Docket Numbers: ER97–3428–008. Applicants: Tri-Valley Corporation. Description: Tri-Valley Corporation submits its Triennial Updated Market Power Analysis in compliance with the Commission’s order issued 5/13/05, 111 FERC ¶ 61,295. Filed Date: 07/29/2005. Accession Number: 20050729–5052. Comment Date: 5 p.m. eastern time on Friday, August 19, 2005. Docket Numbers: ER99–1773–005; ER99–2284–005. Applicants: AES Eastern Energy, L.P.; AES Creative Resources, L.P., AEE 2, L.L.C. Description: AES Eastern Energy LP and AES Creative Resources, L.P. and AEE 2, L.L.C. submit proposed revisions to their market-based rate tariffs to incorporate the new change in status reporting requirements and conform to language ordered by the Commission for other affiliates of the AES Parties. Filed Date: 07/29/2005. Accession Number: 20050803–0061. Comment Date: 5 p.m. eastern time on Friday, August 19, 2005. Docket Numbers: ER99–1773–006; ER99–2284–006. Applicants: AES Eastern Energy, L.P.; AES Creative Resources, L.P.; AEE2, L.L.C. Description: AES Eastern Energy LP; AES Creative Resources, L.P.; and AEE2, L.L.C. submits their joint triennial market power update. Filed Date: 07/29/2005. Accession Number: 20050803–0062. Comment Date: 5 p.m. eastern time on Friday, August 19, 2005. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other and the Applicant. VerDate jul<14>2003 15:02 Aug 09, 2005 Jkt 205001 The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed dockets(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Linda Mitry, Deputy Secretary. [FR Doc. E5–4315 Filed 8–9–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2696–000] Town of Stuyvesant and Stuyvesant Falls Hydro Corporation; Notice of Intent To File an Application for a New License August 2, 2005. a. Type of Filing: Notice of intent to file an application for a new license. b. Project No.: P–2696–000. c. Date Filed: July 22, 2005. d. Submitted by: Town of Stuyvesant and Stuyvesant Falls Hydro Corporation—current licensees. e. Name of Project: Stuyvesant Falls Hydroelectric Project. f. Location: On Kinderhook Creek, partly within the Town of Stuyvesant, in Columbia County, New York. The project does not utilize Federal lands. g. Filed Pursuant to: Section 15 of the Federal Power Act PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 46503 h. Licensee Contact: James A. Besha, P.E., Albany Engineering Corporation, 447 New Karner Road, Albany, NY 12205, (518) 456–7712. i. FERC Contact: Stefanie Harris, stefanie.harris@ferc.gov, (202) 502– 6653. j. Effective date of current license: May 1, 1965. k. Expiration date of current license: July 31, 2005. l. Description of the Project: The project consists of the following existing facilities: (1) A 13-foot-high, 240-footlong masonry gravity dam with a Taintor gate and trash sluice near the south abutment; (2) a 46-acre reservoir with a normal pool elevation of 174.3 feet USGS; (3) two 7.5-foot-diameter, 2,860-foot-long, riveted-steel pipelines; (4) a 25-foot-diameter surge tank; (5) two 200-foot-long steel penstocks; (6) a powerhouse containing a single 2.8megawatt generating unit; and (7) other appurtenances. m. Pursuant to 18 CFR 16.8, 16.9, and 16.10 each application for a new license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. However, as a result of Public Law No. 108–137, which was signed by President Bush on December 1, 2003, the Commission issued an order on December 30, 2003 (105 FERC ¶ 62,231) that reinstated the previously-surrendered project license, with its original expiration date of July 31, 2005, and transferred the license to the current co-licensees, Town of Stuyvesant and Stuyvesant Falls Hydro Corporation. Under normal circumstances, the relicensing process would have commenced with the licensee filing, by at least five years prior to the end of the license term (July 2000), a notice of intent to seek or not to seek a new license. However, the surrender of the original license for the project became effective on February 17, 1999, prior to the notice of intent deadline. The colicensees filed the notice of intent on July 22, 2005, stating their intent to seek relicensing of the project and their intent to use the Traditional Licensing Process in preparing their relicense application. The December 30, 2003 Commission Order stated that the Commission would issue a notice establishing a relicensing schedule for the project, and given these unusual circumstances, the Commission will proceed in accordance with the following schedule. n. The relicensing process will proceed according to the following schedule. Revisions to the schedule will be made as appropriate. E:\FR\FM\10AUN1.SGM 10AUN1

Agencies

[Federal Register Volume 70, Number 153 (Wednesday, August 10, 2005)]
[Notices]
[Pages 46502-46503]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-]



[[Page 46502]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings 1

August 04, 2005.
    Take notice that the Commission received the following electric 
rate filings
    Docket Numbers: ER01-2214-005.
    Applicants: Entergy Services, Inc.
    Description: Entergy Services, Inc. (Entergy) submits its response 
to the Commission's 7/19/05 letter requesting additional information 
regarding Entergy's January 24, 2005 filing of a refund report, in 
particular information relating to the calculation of refunds Entergy's 
Schedule (Energy Imbalances Service).
    Filed Date: 07/29/2005.
    Accession Number: 20050802-0001.
    Comment Date: 5 p.m. eastern time on Friday, August 19, 2005.

    Docket Numbers: ER05-1262-000.
    Applicants: Flat Rock Windpower LLC.
    Description: Application of Flat Rock Windpower, LLC requesting 
blanket approval of market-based rates for the wholesale sale of 
electric energy, capacity and ancillary services from its new wind farm 
located in Lewis County, New York.
    Filed Date: 07/29/2005.
    Accession Number: 20050803-0070.
    Comment Date: 5 p.m. eastern time on Friday, August 19, 2005.

    Docket Numbers: ER05-1263-000.
    Applicants: PJM Interconnection L.L.C.
    Description: PJM Interconnection, L.L.C. submits amended network 
integration transmission service agreements with Southeastern Power 
Administration & Virginia Electric & Power Company d/b/a Dominion 
Virginia Power to become effective July 1, 2005.
    Filed Date: 07/29/2005.
    Accession Number: 20050803-0071.
    Comment Date: 5 p.m. eastern time on Friday, August 19, 2005.

    Docket Numbers: ER05-1265-000.
    Applicants: Mid American Energy Company.
    Description: MidAmerican Energy Company submits a revised 
Interconnection Agreement with Central Iowa Power Cooperative.
    Filed Date: 07/29/2005.
    Accession Number: 20050803-0074.
    Comment Date: 5 p.m. eastern time on Friday, August 19, 2005.

    Docket Numbers: ER05-1266-000.
    Applicants: Ontelaunee Power Operating, Company, LLC.
    Description: Ontelaunee Power Operating Company, LLC submits a 
Notice of Succession to notify the Commission that, as a result of a 
name change, it adopts the CES Marketing VI, LLC FERC Rate Schedule 1 
as its own; and an amendment to the Rate Schedule to include changes to 
reflect the name change and corrections in the reporting requirement 
for changes in status and in Market Behavior Rule 2(b).
    Filed Date: 07/29/2005.
    Accession Number: 20050803-0064.
    Comment Date: 5 p.m. eastern time on Friday, August 19, 2005.

    Docket Numbers: ER05-1270-000.
    Applicants: Allegheny Energy Supply Company, LLC; Monongahela Power 
Company.
    Description: Allegheny Energy Supply Company, LLC and Monongahela 
Power Company submit rate schedules which specify their revenue 
requirement for providing cost-based Reactive Support and Voltage 
Control from Generation Sources Service from Bath County Generating 
plant located in the Dominion Virginia Power Zone within the PJM 
control area administered by the PJM Interconnection, L.L.C.
    Filed Date: 07/29/2005.
    Accession Number: 20050803-0057.
    Comment Date: 5 p.m. eastern time on Friday, August 19, 2005.

    Docket Numbers: ER05-1271-000.
    Applicants: Lake Benton Power Partners II, LLC.
    Description: Lake Benton Power Partners II, LLC submits revised 
Code of Conduct tariff sheets.
    Filed Date: 07/29/2005.
    Accession Number: 20050803-0056.
    Comment Date: 5 p.m. eastern time on Friday, August 19, 2005.

    Docket Numbers: ER05-1272-000.
    Applicants: Duke Power, a division of Duke Energy Corporation.
    Description: Duke Power, a Division of Duke Energy Corporation, 
submits First Revised Sheet 2 and 3 to Duke Power's Wholesale Cost-
Based Rate Tariff providing for the sales of capacity and energy within 
the Duke Power control area, to become effective 7/30/05.
    Filed Date: 07/29/2005.
    Accession Number: 20050803-0055.
    Comment Date: 5 p.m. eastern time on Friday, August 19, 2005.

    Docket Numbers: ER05-1273-000.
    Applicants: Mid-Continent Area Power Pool.
    Description: Mid-Continent Area Power Pool on behalf of its public 
utility members submits revisions to a component of charges for 
scheduling and tariff administration service under MAPP Schedule F.
    Filed Date: 07/29/2005.
    Accession Number: 20050803-0075.
    Comment Date: 5 p.m. eastern time on Friday, August 19, 2005.

    Docket Numbers: ER05-1279-000.
    Applicants: PJM Interconnection, L.L.C.; Progress Energy Carolinas, 
Inc.
    Description: PJM Interconnection L.L.C. and Carolina Power & Light 
Company d/b/a Progress Energy Carolinas, Inc. submit their Joint 
Operating Agreement executed on 7/27/05.
    Filed Date: 07/29/2005.
    Accession Number: 20050803-0063.
    Comment Date: 5 p.m. eastern time on Friday, August 19, 2005.

    Docket Numbers: ER05-534-002; ER05-365-004; ER03-296-004; ER01-
3121-003; ER02-418-002; ER03-416-005; ER05-332-002; ER03-951-004; ER04-
94-002; ER02-417-002; ER05-481-002.
    Applicants: Eastern Desert Power LLC; Elk River Windfarm, LLC; 
Flying Cloud Power Partners, LLC; Klamath Energy LLC; Klamath 
Generation LLC; Klondike Wind Power LLC; Klondike Wind Power II LLC; 
Moraine Wind LLC; Mountain View Power Partners III, LLC; Phoenix Wind 
Power LLC; Trimont Wind I LLC.
    Description: The above-listed subsidiaries of PPM Energy, Inc. 
submit a joint triennial market power update in compliance with the 
Commission's Order issued 5/31/05, 111 FERC ] 61,295 (2005).
    Filed Date: 07/29/2005.
    Accession Number: 20050803-0051.
    Comment Date: 5 p.m. eastern time on Friday, August 19, 2005.

    Docket Numbers: ER05-718-003.
    Applicants: California Independent System Operator Corporation.
    Description: California Independent System Operator Corporation, in 
compliance with the Commission's 4/7/05 order (111 FERC ] 61,008 
(2005)), submits its proposal to maintain the ``as-bid'' settlement 
rules for setting intertie transactions (import/export bids) as the 
longer-term solution to remain in effect beyond the 9/30/05 sunset date 
specified in the 4/7/05 order.
    Filed Date: 07/26/2005.
    Accession Number: 20050728-0050.
    Comment Date: 5 p.m. eastern time on Tuesday, August 16, 2005.

    Docket Numbers: ER96-795-012.
    Applicants: Gateway Energy Marketing.
    Description: Gateway Energy Marketing submits its Triennial Updated 
Market Power Analysis in compliance with the Commission's order issued 
5/31/05, 111 FERC ] 61,295.

[[Page 46503]]

    Filed Date: 07/29/2005.
    Accession Number: 20050729-5051.
    Comment Date: 5 p.m. eastern time on Friday, August 19, 2005.

    Docket Numbers: ER97-3428-008.
    Applicants: Tri-Valley Corporation.
    Description: Tri-Valley Corporation submits its Triennial Updated 
Market Power Analysis in compliance with the Commission's order issued 
5/13/05, 111 FERC ] 61,295.
    Filed Date: 07/29/2005.
    Accession Number: 20050729-5052.
    Comment Date: 5 p.m. eastern time on Friday, August 19, 2005.

    Docket Numbers: ER99-1773-005; ER99-2284-005.
    Applicants: AES Eastern Energy, L.P.; AES Creative Resources, L.P., 
AEE 2, L.L.C.
    Description: AES Eastern Energy LP and AES Creative Resources, L.P. 
and AEE 2, L.L.C. submit proposed revisions to their market-based rate 
tariffs to incorporate the new change in status reporting requirements 
and conform to language ordered by the Commission for other affiliates 
of the AES Parties.
    Filed Date: 07/29/2005.
    Accession Number: 20050803-0061.
    Comment Date: 5 p.m. eastern time on Friday, August 19, 2005.

    Docket Numbers: ER99-1773-006; ER99-2284-006.
    Applicants: AES Eastern Energy, L.P.; AES Creative Resources, L.P.; 
AEE2, L.L.C.
    Description: AES Eastern Energy LP; AES Creative Resources, L.P.; 
and AEE2, L.L.C. submits their joint triennial market power update.
    Filed Date: 07/29/2005.
    Accession Number: 20050803-0062.
    Comment Date: 5 p.m. eastern time on Friday, August 19, 2005.
    Any person desiring to intervene or to protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Rules of Practice and Procedure (18 CFR 385.211 and 
385.214) on or before 5 p.m. eastern time on the specified comment 
date. It is not necessary to separately intervene again in a subdocket 
related to a compliance filing if you have previously intervened in the 
same docket. Protests will be considered by the Commission in 
determining the appropriate action to be taken, but will not serve to 
make protestants parties to the proceeding. Anyone filing a motion to 
intervene or protest must serve a copy of that document on the 
Applicant. In reference to filings initiating a new proceeding, 
interventions or protests submitted on or before the comment deadline 
need not be served on persons other and the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://
www.ferc.gov. To facilitate electronic service, persons with Internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
14 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First St., NE., Washington, DC 20426.
    The filings in the above proceedings are accessible in the 
Commission's eLibrary system by clicking on the appropriate link in the 
above list. They are also available for review in the Commission's 
Public Reference Room in Washington, DC. There is an eSubscription link 
on the Web site that enables subscribers to receive e-mail notification 
when a document is added to a subscribed dockets(s). For assistance 
with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. 
or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.

Linda Mitry,
Deputy Secretary.
[FR Doc. E5-4315 Filed 8-9-05; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.