Berkshire Hathaway Inc., MidAmerican Energy Company, MidAmerican Energy Holdings Company; Notice of Filing, 46158-46159 [E5-4287]
Download as PDF
46158
Federal Register / Vol. 70, No. 152 / Tuesday, August 9, 2005 / Notices
Dated: August 3, 2005.
Angela C. Arrington,
Leader, Information Management Case
Services Team, Regulatory Information
Management Group, Office of the Chief
Information Officer.
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket Nos. EC05–113–000]
[Docket No. EC05–115–000]
Office of Special Education and
Rehabilitative Services
AIG Energy Inc.; Notice of Filing
Berkshire Hathaway Inc., MidAmerican
Energy Company, MidAmerican
Energy Holdings Company; Notice of
Filing
August 2, 2005.
Type of Review: Revision.
Title: National Longitudinal
Transition Study—2 (NLTS2).
Frequency: One time.
Affected Public:
Individuals or household; not-forprofit institutions.
Reporting and Recordkeeping Hour
Burden:
Responses: 4,432.
Burden Hours: 2,085.
Abstract: NLTS2 will provide
nationally representative information
about youth with disabilities in
secondary school and in transition to
adult life, including their
characteristics, programs and services
and achievements in multiple domains
(e.g., employment, postsecondary
education). The study will inform
special education policy development
and support Individuals with
Disabilities Education Act (IDEA)
reauthorization.
Requests for copies of the information
collection submission for OMB review
may be accessed from https://
edicsweb.ed.gov, by selecting the
‘‘Browse Pending Collections’’ link and
by clicking on link number 2778. When
you access the information collection,
click on ‘‘Download Attachments’’ to
view. Written requests for information
should be addressed to U.S. Department
of Education, 400 Maryland Avenue,
SW., Potomac Center, 9th Floor,
Washington, DC 20202–4700. Requests
may also be electronically mailed to the
Internet address OCIO_RIMG@ed.gov or
faxed to 202–245–6623. Please specify
the complete title of the information
collection when making your request.
Comments regarding burden and/or
the collection activity requirements
should be directed to Sheila Carey at her
e-mail address Sheila.Carey@ed.gov.
Individuals who use a
telecommunications device for the deaf
(TDD) may call the Federal Information
Relay Service (FIRS) at 1–800–877–
8339.
[FR Doc. 05–15716 Filed 8–8–05; 8:45 am]
BILLING CODE 4000–01–P
VerDate jul<14>2003
15:52 Aug 08, 2005
Take notice that on July 27, 2005, AIG
Energy Inc. (Applicant) submitted an
Application pursuant to section 203 of
the Federal Power Act for authorization
of the indirect disposition of
jurisdictional facilities that may have
resulted from an internal transfer of
intermediate upstream ownership
interests.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on August 17, 2005.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–4285 Filed 8–8–05; 8:45 am]
BILLING CODE 6717–01–P
Jkt 205001
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
August 3, 2005.
Take notice that on July 29, 2005,
Berkshire Hathaway Inc. (Berkshire
Hathaway), MidAmerican Energy
Company (MidAmerican), and
MidAmerican Energy Holdings
Company filed with the Federal Energy
Regulatory Commission an application
pursuant to section 203 of the Federal
Power Act for approval of an indirect
transfer of control of MidAmerican, and
possibly PacifiCorp, to Berkshire
Hathaway.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
E:\FR\FM\09AUN1.SGM
09AUN1
Federal Register / Vol. 70, No. 152 / Tuesday, August 9, 2005 / Notices
Comment Date: 5 p.m. Eastern Time
on August 29, 2005.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–4287 Filed 8–8–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP05–395–000]
Dominion Cove Point LNG, LP; Notice
of Application
August 3, 2005.
Take notice that on July 26, 2005,
Dominion Cove Point LNG, LP (Cove
Point LNG) filed an application in
Docket No. CP05–395–000, pursuant to
section 3 of the Natural Gas Act (NGA),
for authority to construct, install, own,
operate and maintain certain facilities at
the Cove Point LNG import terminal at
Cove Point, Maryland (Vaporizer
Reactivation Project). The details of this
proposal are more fully set forth in the
application that is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or TTY(202)
502–8659.
Any questions regarding this
application should be directed to Anne
E. Bomar, Managing Director,
Transmission, Rates and Regulation,
Dominion Resources, Inc., 120 Tredegar
Street, Richmond, Virginia 23219, or by
phone at (804) 819–2134.
The Vaporizer Reactivation Project is
designed to refurbish and reactivate two
unused waste heat vaporizers that were
originally installed at the Cove Point
LNG Terminal in the 1970s. These
vaporizers will use combustion exhaust
heat from the gas turbine generators to
indirectly vaporize LNG. The proposed
project will provide spare vaporization
capability that will create an
opportunity to firm up sendout from the
facility, during times when the
vaporization facilities would otherwise
be limited by normal maintenance
requirements. Cove Point LNG says that
reactivating these waste heat vaporizers
will enable Cove Point LNG to provide
up to its current peak-day capability of
1.0 MMDth/day of sendout for which it
VerDate jul<14>2003
15:52 Aug 08, 2005
Jkt 205001
is currently authorized on a year-round
basis, subject only to certain excused
interruptions. Cove Point LNG says that
the Vaporizer Reactivation Project will
not impair the ability of Cove Point LNG
to render service at reasonable rates to
its existing customers.
Cove Point LNG requests that the
Commission approve the use of the
facilities associated with the Vapor
Reactivation Project to support an
incremental send-out service (ISQ) for
LTD–1 customers under Section 4 of the
NGA. The terms and conditions of the
proposed ISQ service are set forth in pro
forma tariff sheets modifying Rate
Schedule LTD–1 in Exhibit P to the
application. Cove Point LNG is also
proposing that an off-peak firm
transportation service (OTS) on the
Cove Point LNG natural gas pipeline be
approved by the Commission under
Section 4 of the NGA. The terms and
conditions of the proposed OTS service
are also set forth in pro forma tariff
sheets in Exhibit P to the application.
Cove Point LNG requests that the
Commission grant the requested
authorization at the earliest practicable
date, in order to ensure an in-service
date on the earlier of: (i) The earliest
practicable date, or (ii) the later of (a)
May 24, 2006, or (b) six months
following issuance of the requested
authorizations.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date,
file with the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426, a motion to
intervene in accordance with the
requirements of the Commission’s Rules
of Practice and Procedure (18 CFR
385.214 or 385.211) and the Regulations
under the NGA(18 CFR 157.10). A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies of all documents
filed by the applicant and by all other
parties. A party must submit 14 copies
of filings made with the Commission
and must mail a copy to the applicant
and to every other party in the
proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
Persons who wish to comment only
on the environmental review of this
project, or in support of or in opposition
to this project, should submit an
original and two copies of their
comments to the Secretary of the
Commission. Environmental
commentors will be placed on the
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
46159
Commission’s environmental mailing
list, will receive copies of the
environmental documents, and will be
notified of meetings associated with the
Commission’s environmental review
process. Environmental commentors
will not be required to serve copies of
filed documents on all other parties.
The Commission’s rules require that
persons filing comments in opposition
to the project provide copies of their
protests only to the applicant. However,
the non-party commentors will not
receive copies of all documents filed by
other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the Internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Comment Date: 5 p.m. Eastern Time
on August 26, 2005.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–4283 Filed 8–8–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. EC05–114–000, ER05–1258–
000]
FPL Energy Duane Arnold, LLC;
Interstate Power and Light Company;
Notice of Filing
August 3, 2005.
Take notice that on July 29, 2005, FPL
Energy Duane Arnold, LLC (FPLE Duane
Arnold) and Interstate Power and Light
Company (IPL) filed with the Federal
Energy Regulatory Commission an
application pursuant to section 203 of
the Federal Power Act for authorization
of the sale of the majority ownership
interests in Duane Arnold Energy Center
(DAEC) from IPL to FPLE Duane Arnold,
a wholly-owned, direct subsidiary of
FPL Group, Inc. In addition, IPL is
submitting for filing a Large Generator
Interconnection Agreement.
The applicants also are requesting
confidential treatment pursuant to 18
CFR 388.112 for certain data submitted
in support of the application.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
E:\FR\FM\09AUN1.SGM
09AUN1
Agencies
[Federal Register Volume 70, Number 152 (Tuesday, August 9, 2005)]
[Notices]
[Pages 46158-46159]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-4287]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EC05-115-000]
Berkshire Hathaway Inc., MidAmerican Energy Company, MidAmerican
Energy Holdings Company; Notice of Filing
August 3, 2005.
Take notice that on July 29, 2005, Berkshire Hathaway Inc.
(Berkshire Hathaway), MidAmerican Energy Company (MidAmerican), and
MidAmerican Energy Holdings Company filed with the Federal Energy
Regulatory Commission an application pursuant to section 203 of the
Federal Power Act for approval of an indirect transfer of control of
MidAmerican, and possibly PacifiCorp, to Berkshire Hathaway.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant and all the parties in this proceeding.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
[[Page 46159]]
Comment Date: 5 p.m. Eastern Time on August 29, 2005.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-4287 Filed 8-8-05; 8:45 am]