Notice of Application for Transfer of License, and Soliciting Comments, Motions To Intervene, and Protests, 45388-45389 [E5-4201]
Download as PDF
45388
Federal Register / Vol. 70, No. 150 / Friday, August 5, 2005 / Notices
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number P–2170, excluding the last three
digits in the docket number field to
access the document. For assistance,
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at http:
//www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Scoping Process: The Commission
intends to prepare an Environmental
assessment (EA) on the project in
accordance with the National
Environmental Policy Act. The EA will
consider both site-specific and
cumulative environmental impacts and
reasonable alternatives to the proposed
action.
Scoping Meetings
FERC staff will conduct two scoping
meetings and one site visit. All
Interested agencies, Indian tribes, NGOs,
and individuals are invited to attend
one or both of the Scoping meetings and
to assist the staff in identifying the
scope of environmental issues to be
analyzed in an Environmental
Assessment. Those who plan to attend
the Site Visit must notify Chugach
Electric of their planned attendance.
Cooper Landing Scoping Meeting
Date and Time: Tuesday, September
6, 2005, 7 p.m. to 9 p.m. (AKT).
Location: Cooper Landing Community
Club, 18511 Bean Creek Road, Cooper
Landing, Alaska 99575. (907) 595–1712.
The Community Club is located
approximately 2 hours south of
Anchorage off the Sterling Highway at
milepost 47.7 (Cooper Landing). Turn
north on Bean Creek Road.
Site Visit of Project
Date and Time: Wednesday,
September 7, 2005, 1 p.m. to 4 p.m.
(AKT).
Location: Cooper Lake Power House,
Cooper Landing, Alaska.
RSVP: By August 22, 2005, Ms. May
Clark, Relicensing Secretary, Chugach
Electric, 907–762–4547 or
may_clark@chugachelectric.com.
The Power House is located
approximately 2 hours south of
Anchorage off the Sterling Highway at
milepost 48.0 (Cooper Landing). After
VerDate jul<14>2003
15:34 Aug 04, 2005
Jkt 205001
crossing over the Kenai River Bridge,
turn south (left) on Snug Harbor Road
and travel eleven miles to the Power
House.
Anchorage Scoping Meeting
Date and Time: Thursday, September
8, 2005, 1 p.m. to 3 p.m. (AKT).
Location: Hawthorn Suites, 1110 West
8th Ave, Anchorage, Alaska. 907–222–
5005.
Copies of the Scoping Document
(SD1) outlining the subject areas to be
addressed in the EA were distributed to
the parties on the Commission’s mailing
list. Copies of the SD1 will be available
at the scoping meeting or may be
viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link
(see item m above).
Objectives
At the scoping meetings, the staff will:
(1) Summarize the environmental issues
tentatively identified for analysis in the
EA; (2) solicit from the meeting
participants all available information,
especially quantifiable data, on the
resources at issue; (3) encourage
statements from experts and the public
on issues that should be analyzed in the
EA, including viewpoints in opposition
to, or in support of, the staff’s
preliminary views; (4) determine the
resource issues to be addressed in the
EA; and (5) identify those issues that
require a detailed analysis, as well as
those issues that do not require a
detailed analysis.
Procedures
The meetings are recorded by a
stenographer and become part of the
formal record of the Commission
proceeding on the project.
Individuals, organizations, and
agencies with environmental expertise
and concerns are encouraged to attend
the meeting and to assist the staff in
defining and clarifying the issues to be
addressed in the EA.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–4200 Filed 8–4–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Transfer of
License, and Soliciting Comments,
Motions To Intervene, and Protests
July 28, 2005.
Take notice that the following
hydroelectric application has been filed
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
with the Commission and is available
for public inspection:
a. Application Type: Partial transfer of
license.
b. Project No.: 2309–013.
c. Date Filed: July 15, 2005.
d. Applicants: PSEG Fossil LLC (PSEG
Fossil); Jersey Central Power & Light
Company (JCP&L); Exelon Generation
Company, LLC (Exelon Generation).
e. Name and Location of Project: The
Yards Creek Hydroelectric Project is a
pumped storage project located on
Yards Creek in Warren County, New
Jersey.
f. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
g. Applicants’ Contact: Gary A.
Morgans, Steptoe & Johnson, LLP, 1330
Connecticut Avenue, NW., Washington,
DC 20036, (202) 429–6234.
h. FERC Contact: James Hunter at
(202) 502–6086.
i. Deadline for filing comments,
protests, and motions to intervene:
August 29, 2005.
All documents (original and eight
copies) should be filed with: Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper; see 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Please include the Project Number on
any comments or motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing a document with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the documents
on that resource agency.
j. Description of Application: The
Applicants seek Commission approval
of a partial transfer the license from
PSEG Fossil to Exelon Generation.
JCP&L would remain as co-licensee.
k. This filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number (P–2309) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
E:\FR\FM\05AUN1.SGM
05AUN1
Federal Register / Vol. 70, No. 150 / Friday, August 5, 2005 / Notices
reproduction at the address in item g.
above.
l. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
m. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
n. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. Any of the above-named
documents must be filed by providing
the original and eight copies to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. A copy of any
motion to intervene must also be served
upon each representative of the
Applicants specified in the particular
application.
o. Agency Comments—Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicants. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicants’ representatives.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–4201 Filed 8–4–05; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6666–1]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
VerDate jul<14>2003
15:34 Aug 04, 2005
Jkt 205001
Weekly receipt of Environmental Impact
Statements
Filed 07/25/2005 through 07/29/2005
Pursuant to 40 CFR 1506.9.
EIS No. 20050313, Final EIS, DOE, UT,
Moab Uranium Mill Trails
Remediation, Proposal to Clean Up
Surface Contamination and
Implement a Ground Water Strategy,
Grand and San Juan Counties, UT,
Wait Period Ends: 09/05/2005,
Contact: Donald R. Metzler 1–800–
637–4575.
This document is available on the
Internet at: https://gj.em.doe.gov/moab/
eis/feis.htm.
EIS No. 20050314, Final EIS, AFS, MT,
Grasshopper Fuels Management
Project, Modification of Vegetation
Conditions, Reduction in Fuel Loads
and Break Up Fuel Continuity,
Beaverhead-Deerlodge National
Forest, Dillon Ranger District,
Beaverhead County, MT, Wait Period
Ends: 09/05/2005, Contact: Greg Clark
406–683–3935.
EIS No. 20050315, Draft EIS, AFS, UT,
Fishlake National Forest Off-Highway
Vehicle Route Designation Project,
Proposes to Designate a System of
Motorized Road, Trails, and Areas to
Revise and Update the Existing
Motorized Travel Plan, UT, Comment
Period Ends: 09/19/2005, Contact:
Dale Deiter 435–896–1007.
EIS No. 20050316, Final EIS, FAA, IL,
O’Hare Modernization Program,
Proposes Major Development, Chicago
O’Hare International Airport, Airport
Layout Plan (ALP), Federal Funding,
U.S. Army COE Section 404 Permit,
City of Chicago, IL, Wait Period Ends:
09/05/2005, Contact: Michael W.
MacMullen 847–294–8339.
EIS No. 20050317, Final EIS, NAS, FL,
New Horizons Mission to Pluto,
Continued Preparations and
Implementation to Explore Pluto and
Potentially the Recently Discovered
Kuiper Belt, Cape Canaveral Air Force
Station, FL, Wait Period Ends: 09/05/
2005, Contact: Kurt Lindstrom 202–
358–1588.
EIS No. 20050318, Draft EIS, BIA, MI,
Nottawaseppi Huron Band of
Potawatomi Indians (the Tribe),
Proposes Fee-to-Trust Transfer and
Casino Project, Calhoun County, MI,
Comment Period Ends: 10/03/2005
Contact: Terrance L. Virden 612–725–
4510.
EIS No. 20050319, Draft EIS, FTA, UT,
Mid-Jordan Transit Corridor Project,
Proposed Light Rail Transit Service,
Funding, Salt Lake County, UT,
Comment Period Ends: 09/19/2005,
Contact: Don Cover 720–963–3300.
EIS No. 20050320, Final EIS, AFS, UT,
Wasatch Plateau Grazing Project,
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
45389
Proposal to Continue to Authorize
Sheep Grazing by Issuance of a Term
Grazing Permits on 31 Sheep
Allotments, Manti-La Sal National
Forest, Sanpete, Ferron and Price
Ranger Districts, Sanpete, Carbon,
Utah and Emery County, UT, Wait
Period Ends: 09/05/2005, Contact:
John Healy 435–636–3585.
EIS No. 20050321, Draft EIS, USA, PA,
Pennsylvania Army National Guard’s
56th Brigade Transformation into a
Stryker Brigade Combat Team (SBCT),
Proposal to Comply with this
Directive, near Annville, PA,
Comment Period Ends: 09/19/2005,
Contact: Cpt. Patricia Rickard 717–
861–2580.
EIS No. 20050322, Final EIS, FRC, WA,
Capacity Replacement Project,
Construction and Operation of 79.5
miles Pipeline: Modify 5 Existing
Compressor Stations, U.S. Army COE
10 and 404 Permits, Whatcom, Skagit,
Snohomish, King, Pierce and
Thurston Counties, WA, Wait Period
Ends: 09/05/2005, Contact: Peter
Contreras 206–553–6708.
EIS No. 20050323, Final EIS, NOA, CA,
Monterey Accelerated Research
Systems (MARS) Cabled Observatory,
Proposes to Install and Operate an
Advanced Undersea Cabled
Observatory, Monterey Bay, Pacific
Ocean Offshore of Moss Landing,
Monterey County, CA, Wait Period
Ends: 09/05/2005, Contact: William
Douros 831–647–4201.
EIS No. 20050324, Final EIS, FRA, FL,
Florida High Speed Rail, Tampa to
Orlando, Transportation
Improvement, NPDES Permit and U.S.
Army COE Section 404 Permit,
Hillsborough, Orange Osceola, and
Polk Counties, FL, Wait Period Ends:
09/05/2005, Contact: David
Valenstein 202–493–6368.
Amended Notices
EIS No. 20050222, Draft EIS, FAA, AZ,
Phoenix Sky Harbor International
Airport (PHX), Construction and
Operation of a Terminal, Airfield and
Surface Transportation, City of
Phoenix, Maricopa County, AZ,
Comment Period Ends: 08/10/2005,
Contact: Jennifer Mendelsohn 310–
725–3637.
Revision of Federal Register Notice
Published 06/10/2005: Extending the
Comment Period from 07/26/2005 to 08/
10/2005.
EIS No. 20050262, Draft EIS, FHW, DC,
Klingle Road Reconstruction Project,
Reconstructing for Vehicular and
Recreational Uses, Between Porter
Street, NW., and Cortland Place, NW.,
Funding, Washington, DC, Comment
E:\FR\FM\05AUN1.SGM
05AUN1
Agencies
[Federal Register Volume 70, Number 150 (Friday, August 5, 2005)]
[Notices]
[Pages 45388-45389]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-4201]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application for Transfer of License, and Soliciting
Comments, Motions To Intervene, and Protests
July 28, 2005.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Partial transfer of license.
b. Project No.: 2309-013.
c. Date Filed: July 15, 2005.
d. Applicants: PSEG Fossil LLC (PSEG Fossil); Jersey Central Power
& Light Company (JCP&L); Exelon Generation Company, LLC (Exelon
Generation).
e. Name and Location of Project: The Yards Creek Hydroelectric
Project is a pumped storage project located on Yards Creek in Warren
County, New Jersey.
f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
g. Applicants' Contact: Gary A. Morgans, Steptoe & Johnson, LLP,
1330 Connecticut Avenue, NW., Washington, DC 20036, (202) 429-6234.
h. FERC Contact: James Hunter at (202) 502-6086.
i. Deadline for filing comments, protests, and motions to
intervene: August 29, 2005.
All documents (original and eight copies) should be filed with:
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. Comments, protests, and
interventions may be filed electronically via the Internet in lieu of
paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the
Commission's Web site under the ``e-Filing'' link. The Commission
strongly encourages electronic filings. Please include the Project
Number on any comments or motions filed.
The Commission's Rules of Practice and Procedure require all
intervenors filing a document with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the documents on that resource agency.
j. Description of Application: The Applicants seek Commission
approval of a partial transfer the license from PSEG Fossil to Exelon
Generation. JCP&L would remain as co-licensee.
k. This filing is available for review at the Commission in the
Public Reference Room or may be viewed on the Commission's Web site at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number (P-2309) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is
also available for inspection and
[[Page 45389]]
reproduction at the address in item g. above.
l. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
m. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
n. Filing and Service of Responsive Documents--Any filings must
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE'', as applicable, and the Project Number of the
particular application to which the filing refers. Any of the above-
named documents must be filed by providing the original and eight
copies to: The Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. A copy of any motion to
intervene must also be served upon each representative of the
Applicants specified in the particular application.
o. Agency Comments--Federal, State, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicants.
If an agency does not file comments within the time specified for
filing comments, it will be presumed to have no comments. One copy of
an agency's comments must also be sent to the Applicants'
representatives.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-4201 Filed 8-4-05; 8:45 am]
BILLING CODE 6717-01-P