El Paso Natural Gas Company; Notice of Compliance Filing, 44603 [E5-4173]

Download as PDF Federal Register / Vol. 70, No. 148 / Wednesday, August 3, 2005 / Notices Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. 05–15395 Filed 8–2–05; 8:45 am] BILLING CODE 6717–01–P ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time August 5, 2005. Magalie R. Salas, Secretary. [FR Doc. E5–4187 Filed 8–2–05; 8:45 am] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission BILLING CODE 6717–01–P [Docket No. RP05–520–000] Eastern Shore Natural Gas Company; Notice of Penalty Sharing Report July 29, 2005. Take notice that on July 26, 2005, Eastern Shore Natural Gas Company (Eastern Shore) tendered for filing a report detailing the distribution of penalty revenue sharing amounts to affected buyers. Eastern Shore states that copies of the filing have been served upon the recipients of the refund and their respective state commissions. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in on or before the date as indicated below. Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the VerDate jul<14>2003 15:22 Aug 02, 2005 Jkt 205001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. RP04–248–007 and RP04–251– 008] 44603 The Commission encourages electronic submission of protests in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E5–4173 Filed 8–2–05; 8:45 am] BILLING CODE 6717–01–P El Paso Natural Gas Company; Notice of Compliance Filing DEPARTMENT OF ENERGY July 29, 2005. Take notice that on July 25, 2005, El Paso Natural Gas Company (EPNG) tendered for filing as part of its FERC Gas Tariff, Second Revised Volume No. 1A, the following tariff sheets to become effective May 1, 2005: Second Substitute Original Sheet No. 136 Second Substitute Original Sheet No. 137 EPNG states that the filing is being made in compliance with the Commission Order dated May 27, 2005, in the above listed proceeding. EPNG states that these tariff sheets are revised to suspend the Rate Schedule PAL penalty provisions when EPNG is unable to schedule PAL nominations. EPNG states that copies of the filing were served on parties on the official service list in the above-captioned proceedings. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. PO 00000 Frm 00051 Fmt 4703 Sfmt 4703 Federal Energy Regulatory Commission [EL05–132–000] Exelon Generation Company, LLC, AmerGen Energy Company, LLC, Commonwealth Edison Company, Unicom Power Marketing, Inc., PECO, Energy Company, Exelon Energy Company, Exelon Edgar, LLC, Exelon West Medway, LLC, Exelon Wyman, LLC, Exelon New Boston, LLC, Exelon Framingham, LLC, and Exelon New England Power Marketing, L.P.; Notice of Institution of Proceeding and Refund Effective Date July 7, 2005. On July 5, 2005, the Commission issued an order that instituted a proceeding in Docket No. EL05–132– 000, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824e, concerning the continued justness and reasonableness of the market-based rates charged by Exelon Corporation (Exelon Generation Company, LLC) and its affiliates, AmerGen Energy Company, LLC, Commonwealth Edison Company, Unicom Power Marketing, Inc., Exelon Edgar, LLC, Exelon Framingham, LLC, Exelon West Medway, LLC, Exelon Wyman, LLC, and Exelon New Boston, LLC, Exelon New England Power Marketing, L.P., PECO Energy Company, and Exelon Energy Company’s. Exelon E:\FR\FM\03AUN1.SGM 03AUN1

Agencies

[Federal Register Volume 70, Number 148 (Wednesday, August 3, 2005)]
[Notices]
[Page 44603]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-4173]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. RP04-248-007 and RP04-251-008]


El Paso Natural Gas Company; Notice of Compliance Filing

July 29, 2005.
    Take notice that on July 25, 2005, El Paso Natural Gas Company 
(EPNG) tendered for filing as part of its FERC Gas Tariff, Second 
Revised Volume No. 1A, the following tariff sheets to become effective 
May 1, 2005:

Second Substitute Original Sheet No. 136
Second Substitute Original Sheet No. 137

    EPNG states that the filing is being made in compliance with the 
Commission Order dated May 27, 2005, in the above listed proceeding. 
EPNG states that these tariff sheets are revised to suspend the Rate 
Schedule PAL penalty provisions when EPNG is unable to schedule PAL 
nominations.
    EPNG states that copies of the filing were served on parties on the 
official service list in the above-captioned proceedings.
    Any person desiring to protest this filing must file in accordance 
with Rule 211 of the Commission's Rules of Practice and Procedure (18 
CFR 385.211). Protests to this filing will be considered by the 
Commission in determining the appropriate action to be taken, but will 
not serve to make protestants parties to the proceeding. Such protests 
must be filed in accordance with the provisions of Section 154.210 of 
the Commission's regulations (18 CFR 154.210). Anyone filing a protest 
must serve a copy of that document on all the parties to the 
proceeding.
    The Commission encourages electronic submission of protests in lieu 
of paper using the ``eFiling'' link at https://www.ferc.gov. Persons 
unable to file electronically should submit an original and 14 copies 
of the protest to the Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Magalie R. Salas,
Secretary.
[FR Doc. E5-4173 Filed 8-2-05; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.