project would operate as a closed
system using water obtained from
groundwater sources. The proposed
project would have an annual
generation of 1,576,800 MWh.
k. Location of Applications: A copy of
the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item g
above.
l. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
m. Competing Preliminary Permit—
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
particular application. A competing
preliminary permit application must
conform with 18 CFR 4.30(b) and 4.36.
n. Competing Development
Application—Any qualified
development applicant desiring to file a
competing development application
must submit to the Commission, on or
before a specified comment date for the
particular application, either a
competing development application or a
notice of intent to file such an
application. Submission of a timely
notice of intent to file a development
application allows an interested person
to file the competing application no
later than 120 days after the specified
comment date for the particular
application. A competing license
application must conform with 18 CFR
4.30(b) and 4.36.
o. Notice of Intent—A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
VerDate jul<14>2003
15:22 Aug 02, 2005
Jkt 205001
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
p. Proposed Scope of Studies under
Permit—A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
q. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper; See 18 C.F.R.
385.2001 (a)(1)(iii) and the instructions
on the Commission’s Web site under ‘‘efiling’’ link. The Commission strongly
encourages electronic filing.
r. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT
TO FILE COMPETING APPLICATION’’,
‘‘COMPETING APPLICATION’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
Any of the above-named documents
must be filed by providing the original
and the number of copies provided by
the Commission’s regulations to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. An additional
copy must be sent to Director, Division
of Hydropower Administration and
Compliance, Federal Energy Regulatory
Commission, at the above-mentioned
address. A copy of any notice of intent,
competing application or motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
PO 00000
Frm 00069
Fmt 4703
Sfmt 4703
44621
s. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E5–4159 Filed 8–2–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Non-Project
Use of Project Lands and Soliciting
Comments, Motions To Intervene, and
Protests
July 25, 2005.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Non-Project Use
of Project Lands.
b. Project No: 2686–041.
c. Date Filed: June 24, 2005.
d. Applicant: Duke Power.
e. Name of Project: West Fork
Hydroelectric Project.
f. Location: The proposed facility is
located in Jackson County, North
Carolina.
g. Filed Pursuant to: Federal Power
Act, 16 US.C. 791(a)–825(r) and 799 and
801.
h. Applicant Contact: Mr. Joe Hall,
Lake Management Representative, Duke
Power, a division of Duke Energy Corp.,
P.O. Box 1006, Charlotte, North Carolina
28201–1006, (704) 382–8576.
i. FERC Contacts: Any questions on
this notice should be addressed to Ms.
Shana High at (202) 502–8674, or e-mail
address: shana.high@ferc.gov.
j. Deadline for filing comments and or
motions: August 29, 2005.
All documents (original and eight
copies) should be filed with: Ms.
Magalie R. Salas, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington DC 20426.
Please include the project number (P–
2686–041) on any comments or motions
filed. Comments, protests, and
interventions may be filed electronically
via the internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
E:\FR\FM\03AUN1.SGM
03AUN1
44622
Federal Register / Vol. 70, No. 148 / Wednesday, August 3, 2005 / Notices
Commission strongly encourages efilings.
k. Description of Request: The
application seeks Commission approval
to lease 0.31 acre of project property to
Glenville Masonic Lodge, Inc. to
construct one cluster dock with ten boat
docking locations. The proposed facility
will serve the general public on Lake
Glenville.
l. Location of the Applications: The
filing is available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov, using the ‘‘eLibrary’’ link.
For assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY,
contact (202) 502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’, OR
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. A copy of any motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the applications may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
VerDate jul<14>2003
15:22 Aug 02, 2005
Jkt 205001
instructions on the Commission’s Web
site at https://www.ferc.gov under the
‘‘e-Filing’’ link.
Magalie R. Salas,
Secretary.
[FR Doc. E5–4163 Filed 8–2–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Surrender of
License and Soliciting Comments,
Motions To Intervene, and Protests
July 29, 2005.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Surrender of
License.
b. Project No.: 2304–008.
c. Date Filed: July 20, 2005.
d. Licensee: Salt River Project
Agricultural Improvement and Power
District (SRP).
e. Name of Project: Blue Ridge Hydro
(Project).
f. Location: On East Clear Creek, a
tributary of the Little Colorado River,
and the East Verde River, a tributary of
the Verde River, in Coconino and Gila
Counties, Arizona.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Licensee Contacts: Joel L. Greene,
Jennings, Strouss & Salmon, P.L.C., 1500
K Street, N.W., Suite 330, Washington,
DC 20005, (202) 371–9889; Frederic L.
Beeson, Manager, Litigation Services,
Salt River Project, Mail Station PAB
341, PO Box 52025, Phoenix, Arizona
85072–2025, (602) 236–2020.
i. FERC Contact: Regina Saizan, (202)
502–8765.
j. Deadline for filing comments and
motions to intervene: August 18, 2005.
All documents (original and eight
copies) should be filed with: Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests, and
interventions may be filed electronically
via the Internet in lieu of paper; see 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings. Please include the
project number (P–2304–008) on any
comments or motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
PO 00000
Frm 00070
Fmt 4703
Sfmt 4703
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. Description of Application: The
United States (U.S.) and the Salt River
Valley Water Users’ Association
(Association) jointly operate and
maintain the Salt River Federal
Reclamation Project (Reclamation
Project). The Reclamation Project
includes all dams on the Salt River and
the associated hydroelectric facilities
regulated by the Bureau of Reclamation
(BR). The application was filed to
facilitate the incorporation of the Project
into the Reclamation Project pursuant to
section 213 of the Arizona Water
Settlements Act of 2004, Pub. L. No.
108–451 (the Settlements Act). The
Settlements Act provides that the
Secretary of the Interior shall accept
transfer of title to the project from SRP
and hold title for the benefit of the
Reclamation Project; that upon transfer
of the title, the Commission shall have
no further licensing and regulatory
authority over the project; that the
Association and SRP shall be
responsible for the care, operation, and
maintenance of the project pursuant to
the contract between the U.S. and the
Association, dated September 6, 1917,
as amended; and that all other
applicable Federal environmental laws
shall continue to apply to the Project.
The Project will ultimately be operated
under the oversight of the BR.
l. Locations of Application: A copy of
the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room, located at 888 First Street NE.,
Room 2A, Washington, DC 20426, or by
calling (202) 502–8371. This filing may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number, here P–2304, in the docket
number field to access the document.
For assistance, call toll-free 1–866–208–
3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the addresses in item h.
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
E:\FR\FM\03AUN1.SGM
03AUN1
Agencies
[Federal Register Volume 70, Number 148 (Wednesday, August 3, 2005)]
[Notices]
[Pages 44621-44622]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-4163]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application for Non-Project Use of Project Lands and
Soliciting Comments, Motions To Intervene, and Protests
July 25, 2005.
Take notice that the following application has been filed with the
Commission and is available for public inspection:
a. Application Type: Non-Project Use of Project Lands.
b. Project No: 2686-041.
c. Date Filed: June 24, 2005.
d. Applicant: Duke Power.
e. Name of Project: West Fork Hydroelectric Project.
f. Location: The proposed facility is located in Jackson County,
North Carolina.
g. Filed Pursuant to: Federal Power Act, 16 US.C. 791(a)-825(r) and
799 and 801.
h. Applicant Contact: Mr. Joe Hall, Lake Management Representative,
Duke Power, a division of Duke Energy Corp., P.O. Box 1006, Charlotte,
North Carolina 28201-1006, (704) 382-8576.
i. FERC Contacts: Any questions on this notice should be addressed
to Ms. Shana High at (202) 502-8674, or e-mail address:
shana.high@ferc.gov.
j. Deadline for filing comments and or motions: August 29, 2005.
All documents (original and eight copies) should be filed with: Ms.
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington DC 20426. Please include the project
number (P-2686-041) on any comments or motions filed. Comments,
protests, and interventions may be filed electronically via the
internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission's Web site under the ``e-Filing'' link.
The
[[Page 44622]]
Commission strongly encourages e-filings.
k. Description of Request: The application seeks Commission
approval to lease 0.31 acre of project property to Glenville Masonic
Lodge, Inc. to construct one cluster dock with ten boat docking
locations. The proposed facility will serve the general public on Lake
Glenville.
l. Location of the Applications: The filing is available for review
at the Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov, using the ``eLibrary''
link. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3676, or for TTY,
contact (202) 502-8659.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filings must
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS
FOR TERMS AND CONDITIONS'', ``PROTEST'', OR ``MOTION TO INTERVENE'', as
applicable, and the Project Number of the particular application to
which the filing refers. A copy of any motion to intervene must also be
served upon each representative of the Applicant specified in the
particular application.
p. Agency Comments: Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
applications may be obtained by agencies directly from the Applicant.
If an agency does not file comments within the time specified for
filing comments, it will be presumed to have no comments. One copy of
an agency's comments must also be sent to the Applicant's
representatives.
q. Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site at https://www.ferc.gov
under the ``e-Filing'' link.
Magalie R. Salas,
Secretary.
[FR Doc. E5-4163 Filed 8-2-05; 8:45 am]
BILLING CODE 6717-01-P