Notice of Application for Non-Project Use of Project Lands and Soliciting Comments, Motions To Intervene, and Protests, 44621-44622 [E5-4163]

Download as PDF Federal Register / Vol. 70, No. 148 / Wednesday, August 3, 2005 / Notices project would operate as a closed system using water obtained from groundwater sources. The proposed project would have an annual generation of 1,576,800 MWh. k. Location of Applications: A copy of the application is available for inspection and reproduction at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call toll-free 1–866–208– 3676 or e-mail FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item g above. l. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. m. Competing Preliminary Permit— Anyone desiring to file a competing application for preliminary permit for a proposed project must submit the competing application itself, or a notice of intent to file such an application, to the Commission on or before the specified comment date for the particular application (see 18 CFR 4.36). Submission of a timely notice of intent allows an interested person to file the competing preliminary permit application no later than 30 days after the specified comment date for the particular application. A competing preliminary permit application must conform with 18 CFR 4.30(b) and 4.36. n. Competing Development Application—Any qualified development applicant desiring to file a competing development application must submit to the Commission, on or before a specified comment date for the particular application, either a competing development application or a notice of intent to file such an application. Submission of a timely notice of intent to file a development application allows an interested person to file the competing application no later than 120 days after the specified comment date for the particular application. A competing license application must conform with 18 CFR 4.30(b) and 4.36. o. Notice of Intent—A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit, if such an application may be filed, either a preliminary permit application or a development VerDate jul<14>2003 15:22 Aug 02, 2005 Jkt 205001 application (specify which type of application). A notice of intent must be served on the applicant(s) named in this public notice. p. Proposed Scope of Studies under Permit—A preliminary permit, if issued, does not authorize construction. The term of the proposed preliminary permit would be 36 months. The work proposed under the preliminary permit would include economic analysis, preparation of preliminary engineering plans, and a study of environmental impacts. Based on the results of these studies, the Applicant would decide whether to proceed with the preparation of a development application to construct and operate the project. q. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper; See 18 C.F.R. 385.2001 (a)(1)(iii) and the instructions on the Commission’s Web site under ‘‘efiling’’ link. The Commission strongly encourages electronic filing. r. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘NOTICE OF INTENT TO FILE COMPETING APPLICATION’’, ‘‘COMPETING APPLICATION’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. Any of the above-named documents must be filed by providing the original and the number of copies provided by the Commission’s regulations to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. An additional copy must be sent to Director, Division of Hydropower Administration and Compliance, Federal Energy Regulatory Commission, at the above-mentioned address. A copy of any notice of intent, competing application or motion to intervene must also be served upon each representative of the Applicant specified in the particular application. PO 00000 Frm 00069 Fmt 4703 Sfmt 4703 44621 s. Agency Comments—Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Magalie R. Salas, Secretary. [FR Doc. E5–4159 Filed 8–2–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application for Non-Project Use of Project Lands and Soliciting Comments, Motions To Intervene, and Protests July 25, 2005. Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Non-Project Use of Project Lands. b. Project No: 2686–041. c. Date Filed: June 24, 2005. d. Applicant: Duke Power. e. Name of Project: West Fork Hydroelectric Project. f. Location: The proposed facility is located in Jackson County, North Carolina. g. Filed Pursuant to: Federal Power Act, 16 US.C. 791(a)–825(r) and 799 and 801. h. Applicant Contact: Mr. Joe Hall, Lake Management Representative, Duke Power, a division of Duke Energy Corp., P.O. Box 1006, Charlotte, North Carolina 28201–1006, (704) 382–8576. i. FERC Contacts: Any questions on this notice should be addressed to Ms. Shana High at (202) 502–8674, or e-mail address: shana.high@ferc.gov. j. Deadline for filing comments and or motions: August 29, 2005. All documents (original and eight copies) should be filed with: Ms. Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington DC 20426. Please include the project number (P– 2686–041) on any comments or motions filed. Comments, protests, and interventions may be filed electronically via the internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The E:\FR\FM\03AUN1.SGM 03AUN1 44622 Federal Register / Vol. 70, No. 148 / Wednesday, August 3, 2005 / Notices Commission strongly encourages efilings. k. Description of Request: The application seeks Commission approval to lease 0.31 acre of project property to Glenville Masonic Lodge, Inc. to construct one cluster dock with ten boat docking locations. The proposed facility will serve the general public on Lake Glenville. l. Location of the Applications: The filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov, using the ‘‘eLibrary’’ link. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, contact (202) 502–8659. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘RECOMMENDATIONS FOR TERMS AND CONDITIONS’’, ‘‘PROTEST’’, OR ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments: Federal, state, and local agencies are invited to file comments on the described application. A copy of the applications may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. q. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the VerDate jul<14>2003 15:22 Aug 02, 2005 Jkt 205001 instructions on the Commission’s Web site at https://www.ferc.gov under the ‘‘e-Filing’’ link. Magalie R. Salas, Secretary. [FR Doc. E5–4163 Filed 8–2–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application for Surrender of License and Soliciting Comments, Motions To Intervene, and Protests July 29, 2005. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Surrender of License. b. Project No.: 2304–008. c. Date Filed: July 20, 2005. d. Licensee: Salt River Project Agricultural Improvement and Power District (SRP). e. Name of Project: Blue Ridge Hydro (Project). f. Location: On East Clear Creek, a tributary of the Little Colorado River, and the East Verde River, a tributary of the Verde River, in Coconino and Gila Counties, Arizona. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Licensee Contacts: Joel L. Greene, Jennings, Strouss & Salmon, P.L.C., 1500 K Street, N.W., Suite 330, Washington, DC 20005, (202) 371–9889; Frederic L. Beeson, Manager, Litigation Services, Salt River Project, Mail Station PAB 341, PO Box 52025, Phoenix, Arizona 85072–2025, (602) 236–2020. i. FERC Contact: Regina Saizan, (202) 502–8765. j. Deadline for filing comments and motions to intervene: August 18, 2005. All documents (original and eight copies) should be filed with: Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Please include the project number (P–2304–008) on any comments or motions filed. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission PO 00000 Frm 00070 Fmt 4703 Sfmt 4703 to serve a copy of that document on each person in the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Application: The United States (U.S.) and the Salt River Valley Water Users’ Association (Association) jointly operate and maintain the Salt River Federal Reclamation Project (Reclamation Project). The Reclamation Project includes all dams on the Salt River and the associated hydroelectric facilities regulated by the Bureau of Reclamation (BR). The application was filed to facilitate the incorporation of the Project into the Reclamation Project pursuant to section 213 of the Arizona Water Settlements Act of 2004, Pub. L. No. 108–451 (the Settlements Act). The Settlements Act provides that the Secretary of the Interior shall accept transfer of title to the project from SRP and hold title for the benefit of the Reclamation Project; that upon transfer of the title, the Commission shall have no further licensing and regulatory authority over the project; that the Association and SRP shall be responsible for the care, operation, and maintenance of the project pursuant to the contract between the U.S. and the Association, dated September 6, 1917, as amended; and that all other applicable Federal environmental laws shall continue to apply to the Project. The Project will ultimately be operated under the oversight of the BR. l. Locations of Application: A copy of the application is available for inspection and reproduction at the Commission in the Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number, here P–2304, in the docket number field to access the document. For assistance, call toll-free 1–866–208– 3676 or e-mail FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the addresses in item h. above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to E:\FR\FM\03AUN1.SGM 03AUN1

Agencies

[Federal Register Volume 70, Number 148 (Wednesday, August 3, 2005)]
[Notices]
[Pages 44621-44622]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-4163]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Application for Non-Project Use of Project Lands and 
Soliciting Comments, Motions To Intervene, and Protests

July 25, 2005.
    Take notice that the following application has been filed with the 
Commission and is available for public inspection:
    a. Application Type: Non-Project Use of Project Lands.
    b. Project No: 2686-041.
    c. Date Filed: June 24, 2005.
    d. Applicant: Duke Power.
    e. Name of Project: West Fork Hydroelectric Project.
    f. Location: The proposed facility is located in Jackson County, 
North Carolina.
    g. Filed Pursuant to: Federal Power Act, 16 US.C. 791(a)-825(r) and 
799 and 801.
    h. Applicant Contact: Mr. Joe Hall, Lake Management Representative, 
Duke Power, a division of Duke Energy Corp., P.O. Box 1006, Charlotte, 
North Carolina 28201-1006, (704) 382-8576.
    i. FERC Contacts: Any questions on this notice should be addressed 
to Ms. Shana High at (202) 502-8674, or e-mail address: 
shana.high@ferc.gov.
    j. Deadline for filing comments and or motions: August 29, 2005.
    All documents (original and eight copies) should be filed with: Ms. 
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE., Washington DC 20426. Please include the project 
number (P-2686-041) on any comments or motions filed. Comments, 
protests, and interventions may be filed electronically via the 
internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the 
instructions on the Commission's Web site under the ``e-Filing'' link. 
The

[[Page 44622]]

Commission strongly encourages e-filings.
    k. Description of Request: The application seeks Commission 
approval to lease 0.31 acre of project property to Glenville Masonic 
Lodge, Inc. to construct one cluster dock with ten boat docking 
locations. The proposed facility will serve the general public on Lake 
Glenville.
    l. Location of the Applications: The filing is available for review 
at the Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at https://www.ferc.gov, using the ``eLibrary'' 
link. For assistance, contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3676, or for TTY, 
contact (202) 502-8659.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filings must 
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS 
FOR TERMS AND CONDITIONS'', ``PROTEST'', OR ``MOTION TO INTERVENE'', as 
applicable, and the Project Number of the particular application to 
which the filing refers. A copy of any motion to intervene must also be 
served upon each representative of the Applicant specified in the 
particular application.
    p. Agency Comments: Federal, state, and local agencies are invited 
to file comments on the described application. A copy of the 
applications may be obtained by agencies directly from the Applicant. 
If an agency does not file comments within the time specified for 
filing comments, it will be presumed to have no comments. One copy of 
an agency's comments must also be sent to the Applicant's 
representatives.
    q. Comments, protests and interventions may be filed electronically 
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and 
the instructions on the Commission's Web site at https://www.ferc.gov 
under the ``e-Filing'' link.

Magalie R. Salas,
Secretary.
[FR Doc. E5-4163 Filed 8-2-05; 8:45 am]
BILLING CODE 6717-01-P