Fox River Paper Company, N.E.W. Hydro, Inc.; Notice of Authorization for Continued Project Operation, 44604-44605 [05-15394]
Download as PDF
44604
Federal Register / Vol. 70, No. 148 / Wednesday, August 3, 2005 / Notices
Corporation, et al, 112 FERC ¶61,027
(2005).
The refund effective date in Docket
No. EL05–132–000, established
pursuant to section 206(b) of the FPA,
will be 60 days from the date of
publication of this notice in the Federal
Register.
Magalie R. Salas,
Secretary.
[FR Doc. 05–15386 Filed 8–2–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project 11301–010]
Fall Line Hydro Company, Inc.; Notice
Rejecting Request for Rehearing
July 29, 2005.
On July 18, 2005, Fall Line Hydro
Company, Inc. filed a request for
rehearing of a June 8, 2005, Commission
staff order denying extension of time to
commence construction for the Carters
Reregulation Dam Project No. 11301.
The project is located at the U.S. Army
Corps of Engineers’ Carters Reregulation
Dam and Reservoir on the Cossawattee
River near the town of Calhoun, in
Murray County, Georgia.
Pursuant to section 313(a) of the
Federal Power Act, 16 U.S.C. 8251(a), an
aggrieved party must filed a request for
rehearing within thirty days after the
issuance of the Commission’s Order, in
this case no, later than July 8, 2005.
Because the 30-day rehearing deadline
is statutory based it cannot be extended
and Fall Line Hydro Company, Inc.’s
request for rehearing must be rejected as
untimely.
This notice constitutes final agency
action. Requests for rehearing by the
Commission of this rejection notice may
be filed within 30 days of the date of
issuance of this notice, pursuant to 18
CFR 385.712.
Magalie R. Salas,
Secretary.
[FR Doc. E5–4164 Filed 8–2–05; 8:45 am]
BILLING CODE 6717–01–P
VerDate jul<14>2003
15:22 Aug 02, 2005
Jkt 205001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP05–519–000]
Florida Gas Transmission Company;
Notice of Proposed Changes in FERC
Gas Tariff
July 29, 2005.
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Take notice that on July 22, 2005,
Florida Gas Transmission Company
(FGT) tendered for filing as part of its
FERC Gas Tariff, Third Revised Volume
No. 1, the following tariff sheets, to
become effective August 1, 2005:
Magalie R. Salas,
Secretary.
[FR Doc. E5–4185 Filed 8–2–05; 8:45 am]
Seventy-First Revised Sheet No. 8A,
Sixty-Third Revised Sheet No. 8A.01,
Sixty-Third Revised Sheet No. 8A.02,
Twenty-Third Revised Sheet No. 8A.04,
Sixty-Sixth Revised Sheet No. 8B,
Fifty-Ninth Revised Sheet No. 8B.01,
Fifteenth Revised Sheet No. 8B.02.
DEPARTMENT OF ENERGY
FGT states that the tariff sheets listed
above are being filed pursuant to section
27.A.2.b of the general terms and
conditions of FGT’s tariff, which
provides for flex adjustments to FGT’s
base fuel reimbursement charge
percentage.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
PO 00000
Frm 00052
Fmt 4703
Sfmt 4703
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
[Project No. 7264]
Fox River Paper Company, N.E.W.
Hydro, Inc.; Notice of Authorization for
Continued Project Operation
July 7, 2005.
On January 22, 2003, Fox River Paper
Company and N.E.W. Hydro, Inc.,
licensees for the Middle Appleton Dam
Project No. 7264, filed an application for
a new or subsequent license pursuant to
the Federal Power Act (FPA) and the
Commission’s regulations thereunder.
Project No. 7264 is located on the Fox
River in Outagamie County, Wisconsin.
The license for Project No. 7264 was
issued for a period ending June 30,
2005. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year to year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
E:\FR\FM\03AUN1.SGM
03AUN1
Federal Register / Vol. 70, No. 148 / Wednesday, August 3, 2005 / Notices
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 7264
is issued to Fox River Paper Company
and N.E.W. Hydro, Inc. for a period
effective July 1, 2005 through June 30,
2006, or until the issuance of a new
license for the project or other
disposition under the FPA, whichever
comes first. If issuance of a new license
(or other disposition) does not take
place on or before July 1, 2006, notice
is hereby given that, pursuant to 18 CFR
16.18(c), an annual license under
section 15(a)(1) of the FPA is renewed
automatically without further order or
notice by the Commission, unless the
Commission orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that Fox River Paper Company and
N.E.W. Hydro, Inc. are authorized to
continue operation of the Middle
Appleton Dam Project No. 7264 until
such time as the Commission acts on its
application for subsequent license.
Magalie R. Salas,
Secretary.
[FR Doc. 05–15394 Filed 8–2–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2194]
FPL Energy Maine Hydro LLC; Notice
of Authorization for Continued Project
Operation
July 7, 2005.
On June 30, 2003, FPL Energy Maine
Hydro LLC, licensee for the Bar Mills
Project No. 2194, filed an application for
a new or subsequent license pursuant to
the Federal Power Act (FPA) and the
Commission’s regulations thereunder.
Project No. 2194 is located on the Saco
River in York County, Maine.
The license for Project No. 2194 was
issued for a period ending June 30,
2005. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year to year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
VerDate jul<14>2003
15:22 Aug 02, 2005
Jkt 205001
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2194
is issued to FPL Energy Maine Hydro
LLC for a period effective July 1, 2005
through June 30, 2006, or until the
issuance of a new license for the project
or other disposition under the FPA,
whichever comes first. If issuance of a
new license (or other disposition) does
not take place on or before July 1, 2006,
notice is hereby given that, pursuant to
18 CFR 16.18(c), an annual license
under section 15(a)(1) of the FPA is
renewed automatically without further
order or notice by the Commission,
unless the Commission orders
otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that FPL Energy Maine Hydro LLC is
authorized to continue operation of the
Bar Mills Project No. 2194 until such
time as the Commission acts on its
application for subsequent license.
Magalie R. Salas,
Secretary.
[FR Doc. 05–15392 Filed 8–2–05; 8:45 am]
BILLING CODE 6717–01–U
DEPARTMENT OF ENERGY
44605
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Federal Energy Regulatory
Commission
Magalie R. Salas,
Secretary.
[FR Doc. 05–15387 Filed 8–2–05; 8:45 am]
[Docket No. RP02–361–053]
BILLING CODE 6717–01–P
Gulfstream Natural Gas System, L.L.C.;
Notice of Negotiated Rate
DEPARTMENT OF ENERGY
July 7, 2005.
Take notice that on June 30, 2005,
Gulfstream Natural Gas System, L.L.C.
(Gulfstream) tendered for filing as part
of its FERC Gas Tariff, Original Volume
No. 1, Original Sheet No. 8.01r,
reflecting an effective date of August 1,
2005.
Gulfstream states that copies of its
filing have been mailed to all affected
customers and interested state
commissions.
PO 00000
Frm 00053
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Docket No. RP05–440–000]
High Island Offshore System, L.L.C.;
Notice of Tariff Filing
July 7, 2005.
Take notice that on July 1, 2005, High
Island Offshore System, L.L.C., tendered
for filing as part of its FERC Gas Tariff,
Third Revised Volume No. 1, the
E:\FR\FM\03AUN1.SGM
03AUN1
Agencies
[Federal Register Volume 70, Number 148 (Wednesday, August 3, 2005)]
[Notices]
[Pages 44604-44605]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-15394]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 7264]
Fox River Paper Company, N.E.W. Hydro, Inc.; Notice of
Authorization for Continued Project Operation
July 7, 2005.
On January 22, 2003, Fox River Paper Company and N.E.W. Hydro,
Inc., licensees for the Middle Appleton Dam Project No. 7264, filed an
application for a new or subsequent license pursuant to the Federal
Power Act (FPA) and the Commission's regulations thereunder. Project
No. 7264 is located on the Fox River in Outagamie County, Wisconsin.
The license for Project No. 7264 was issued for a period ending
June 30, 2005. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1),
requires the Commission, at the expiration of a license term, to issue
from year to year an annual license to the then licensee under the
terms and conditions of the prior license until a new license is
issued, or the project is otherwise disposed of as provided in section
15 or any other applicable section of the FPA. If the project's prior
license waived the applicability of section 15 of the FPA, then, based
on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c),
and as set forth at 18 CFR 16.21(a), if the licensee of such project
has filed an application for a subsequent license, the licensee may
continue to operate the project in accordance with the terms and
conditions of the license after the minor or minor part license
expires, until the Commission acts on its application. If the licensee
of such a project has not filed an application for a subsequent
license, then it may be required, pursuant to 18 CFR 16.21(b), to
continue project operations until the Commission issues someone else a
license for the project or otherwise orders disposition of the project.
[[Page 44605]]
If the project is subject to section 15 of the FPA, notice is
hereby given that an annual license for Project No. 7264 is issued to
Fox River Paper Company and N.E.W. Hydro, Inc. for a period effective
July 1, 2005 through June 30, 2006, or until the issuance of a new
license for the project or other disposition under the FPA, whichever
comes first. If issuance of a new license (or other disposition) does
not take place on or before July 1, 2006, notice is hereby given that,
pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1)
of the FPA is renewed automatically without further order or notice by
the Commission, unless the Commission orders otherwise.
If the project is not subject to section 15 of the FPA, notice is
hereby given that Fox River Paper Company and N.E.W. Hydro, Inc. are
authorized to continue operation of the Middle Appleton Dam Project No.
7264 until such time as the Commission acts on its application for
subsequent license.
Magalie R. Salas,
Secretary.
[FR Doc. 05-15394 Filed 8-2-05; 8:45 am]
BILLING CODE 6717-01-P