PJM Interconnection, L.L.C.; Notice of Institution of Proceeding and Refund Effective Date, 44610-44611 [05-15385]
Download as PDF
44610
Federal Register / Vol. 70, No. 148 / Wednesday, August 3, 2005 / Notices
4. The license does not establish
Committee procedures. Nor does it
require public participation in
Committee matters.5 Since the
complainants do not allege that PG&E is
in violation of its license, the Federal
Power Act, or the Commission’s
regulations, the complaint is dismissed.
Magalie R. Salas,
Secretary.
[FR Doc. E5–4165 Filed 8–2–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2630]
PacifiCorp; Notice of Authorization for
Continued Project Operation
July 7, 2005.
On June 27, 2003, PacifiCorp, licensee
for the Prospect Nos. 1, 2, and 4 Project
No. 2630, filed an application for a new
or subsequent license pursuant to the
Federal Power Act (FPA) and the
Commission’s regulations. Project No.
2630 is located on the Rogue River,
Middle Fork Rogue River, and Red
Blanket Creek in Jackson County,
Oregon.
The license for Project No. 2630 was
issued for a period ending July 1, 2005.
Section 15(a)(1) of the FPA, 16 U.S.C.
808(a)(1), requires the Commission, at
the expiration of a license term, to issue
from year to year an annual license to
the then licensee under the terms and
conditions of the prior license until a
new license is issued, or the project is
otherwise disposed of as provided in
section 15 or any other applicable
section of the FPA. If the project’s prior
license waived the applicability of
section 15 of the FPA, then, based on
section 9(b) of the Administrative
Procedure Act, 5 U.S.C. 558(c), and as
set forth at 18 CFR 16.21(a), if the
licensee of such project has filed an
application for a subsequent license, the
licensee may continue to operate the
project in accordance with the terms
and conditions of the license after the
minor or minor part license expires,
until the Commission acts on its
application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
5 However, any material changes in project
operations during the term of the license will
require a license amendment application, public
notice, and a proceeding in which interested
entities will have an opportunity to participate.
VerDate jul<14>2003
15:22 Aug 02, 2005
Jkt 205001
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2630
is issued to PacifiCorp for a period
effective July 2, 2005 through July 1,
2006, or until the issuance of a new
license for the project or other
disposition under the FPA, whichever
comes first. If issuance of a new license
(or other disposition) does not take
place on or before July 2, 2006, notice
is hereby given that, pursuant to 18 CFR
16.18(c), an annual license under
section 15(a)(1) of the FPA is renewed
automatically without further order or
notice by the Commission, unless the
Commission orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that PacifiCorp is authorized to continue
operation of the Prospect Nos. 1, 2, and
4 Project No. 2630 until such time as the
Commission acts on its application for
subsequent license.
Magalie R. Salas,
Secretary.
[FR Doc. 05–15393 Filed 8–2–05; 8:45 am]
BILLING CODE 6717–01–U
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E5–4180 Filed 8–2–05; 8:45 am]
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
[Docket No. RP05–516–000]
Pine Needle LNG Company, LLC;
Notice of Proposed Changes in FERC
Gas Tariff
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
July 29, 2005.
Take notice that on July 22, 2005,
Pine Needle LNG Company, LLC (Pine
Needle) tendered for filing as part of its
FERC Gas Tariff, Original Volume No. 1,
Third Revised Sheet No. 81 and First
Revised Sheet No. 82, to become
effective August 22, 2005.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
PO 00000
Frm 00058
Fmt 4703
Sfmt 4703
[Docket No. EL05–127–000]
PJM Interconnection, L.L.C.; Notice of
Institution of Proceeding and Refund
Effective Date
July 7, 2005.
On July 6, 2005, the Commission
issued an order that instituted a
proceeding in Docket No. EL05–127–
000, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C.
824e, concerning the continued justness
and reasonableness of PJM
Interconnection, L.L.C.’s previouslyaccepted rate filing with respect to the
behind-the-meter generation netting
program. PJM Interconnection, L.L.C.,
112 FERC ¶ 61,034 (2005).
The refund effective date in Docket
No. EL05–127–000, established
pursuant to section 206(b) of the FPA,
will be 60 days from the date of
E:\FR\FM\03AUN1.SGM
03AUN1
Federal Register / Vol. 70, No. 148 / Wednesday, August 3, 2005 / Notices
publication of this notice in the Federal
Register.
Magalie R. Salas,
Secretary.
[FR Doc. 05–15385 Filed 8–2–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP05–467–000]
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Questar Pipeline Company; Notice of
Tariff Filing
Magalie R. Salas,
Secretary.
[FR Doc. 05–15390 Filed 8–2–05; 8:45 am]
July 7, 2005.
44611
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E5–4176 Filed 8–2–05; 8:45 am]
BILLING CODE 6717–01–P
Take notice that on July 1, 2005,
Questar Pipeline Company (Questar)
tendered for filing has part of its FERC
Gas Tariff, First Revised Volume No. 1,
the following tariff sheets, with an
effective date of August 1, 2005:
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Second Revised Sheet No. 1C
Seventh Revised Sheet No. 164
First Revised Sheet Nos. 179A and 179E
Second Revised Sheet No. 179I
Questar states that copies of this filing
were served upon Questar’s customers,
the Public Service Commission of Utah
and the Public Service Commission of
Wyoming.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
[Docket No. RP99–513–001]
[Docket No. RP05–401–002]
July 29, 2005.
VerDate jul<14>2003
15:22 Aug 02, 2005
Jkt 205001
BILLING CODE 6717–01–P
Questar Pipeline Company; Notice of
Compliance Filing
Take notice that on July 22, 2005,
Questar Pipeline Company (Questar),
tendered for filing as part of its FERC
Gas Tariff, First Revised Volume No. 1,
Substitute Fifth Revised Sheet No. 31, to
be effective July 25, 2005.
Questar states that copies of this filing
were served upon Questar’s customers,
the Public Service Commission of Utah
and the Public Service Commission of
Wyoming.
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed in
accordance with the provisions of
Section 154.210 of the Commission’s
regulations (18 CFR 154.210). Anyone
filing a protest must serve a copy of that
document on all the parties to the
proceeding.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
PO 00000
Frm 00059
Fmt 4703
Sfmt 4703
Questar Pipeline Company; Notice of
Negotated Rates
July 29, 2005.
Take notice that on July 22, 2005,
Questar Pipeline Company (Questar)
tendered for filing as part of its FERC
Gas Tariff, First Revised Volume No. 1,
ThirtySeventh Revised Sheet No. 7 and
Ninth Revised Sheet No. 7A, with an
effective date of July 22, 2005.
Questar states that this filing
proposed to revise contract terms for
two negotiated-rate contracts and a
footnote has been rewritten for clarity.
Questar states that a copy of this filing
has been served upon all parties to this
proceeding, Questar’s customers, the
Public Service Commission of Utah and
the Public Service Commission of
Wyoming.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
E:\FR\FM\03AUN1.SGM
03AUN1
Agencies
[Federal Register Volume 70, Number 148 (Wednesday, August 3, 2005)]
[Notices]
[Pages 44610-44611]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-15385]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL05-127-000]
PJM Interconnection, L.L.C.; Notice of Institution of Proceeding
and Refund Effective Date
July 7, 2005.
On July 6, 2005, the Commission issued an order that instituted a
proceeding in Docket No. EL05-127-000, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C. 824e, concerning the continued
justness and reasonableness of PJM Interconnection, L.L.C.'s
previously-accepted rate filing with respect to the behind-the-meter
generation netting program. PJM Interconnection, L.L.C., 112 FERC ]
61,034 (2005).
The refund effective date in Docket No. EL05-127-000, established
pursuant to section 206(b) of the FPA, will be 60 days from the date of
[[Page 44611]]
publication of this notice in the Federal Register.
Magalie R. Salas,
Secretary.
[FR Doc. 05-15385 Filed 8-2-05; 8:45 am]