PSEG Nuclear LLC, Hope Creek Generating Station; Notice of Consideration of Approval of Transfer of Facility Operating License and Conforming Amendment and Opportunity for a Hearing, 44398-44399 [E5-4103]
Download as PDF
44398
Federal Register / Vol. 70, No. 147 / Tuesday, August 2, 2005 / Notices
license transfer application, are
discussed below.
Within 20 days of the date of
publication of this notice, any person
whose interest may be affected by the
Commission’s action on the application
may request a hearing and, if not the
applicant, may petition for leave to
intervene in a hearing proceeding on the
Commission’s action. Requests for a
hearing and petitions for leave to
intervene should be filed in accordance
with the Commission’s rules of practice
set forth in Subpart C ‘‘Rules of General
Applicability: Hearing Requests,
Petitions to Intervene, Availability of
Documents, Selection of Specific
Hearing Procedures, Presiding Officer
Powers, and General Hearing
Management for NRC Adjudicatory
Hearings,’’ of 10 CFR Part 2. In
particular, such requests and petitions
must comply with the requirements set
forth in 10 CFR 2.309. Untimely
requests and petitions may be denied, as
provided in 10 CFR 2.309(c)(1), unless
good cause for failure to file on time is
established. In addition, an untimely
request or petition should address the
factors that the Commission will also
consider, in reviewing untimely
requests or petitions, set forth in 10 CFR
2.309(c)(1)(i)–(viii).
Requests for a hearing and petitions
for leave to intervene should be served,
pursuant to 10 CFR 2.302 and 2.305,
upon Thomas S. O’Neill, Vice President
and Counsel, Exelon Nuclear, 4300
Winfield Road, Warrenville, Illinois
60555, telephone 630-657-3770, fax 630657-4335, and e-mail
thomas.oneill@exeloncorp.com; Jeffrie J.
Keenan, Esq., PSEG Nuclear LLC, P. O.
Box 236, N–21, Hancocks Bridge, New
Jersey 08038, telephone 856-339-5429,
fax 856-339-1234, and e-mail
jeff.keenan@pseg.com; the General
Counsel, NRC, Washington, DC 205550001, e-mail address for filings
regarding license transfer cases only:
OGCLT@NRC.gov; and the Secretary of
the Commission, NRC, Washington, DC
20555-0001, Attention: Rulemakings
and Adjudications Staff.
The Commission will issue a notice or
order granting or denying a hearing
request or intervention petition,
designating the issues for any hearing
that will be held, and designating the
Presiding Officer. A notice granting a
hearing will be published in the Federal
Register and served on the parties to the
hearing.
As an alternative to requests for
hearing and petitions to intervene,
within 30 days after the date of
publication of this notice, persons may
submit written comments regarding the
license transfer application, as provided
VerDate jul<14>2003
17:21 Aug 01, 2005
Jkt 205001
for in 10 CFR 2.1305. The Commission
will consider and, if appropriate,
respond to these comments, but such
comments will not otherwise constitute
part of the decisional record. Comments
should be submitted to the Secretary,
NRC, Washington, DC 20555-0001,
Attention: Rulemakings and
Adjudications Staff, and should cite the
publication date and page number of
this Federal Register notice.
For further details with respect to this
action, see the application dated March
4, 2005, (ML050750110) available for
public inspection at the Commission’s
Public Document Room (PDR), located
at One White Flint North, Public File
Area O1 F21, 11555 Rockville Pike (first
floor), Rockville, Maryland. Publicly
available records will be accessible
electronically from the Agencywide
Documents Access and Management
System’s (ADAMS) Public Electronic
Reading Room on the Internet at the
NRC Web site, https://www.nrc.gov/
reading-rm/adams.html. Persons who
do not have access to ADAMS or who
encounter problems in accessing the
documents located in ADAMS, should
contact the NRC PDR Reference staff by
telephone at 1-800-397-4209, 301-4154737 or by e-mail to pdr@nrc.gov.
Dated at Rockville, Maryland this 26th day
of July 2005.
For the Nuclear Regulatory Commission.
Stewart N. Bailey,
Senior Project Manager, Section 2, Project
Directorate I, Division of Licensing Project
Management, Office of Nuclear Reactor
Regulation.
[FR Doc. E5–4101 Filed 8–1–05; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 50–354]
PSEG Nuclear LLC, Hope Creek
Generating Station; Notice of
Consideration of Approval of Transfer
of Facility Operating License and
Conforming Amendment and
Opportunity for a Hearing
The Nuclear Regulatory Commission
(NRC or the Commission) is considering
the issuance of an order under title 10
of the Code of Federal Regulations (10
CFR) section 50.80 approving the
transfer of Facility Operating License
No. NPF–57 for the Hope Creek
Generating Station (Hope Creek)
currently held by PSEG Nuclear LLC
(PSEG), as owner and licensed operator
of Hope Creek to Exelon Generation
Company, LLC (Exelon). The transfer of
PSEG’s ownership interests and
PO 00000
Frm 00076
Fmt 4703
Sfmt 4703
operating authority to Exelon is part of
the proposed merger of PSEG’s parent
corporation, Public Service Enterprise
Group, into Exelon Corporation, the
indirect parent company of Exelon. The
Commission is also considering
amending the license for administrative
purposes to reflect the proposed
transfer.
According to an application for
approval filed by PSEG, Exelon would
assume title to the facility following
approval of the proposed license
transfer, and would be responsible for
the operation, maintenance, and
eventual decommissioning of Hope
Creek. No physical changes to the Hope
Creek facility or operational changes are
being proposed in the application.
The proposed amendment would
replace references to PSEG in the
license with references to Exelon to
reflect the proposed transfer.
Pursuant to 10 CFR 50.80, no license,
or any right thereunder, shall be
transferred, directly or indirectly,
through transfer of control of the
license, unless the Commission shall
give its consent in writing. The
Commission will approve an
application for the transfer of a license,
if the Commission determines that the
proposed transferee is qualified to hold
the license, and that the transfer is
otherwise consistent with applicable
provisions of law, regulations, and
orders issued by the Commission
pursuant thereto.
Before issuance of the proposed
conforming license amendment, the
Commission will have made findings
required by the Atomic Energy Act of
1954, as amended (the Act), and the
Commission’s regulations.
As provided in 10 CFR 2.1315, unless
otherwise determined by the
Commission with regard to a specific
application, the Commission has
determined that any amendment to the
license of a utilization facility which
does no more than conform the license
to reflect the transfer action involves no
significant hazards consideration. No
contrary determination has been made
with respect to this specific license
amendment application. In light of the
generic determination reflected in 10
CFR 2.1315, no public comments with
respect to significant hazards
considerations are being solicited,
notwithstanding the general comment
procedures contained in 10 CFR 50.91.
The filing of requests for hearing and
petitions for leave to intervene, and
written comments with regard to the
license transfer application, are
discussed below.
Within 20 days of the date of
publication of this notice, any person
E:\FR\FM\02AUN1.SGM
02AUN1
Federal Register / Vol. 70, No. 147 / Tuesday, August 2, 2005 / Notices
whose interest may be affected by the
Commission’s action on the application
may request a hearing and, if not the
applicant, may petition for leave to
intervene in a hearing proceeding on the
Commission’s action. Requests for a
hearing and petitions for leave to
intervene should be filed in accordance
with the Commission’s rules of practice
set forth in subpart C ‘‘Rules of General
Applicability: Hearing Requests,
Petitions to Intervene, Availability of
Documents, Selection of Specific
Hearing Procedures, Presiding Officer
Powers, and General Hearing
Management for NRC Adjudicatory
Hearings,’’ of 10 CFR part 2. In
particular, such requests and petitions
must comply with the requirements set
forth in 10 CFR 2.309. Untimely
requests and petitions may be denied, as
provided in 10 CFR 2.309(c)(1), unless
good cause for failure to file on time is
established. In addition, an untimely
request or petition should address the
factors that the Commission will also
consider, in reviewing untimely
requests or petitions, set forth in 10 CFR
2.309(c)(1)(I)–(viii).
Requests for a hearing and petitions
for leave to intervene should be served,
pursuant to 10 CFR 2.302 and 2.305,
upon Thomas S. O’Neill, Vice President
and Counsel, Exelon Nuclear, 4300
Winfield Road, Warrenville, Illinois
60555, telephone 630–657–3770, fax
630–657–4335, and e-mail
thomas.oneill@exeloncorp.com; Jeffrie J.
Keenan, Esq., PSEG Nuclear LLC, P.O.
Box 236, –21, Hancocks Bridge, New
Jersey 08038, telephone 856–339–5429,
fax 856–339–7–1234, and e-mail
jeff.keenan@pseg.com; the General
Counsel, NRC, Washington, DC 205550001 e-mail address for filings regarding
license transfer cases only:
OGCLT@NRC.gov; and the Secretary of
the Commission, NRC, Washington, DC
20555–0001, Attention: Rulemakings
and Adjudications Staff.
The Commission will issue a notice or
order granting or denying a hearing
request or intervention petition,
designating the issues for any hearing
that will be held, and designating the
Presiding Officer. A notice granting a
hearing will be published in the Federal
Register and served on the parties to the
hearing.
As an alternative to requests for
hearing and petitions to intervene,
within 30 days after the date of
publication of this notice, persons may
submit written comments regarding the
license transfer application, as provided
for in 10 CFR 2.1305. The Commission
will consider and, if appropriate,
respond to these comments, but such
comments will not otherwise constitute
VerDate jul<14>2003
17:21 Aug 01, 2005
Jkt 205001
part of the decisional record. Comments
should be submitted to the Secretary,
NRC, Washington, DC 20555–0001,
Attention: Rulemakings and
Adjudications Staff, and should cite the
publication date and page number of
this Federal Register notice.
For further details with respect to this
action, see the application dated March
4, 2005, (ML050750110), available for
public inspection at the Commission’s
Public Document Room (PDR), located
at One White Flint North, Public File
Area O1 F21, 11555 Rockville Pike (first
floor), Rockville, Maryland. Publicly
available records will be accessible
electronically from the Agencywide
Documents Access and Management
System’s (ADAMS) Public Electronic
Reading Room on the Internet at the
NRC Web site, https://www.nrc.gov/
reading-rm/adams.html. Persons who
do not have access to ADAMS or who
encounter problems in accessing the
documents located in ADAMS, should
contact the NRC PDR Reference staff by
telephone at 1–800–397–4209, 301–
415–4737 or by e-mail to pdr@nrc.gov.
Dated at Rockville, Maryland this 26th day
of July 2005.
For the Nuclear Regulatory Commission.
Stewart N. Bailey,
Senior Project Manager, Section 2, Project
Directorate I, Division of Licensing Project
Management, Office of Nuclear Reactor
Regulation.
[FR Doc. E5–4103 Filed 8–1–05; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
Sunshine Federal Register Notice
Nuclear
Regulatory Commission
DATE: Weeks of August 1, 8, 15, 22, 29,
and September 5, 2005.
PLACE: Commissioners’ Conference
Room, 11555 Rockville Pike, Rockville,
Maryland.
STATUS: Public and closed.
MATTERS TO BE CONSIDERED:
AGENCY HOLDING THE MEETING:
Week of August 1, 2005
Thursday, August 4, 2005
1:30 p.m. Affirmation Session (Public
Meeting) (Tentative).
Week of August 8, 2005—Tentative
There are no meetings scheduled for
the Week of August 8, 2005.
a. Dominion Nuclear Connecticut, Inc.
(Millstone Nuclear Power Station,
Units 2 and 3), Docket Nos. 50–
336–LR and 50–423–LR (Tentative).
PO 00000
Frm 00077
Fmt 4703
Sfmt 4703
44399
Week of August 15, 2005—Tentative
Tuesday, August 16, 2005
10 a.m. Meeting with the Organization
of Agreement States (OAS) and the
Conference of Radiation Control
Program Directors (CRCPD) (Public
Meeting) (Contact: Shawn Smith,
301–415–2620).
This meeting will be webcast live at
the Web address—https://www/nrc.gov.
1 p.m. Discussion of Security Issues
(Closed-Ex. 3—9).
Week of August 22, 2005—Tentative
There are no meetings scheduled for
the Week of August 22, 2005.
Week of August 29, 2005—Tentative
There are no meetings scheduled for
the Week of August 29, 2005.
Week of September 5, 2005—Tentative
Wednesday, September 7, 2005
9:30 a.m. Discussion of Security Issues
(Closed—Ex. 1).
1:30 p.m. Discussion of Security Issues
(Closed—Ex. 3).
*The schedule for Commission
meetings is subject to change on short
notice. To verify the status of meetings
call (recording)—(301) 415–1292.
Contact person for more information:
David Gamberoni, (301) 415–1651.
*
*
*
*
*
The NRC Commission Meeting
Schedule can be found on the Internet
at: https://www.nrc.gov/what-we-do/
policy-making/schedule.html.
*
*
*
*
*
The NRC provides reasonable
accommodation to individuals with
disabilities where appropriate. If you
need a reasonable accommodation to
participate in these public meetings, or
need this meeting notice or the
transcript or other information from the
public meetings in another format (e.g.
braille, large print), please notify the
NRC’s Disability Program Coordinator,
August Spector, at 301–415–7080, TDD:
301–415–2100, or by e-mail at
aks@nrc.gov. Determinations on
requests for reasonable accommodation
will be made on a case-by-case basis.
*
*
*
*
*
This notice is distributed by mail to
several hundred subscribers; if you no
longer wish to receive it, or would like
to be added to the distribution, please
contact the Office of the Secretary,
Washington, DC 20555. (301–415–1969).
In addition, distribution of this meeting
notice over the Internet system is
available. If you are interested in
receiving this Commission meeting
schedule electronically, please send an
electronic message to dkw@nrc.gov.
E:\FR\FM\02AUN1.SGM
02AUN1
Agencies
[Federal Register Volume 70, Number 147 (Tuesday, August 2, 2005)]
[Notices]
[Pages 44398-44399]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-4103]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-354]
PSEG Nuclear LLC, Hope Creek Generating Station; Notice of
Consideration of Approval of Transfer of Facility Operating License and
Conforming Amendment and Opportunity for a Hearing
The Nuclear Regulatory Commission (NRC or the Commission) is
considering the issuance of an order under title 10 of the Code of
Federal Regulations (10 CFR) section 50.80 approving the transfer of
Facility Operating License No. NPF-57 for the Hope Creek Generating
Station (Hope Creek) currently held by PSEG Nuclear LLC (PSEG), as
owner and licensed operator of Hope Creek to Exelon Generation Company,
LLC (Exelon). The transfer of PSEG's ownership interests and operating
authority to Exelon is part of the proposed merger of PSEG's parent
corporation, Public Service Enterprise Group, into Exelon Corporation,
the indirect parent company of Exelon. The Commission is also
considering amending the license for administrative purposes to reflect
the proposed transfer.
According to an application for approval filed by PSEG, Exelon
would assume title to the facility following approval of the proposed
license transfer, and would be responsible for the operation,
maintenance, and eventual decommissioning of Hope Creek. No physical
changes to the Hope Creek facility or operational changes are being
proposed in the application.
The proposed amendment would replace references to PSEG in the
license with references to Exelon to reflect the proposed transfer.
Pursuant to 10 CFR 50.80, no license, or any right thereunder,
shall be transferred, directly or indirectly, through transfer of
control of the license, unless the Commission shall give its consent in
writing. The Commission will approve an application for the transfer of
a license, if the Commission determines that the proposed transferee is
qualified to hold the license, and that the transfer is otherwise
consistent with applicable provisions of law, regulations, and orders
issued by the Commission pursuant thereto.
Before issuance of the proposed conforming license amendment, the
Commission will have made findings required by the Atomic Energy Act of
1954, as amended (the Act), and the Commission's regulations.
As provided in 10 CFR 2.1315, unless otherwise determined by the
Commission with regard to a specific application, the Commission has
determined that any amendment to the license of a utilization facility
which does no more than conform the license to reflect the transfer
action involves no significant hazards consideration. No contrary
determination has been made with respect to this specific license
amendment application. In light of the generic determination reflected
in 10 CFR 2.1315, no public comments with respect to significant
hazards considerations are being solicited, notwithstanding the general
comment procedures contained in 10 CFR 50.91.
The filing of requests for hearing and petitions for leave to
intervene, and written comments with regard to the license transfer
application, are discussed below.
Within 20 days of the date of publication of this notice, any
person
[[Page 44399]]
whose interest may be affected by the Commission's action on the
application may request a hearing and, if not the applicant, may
petition for leave to intervene in a hearing proceeding on the
Commission's action. Requests for a hearing and petitions for leave to
intervene should be filed in accordance with the Commission's rules of
practice set forth in subpart C ``Rules of General Applicability:
Hearing Requests, Petitions to Intervene, Availability of Documents,
Selection of Specific Hearing Procedures, Presiding Officer Powers, and
General Hearing Management for NRC Adjudicatory Hearings,'' of 10 CFR
part 2. In particular, such requests and petitions must comply with the
requirements set forth in 10 CFR 2.309. Untimely requests and petitions
may be denied, as provided in 10 CFR 2.309(c)(1), unless good cause for
failure to file on time is established. In addition, an untimely
request or petition should address the factors that the Commission will
also consider, in reviewing untimely requests or petitions, set forth
in 10 CFR 2.309(c)(1)(I)-(viii).
Requests for a hearing and petitions for leave to intervene should
be served, pursuant to 10 CFR 2.302 and 2.305, upon Thomas S. O'Neill,
Vice President and Counsel, Exelon Nuclear, 4300 Winfield Road,
Warrenville, Illinois 60555, telephone 630-657-3770, fax 630-657-4335,
and e-mail thomas.oneill@exeloncorp.com; Jeffrie J. Keenan, Esq., PSEG
Nuclear LLC, P.O. Box 236, -21, Hancocks Bridge, New Jersey 08038,
telephone 856-339-5429, fax 856-339-7-1234, and e-mail
jeff.keenan@pseg.com; the General Counsel, NRC, Washington, DC 20555-
0001 e-mail address for filings regarding license transfer cases only:
OGCLT@NRC.gov; and the Secretary of the Commission, NRC, Washington, DC
20555-0001, Attention: Rulemakings and Adjudications Staff.
The Commission will issue a notice or order granting or denying a
hearing request or intervention petition, designating the issues for
any hearing that will be held, and designating the Presiding Officer. A
notice granting a hearing will be published in the Federal Register and
served on the parties to the hearing.
As an alternative to requests for hearing and petitions to
intervene, within 30 days after the date of publication of this notice,
persons may submit written comments regarding the license transfer
application, as provided for in 10 CFR 2.1305. The Commission will
consider and, if appropriate, respond to these comments, but such
comments will not otherwise constitute part of the decisional record.
Comments should be submitted to the Secretary, NRC, Washington, DC
20555-0001, Attention: Rulemakings and Adjudications Staff, and should
cite the publication date and page number of this Federal Register
notice.
For further details with respect to this action, see the
application dated March 4, 2005, (ML050750110), available for public
inspection at the Commission's Public Document Room (PDR), located at
One White Flint North, Public File Area O1 F21, 11555 Rockville Pike
(first floor), Rockville, Maryland. Publicly available records will be
accessible electronically from the Agencywide Documents Access and
Management System's (ADAMS) Public Electronic Reading Room on the
Internet at the NRC Web site, https://www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to ADAMS or who encounter problems in
accessing the documents located in ADAMS, should contact the NRC PDR
Reference staff by telephone at 1-800-397-4209, 301-415-4737 or by e-
mail to pdr@nrc.gov.
Dated at Rockville, Maryland this 26th day of July 2005.
For the Nuclear Regulatory Commission.
Stewart N. Bailey,
Senior Project Manager, Section 2, Project Directorate I, Division of
Licensing Project Management, Office of Nuclear Reactor Regulation.