Golden Pass LNG Terminal L.P. , Golden Pass Pipeline L.P.; Notice of Availability of The Final Conformity Determination for the Golden Pass LNG Terminal And Pipeline Project, 43855 [E5-4069]

Download as PDF Federal Register / Vol. 70, No. 145 / Friday, July 29, 2005 / Notices Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on August 17, 2005. Magalie R. Salas, Secretary. [FR Doc. E5–4053 Filed 7–28–05; 8:45 am] BILLING CODE 6717–01–P Federal Energy Regulatory Commission [Docket Nos. CP04–386–000, CP04–400– 000, CP04–401–000, and CP04–402–000] Golden Pass LNG Terminal L.P. and Golden Pass Pipeline L.P.; Notice of Availability of the Final Conformity Determination for the Golden Pass LNG Terminal and Pipeline Project July 20, 2005. The staff of the Federal Energy Regulatory Commission has prepared a Final General Conformity Determination to assess the potential air quality impacts associated with the construction and operation of a liquefied natural gas (LNG) import terminal and natural gas pipeline proposed by Golden Pass LNG Terminal, L.P. (Golden Pass LNG) and VerDate jul<14>2003 17:05 Jul 28, 2005 Golden Pass Pipeline, L.P. (Golden Pass Pipeline) referred to as the Golden Pass LNG Terminal and Pipeline Project, in the above-referenced dockets. This Final General Conformity Determination was prepared to satisfy the requirements of the Clean Air Act. Additional information about the project is available from the Commission’s Office of External Affairs, at 1–866–208–FERC or on the FERC Internet Web site (https://www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number excluding the last three digits in the Docket Number field. Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, contact (202) 502–8659. the last three digits in the Docket Number field. Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, contact (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E5–4046 Filed 7–28–05; 8:45 am] Golden Pass LNG Terminal L.P. , Golden Pass Pipeline L.P.; Notice of Availability of The Final Conformity Determination for the Golden Pass LNG Terminal And Pipeline Project BILLING CODE 6717–01–P Jkt 205001 Federal Energy Regulatory Commission [Docket Nos. CP04–386–000, CP04–400– 000, CP04–401–000, and CP04–402–000] Golden Pass LNG Terminal L.P.; Notice of Availability of The Final Conformity Determination for The Golden Pass Lng Terminal and Pipeline Project Golden Pass Pipeline L.P. The staff of the Federal Energy Regulatory Commission has prepared a Final General Conformity Determination to assess the potential air quality impacts associated with the construction and operation of a liquefied natural gas (LNG) import terminal and natural gas pipeline proposed by Golden Pass LNG Terminal, L.P. (Golden Pass LNG) and Golden Pass Pipeline, L.P. (Golden Pass Pipeline) referred to as the Golden Pass LNG Terminal and Pipeline Project, in the above-referenced dockets. This Final General Conformity Determination was prepared to satisfy the requirements of the Clean Air Act. Additional information about the project is available from the Commission’s Office of External Affairs, at 1–866–208–FERC or on the FERC Internet website (https://www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number excluding PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 Magalie R. Salas, Secretary. [FR Doc. E5–4049 Filed 7–28–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. CP04–386–000, Docket Nos. CP04–400–000, CP04–401–000, and CP04– 402–000] July 20, 2005. DEPARTMENT OF ENERGY July 22, 2005. DEPARTMENT OF ENERGY 43855 The staff of the Federal Energy Regulatory Commission has prepared a Final General Conformity Determination to assess the potential air quality impacts associated with the construction and operation of a liquefied natural gas (LNG) import terminal and natural gas pipeline proposed by Golden Pass LNG Terminal, L.P. (Golden Pass LNG) and Golden Pass Pipeline, L.P. (Golden Pass Pipeline) referred to as the Golden Pass LNG Terminal and Pipeline Project, in the above-referenced dockets. This Final General Conformity Determination was prepared to satisfy the requirements of the Clean Air Act. Additional information about the project is available from the Commission’s Office of External Affairs, at 1–866–208–FERC or on the FERC Internet website (https://www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number excluding the last three digits in the Docket Number field. Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, contact (202)502–8659. Magalie R. Salas, Secretary. [FR Doc. E5–4069 Filed 7–28–05; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\29JYN1.SGM 29JYN1

Agencies

[Federal Register Volume 70, Number 145 (Friday, July 29, 2005)]
[Notices]
[Page 43855]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-4069]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. CP04-386-000, Docket Nos. CP04-400-000, CP04-401-000, and 
CP04-402-000]


Golden Pass LNG Terminal L.P. , Golden Pass Pipeline L.P.; Notice 
of Availability of The Final Conformity Determination for the Golden 
Pass LNG Terminal And Pipeline Project

July 20, 2005.
    The staff of the Federal Energy Regulatory Commission has prepared 
a Final General Conformity Determination to assess the potential air 
quality impacts associated with the construction and operation of a 
liquefied natural gas (LNG) import terminal and natural gas pipeline 
proposed by Golden Pass LNG Terminal, L.P. (Golden Pass LNG) and Golden 
Pass Pipeline, L.P. (Golden Pass Pipeline) referred to as the Golden 
Pass LNG Terminal and Pipeline Project, in the above-referenced 
dockets.
    This Final General Conformity Determination was prepared to satisfy 
the requirements of the Clean Air Act.
    Additional information about the project is available from the 
Commission's Office of External Affairs, at 1-866-208-FERC or on the 
FERC Internet website (https://www.ferc.gov) using the eLibrary link. 
Click on the eLibrary link, click on ``General Search'' and enter the 
docket number excluding the last three digits in the Docket Number 
field. Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY, 
contact (202)502-8659.

Magalie R. Salas,
Secretary.
[FR Doc. E5-4069 Filed 7-28-05; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.