Portland General Electric Company, Portland, OR; Notice of Filing, 42315 [E5-3924]

Download as PDF Federal Register / Vol. 70, No. 140 / Friday, July 22, 2005 / Notices encourages electronic filings. For assistance, please contact FERC Online Support. q. At this time, the Commission intends to prepare an Environmental Assessment for the project, in accordance with the National Environmental Policy Act. r. Scoping Meetings: Commission staff will hold two scoping meetings at the time and place noted below. We invite all interested individuals, organizations, and agencies to attend one or both meetings, and to assist staff in identifying particular study needs, as well as the scope of environmental issues to be addressed in the environmental document. The times and locations of these meetings are as follows: Scoping Meeting #1 Date and Time: August 16, 2005 from 7 to 9 p.m. Location: Valdez Convention and Civic Center, 110 Clifton Drive, Valdez, Alaska. Phone: (907) 835–4440. resource management objectives; (3) review and discuss existing information and identify preliminary information and study needs; (4) review and discuss the process plan and schedule for prefiling activities that incorporates the time frames provided for in part 5 of the Commission’s regulations and, to the extent possible, maximizes coordination of Federal, State, and tribal permitting and certification processes; and (5) discuss the appropriateness of any Federal or State agency or Indian tribe acting as a cooperating agency for development of our environmental document. Meeting Procedures The scoping meetings will be recorded by a court reporter and all statements, oral and written, will become part of the Commission’s official public record for this project. Magalie R. Salas, Secretary. [FR Doc. E5–3923 Filed 7–21–05; 8:45 am] BILLING CODE 6717–01–P Date and Time:August 17, 2005 at 1 to 5 p.m. Location: Hawthorn Suites Hotel, 1110 West 8th Ave., Anchorage, Alaska. Phone: (907) 222–5005. The scoping meetings are posted on the Commission’s calendar, located on the internet at https://www.ferc.gov/ EventCalendar/EventsList.aspx, along with other related information. Site Visit Green Power Development will conduct a site visit of the project on August 16, 2005, beginning at 1 p.m. Participants should be prepared to provide their own ground transportation. Drive from the town of Valdez on Dayville Road, traveling toward the Valdez Marine Terminal. Meet at the parking area on the left side of Dayville Road immediately before crossing the bridge over Allison Creek. From the parking lot participants will travel on foot to the proposed powerhouse site. Weather permitting, we will tour the water intake and dam sites at Allison Lake by aerial fly over. Anyone with questions about the site visit should contact Joel Groves of Green Power Development at (907) 258–2420. Those individuals planning to participate should notify Mr. Groves of their intent, before August 3, 2005. Meeting Objectives At the scoping meetings, staff will: (1) Initiate scoping of the issues; (2) review and discuss existing conditions and 19:28 Jul 21, 2005 Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e- mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on August 17, 2005. Magalie R. Salas, Secretary. [FR Doc. E5–3922 Filed 7–21–05; 8:45 am] BILLING CODE 6717–01–P Scoping Meeting #2 VerDate jul<14>2003 42315 Jkt 205001 DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket No. ID4348–000] Mr. Philip R. Lochner, Jr.; Notice of Filing July 18, 2005. Take notice that on June 20, 2005, Mr. Philip R. Lochner, Jr., filed an application for authorization under section 205(b) of the Federal Power Act to hold interlocking positions as Director of Consumers Energy Company and as Director of CLARCOR Inc. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 [P–2195–011] Portland General Electric Company, Portland, OR; Notice of Filing July 18, 2005. Take notice that the following person has been assigned to facilitate discussions among parties involved in the licensing of Portland General Electric Company’s Clackamas hydroelectric project. Project impacts to salmonid species, water quality and related issues will be topics discussed. Office of Energy Projects Jim Hastreiter, (503) 552–2760. The staff person listed above is separated from the advisory staff in this proceeding and will not participate as advisory staff in this proceeding. Magalie R. Salas, Secretary. [FR Doc. E5–3924 Filed 7–21–05; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\22JYN1.SGM 22JYN1

Agencies

[Federal Register Volume 70, Number 140 (Friday, July 22, 2005)]
[Notices]
[Page 42315]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-3924]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[P-2195-011]


Portland General Electric Company, Portland, OR; Notice of Filing

July 18, 2005.
    Take notice that the following person has been assigned to 
facilitate discussions among parties involved in the licensing of 
Portland General Electric Company's Clackamas hydroelectric project. 
Project impacts to salmonid species, water quality and related issues 
will be topics discussed.

Office of Energy Projects

    Jim Hastreiter, (503) 552-2760.
    The staff person listed above is separated from the advisory staff 
in this proceeding and will not participate as advisory staff in this 
proceeding.

Magalie R. Salas,
Secretary.
[FR Doc. E5-3924 Filed 7-21-05; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.