Environmental Impacts Statements; Notice of Availability, 42318 [05-14546]
Download as PDF
42318
Federal Register / Vol. 70, No. 140 / Friday, July 22, 2005 / Notices
and publicly owned and operated
facilities. This is not an exhaustive list;
it is only intended to provide a
framework to consider potential
nominees.
Nomination of a Member: Any
interested person or organization may
nominate qualified individuals for
membership to the WGPE. Name,
occupation, position, address, and
telephone number should identify all
nominees. To be considered, all
nominations must include a current
resume providing the nominee’s
background, experience, and
qualifications, in addition to a statement
(not to exceed two (2) paragraphs) about
their particular expertise and interest in
the public education requirements of
the Lead and Copper Rule. Please note
that the Agency will not formally
acknowledge or respond to
nominations.
Dated: July 18, 2005.
Cynthia C. Dougherty,
Director, Office of Ground Water and Drinking
Water.
[FR Doc. 05–14536 Filed 7–21–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6665–5]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 07/11/2005 through 07/15/2005
Pursuant to 40 CFR 1506.9.
EIS No. 20050290, Final EIS, NOA, AK,
Pribilof Islands Setting for the Annual
Subsistence Harvest of Northern Fur
Seals, To Determine and Publish the
Take Ranges, Pribilof Islands, AK,
Wait Period Ends: 08/22/2005,
Contact: James W. Balsiger 301–713–
3318.
EIS No. 20050291, Final EIS, AFS, CO,
Gold Camp Road Plan, Develop a
Feasible Plan to Manage the
Operation of Tunnel #3 and the 8.5
mile Road Segment, Pike National
Forest, Pikes Peak Ranger District,
Colorado Springs, El Paso County,
CO, Wait Period Ends: 08/22/2005,
Contact: Frank Landis 719–477–4203.
EIS No. 20050292, Draft EIS, USA, HI,
Makua Military Reservation (MMR)
Project, Proposed Military Training
Activities, 25th Infantry Division
(Light) and U.S. Army, HI, Comment
VerDate jul<14>2003
19:28 Jul 21, 2005
Jkt 205001
Period Ends: 09/21/2005, Contact:
Gary Shirakata 808–438–0772.
EIS No. 20050293, Draft EIS, WPA, AZ,
Wellton-Mohawk Generating Facility
Project, Construction and Operation a
Natural Gas-Fired, Combined-Cycle,
Electric Generating Stations, Approval
for Right-of-Way, Yuma County, AZ,
Comment Period Ends: 09/06/2005,
Contact: Mark J. Wieringa 720–962–
7448.
EIS No. 20050294, Revised Draft EIS,
COE, CA, Mare Island Reuse of
Dredged Material Disposal Ponds as a
Confirmed Updated Dredged Material
Disposal Facility, Issuing Section 404
Permit Clean Water Act and Section
10 Permit Rivers and Harbor Act, San
Francisco Bay Area, City of Vallejo,
Solando County, CA, Error: Revised
Draft EIS 09/06/2005, Contact: Robert
J. Lawrence 415–977–8020.
EIS No. 20050295, Draft EIS, AFS, CA,
Bald Mountain Project, Proposes to
Harvest Trees Using Group and
Individual Trees Selection Methods,
Feather River Ranger District, Plumas
National Forest, Plumas and Butte
Counties, CA, Comment Period Ends:
09/06/2005, Contact: Katherine Worn
530–534–6500.
EIS No. 20050296, Final EIS, TVA, TN,
500–kV Transmission Lin in Middle
Tennessee Construction and
Operation, Cumberland Fossil Plant to
either the Montgomery 500–kV
Substation, Montgomery County, or
the Davidson 500–kV Substation,
Davidson County, Stewart, Houston,
Montgomery, Dickerson, Cheatham
and Davidson Counties, TN, Wait
Period Ends: 08/22/2005, Contact:
Charles P. Nicholson 865–632–3582.
EIS No. 20050297, Draft EIS, SFW, WY,
Bison and Elk Management Plan,
Implementation, National Elk Refuge/
Grand Teton National Park/John D.
Rockefeller, Jr. Memorial Parkway,
Teton County, WY, Comment Period
Ends: 09/30/2005, Contact: Laurie
Shannon 303–236–4317.
EIS No. 20050298, Draft EIS, AFS, UT,
West Bear Vegetation Management
Project, Timber Harvesting, Prescribed
Burning, Roads Construction,
Township 1 North, Range 9 East, Salt
Lake Principle Meridian, Evanston
Ranger District, Wasatch-Cache
National Forest, Summit County, UT,
Comment Period Ends: 09/06/2005,
Contact: Larry Johnson 307–789–
3194.
EIS No. 20050299, Draft EIS, SFW, CA,
San Diego Bay National Wildlife
Refuge Comprehensive Conservation
Plan, Implementation, Sweetwater
Marsh and South San Diego Bay
Units, San Diego County, CA,
Comment Period Ends: 09/19/2005,
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
Contact: Victoria Touchstone 760–
431–9440 Ex. 349.
EIS No. 20050300, Draft Supplemental
EIS, NOA, 00, Reef Fish (Amendment
25) and Coastal Migatory Pelagic
(CMP) (Amendment 17) Fishery
Management Plans (FMP) for
Extending the Charter Vessel/
Headboat Permit Moratorium, Gulf of
Mexico, Comment Period Ends: 09/
06/2005, Contact: Andy Strelcheck
727–824–5305.
Dated: July 19, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 05–14546 Filed 7–21–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6665–6]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7167. An explanation of the
ratings assigned to draft environmental
impact statements (EISs) was published
in the Federal Register dated April 1,
2005 (70 FR 16815).
Draft EISs
EIS No. 20040548, ERP No. D–BLM–
J65432–CO, Roan Plateau Resource
Management Plan Amendment,
Including Former Naval Oil Shale
Reserves 1 and 2, Garfield and Rio
Blanco Counties, CO.
Summary: EPA expressed
environmental concerns with potential
adverse impacts from increased access
to the top of the plateau, to Colorado
Cutthroat from sedimentation from new
roads, fragmentation of critical winter
habitat for mule deer, and reduction of
areas with wilderness characteristics,
and recommended that the Final EIS
include mitigation measures identified
in the analysis to reduce these impacts.
Rating EC2.
EIS No. 20050104, ERP No. D–NPS–
K61161–CA, Golden Gate National
Recreation Area (GGNRA) Fire
Management Plan, Implementation,
Muir Woods National Monument,
Fort Point National Historic Site, San
E:\FR\FM\22JYN1.SGM
22JYN1
Agencies
[Federal Register Volume 70, Number 140 (Friday, July 22, 2005)]
[Notices]
[Page 42318]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-14546]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6665-5]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 07/11/2005 through 07/15/2005
Pursuant to 40 CFR 1506.9.
EIS No. 20050290, Final EIS, NOA, AK, Pribilof Islands Setting for the
Annual Subsistence Harvest of Northern Fur Seals, To Determine and
Publish the Take Ranges, Pribilof Islands, AK, Wait Period Ends: 08/22/
2005, Contact: James W. Balsiger 301-713-3318.
EIS No. 20050291, Final EIS, AFS, CO, Gold Camp Road Plan, Develop a
Feasible Plan to Manage the Operation of Tunnel 3 and the 8.5
mile Road Segment, Pike National Forest, Pikes Peak Ranger District,
Colorado Springs, El Paso County, CO, Wait Period Ends: 08/22/2005,
Contact: Frank Landis 719-477-4203.
EIS No. 20050292, Draft EIS, USA, HI, Makua Military Reservation (MMR)
Project, Proposed Military Training Activities, 25th Infantry Division
(Light) and U.S. Army, HI, Comment Period Ends: 09/21/2005, Contact:
Gary Shirakata 808-438-0772.
EIS No. 20050293, Draft EIS, WPA, AZ, Wellton-Mohawk Generating
Facility Project, Construction and Operation a Natural Gas-Fired,
Combined-Cycle, Electric Generating Stations, Approval for Right-of-
Way, Yuma County, AZ, Comment Period Ends: 09/06/2005, Contact: Mark J.
Wieringa 720-962-7448.
EIS No. 20050294, Revised Draft EIS, COE, CA, Mare Island Reuse of
Dredged Material Disposal Ponds as a Confirmed Updated Dredged Material
Disposal Facility, Issuing Section 404 Permit Clean Water Act and
Section 10 Permit Rivers and Harbor Act, San Francisco Bay Area, City
of Vallejo, Solando County, CA, Error: Revised Draft EIS 09/06/2005,
Contact: Robert J. Lawrence 415-977-8020.
EIS No. 20050295, Draft EIS, AFS, CA, Bald Mountain Project, Proposes
to Harvest Trees Using Group and Individual Trees Selection Methods,
Feather River Ranger District, Plumas National Forest, Plumas and Butte
Counties, CA, Comment Period Ends: 09/06/2005, Contact: Katherine Worn
530-534-6500.
EIS No. 20050296, Final EIS, TVA, TN, 500-kV Transmission Lin in Middle
Tennessee Construction and Operation, Cumberland Fossil Plant to either
the Montgomery 500-kV Substation, Montgomery County, or the Davidson
500-kV Substation, Davidson County, Stewart, Houston, Montgomery,
Dickerson, Cheatham and Davidson Counties, TN, Wait Period Ends: 08/22/
2005, Contact: Charles P. Nicholson 865-632-3582.
EIS No. 20050297, Draft EIS, SFW, WY, Bison and Elk Management Plan,
Implementation, National Elk Refuge/Grand Teton National Park/John D.
Rockefeller, Jr. Memorial Parkway, Teton County, WY, Comment Period
Ends: 09/30/2005, Contact: Laurie Shannon 303-236-4317.
EIS No. 20050298, Draft EIS, AFS, UT, West Bear Vegetation Management
Project, Timber Harvesting, Prescribed Burning, Roads Construction,
Township 1 North, Range 9 East, Salt Lake Principle Meridian, Evanston
Ranger District, Wasatch-Cache National Forest, Summit County, UT,
Comment Period Ends: 09/06/2005, Contact: Larry Johnson 307-789-3194.
EIS No. 20050299, Draft EIS, SFW, CA, San Diego Bay National Wildlife
Refuge Comprehensive Conservation Plan, Implementation, Sweetwater
Marsh and South San Diego Bay Units, San Diego County, CA, Comment
Period Ends: 09/19/2005, Contact: Victoria Touchstone 760-431-9440 Ex.
349.
EIS No. 20050300, Draft Supplemental EIS, NOA, 00, Reef Fish (Amendment
25) and Coastal Migatory Pelagic (CMP) (Amendment 17) Fishery
Management Plans (FMP) for Extending the Charter Vessel/Headboat Permit
Moratorium, Gulf of Mexico, Comment Period Ends: 09/06/2005, Contact:
Andy Strelcheck 727-824-5305.
Dated: July 19, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 05-14546 Filed 7-21-05; 8:45 am]
BILLING CODE 6560-50-P