Questar Pipeline Company; Notice of Tariff Filing, 42047 [E5-3895]
Download as PDF
Federal Register / Vol. 70, No. 139 / Thursday, July 21, 2005 / Notices
Comment Date: 5 p.m. on July 29,
2005.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–3889 Filed 7–20–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER05–982–000, ER05–982–
001]
Prime Power Sales I, LLC; Notice of
Issuance of Order
July 15, 2005.
Prime Power Sales I, LLC (PPSI) filed
an application for market-based rate
authority, with an accompanying rate
schedule. The proposed rate schedule
provides for wholesale sales of energy
and capacity at market-based rates. PPSI
also requested waiver of various
Commission regulations. In particular,
PPSI requested that the Commission
grant blanket approval under 18 CFR
part 34 of all future issuances of
securities and assumptions of liability
by PPSI.
On July 14, 2005, the Commission
granted the request for blanket approval
under part 34, subject to the following:
Any person desiring to be heard or to
protest the blanket approval of
issuances of securities or assumptions of
liability by PPSI should file a motion to
intervene or protest with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing motions to intervene
or protest, is August 15, 2005.
Absent a request to be heard in
opposition by the deadline above, PPSI
is authorized to issue securities and
assume obligations or liabilities as a
guarantor, indorser, surety, or otherwise
in respect of any security of another
person; provided that such issuance or
assumption is for some lawful object
within the corporate purposes of PPSI,
compatible with the public interest, and
is reasonably necessary or appropriate
for such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approval of PPSI issuances of securities
or assumptions of liability.
Copies of the full text of the Director’s
Order are available from the
VerDate jul<14>2003
19:42 Jul 20, 2005
Jkt 205001
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at
https://www.ferc.gov, using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–3890 Filed 7–20–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP05–508–000]
Questar Pipeline Company; Notice of
Tariff Filing
July 15, 2005.
Take notice that on July 13, 2005,
Questar Pipeline Company (Questar),
tendered for filing as part of its FERC
Gas Tariff, Original Volume No. 3,
Forty-First Revised Sheet No. 8, to be
effective August 15, 2005.
Questar states that this filing
proposed the deletion of the reference to
a Gas Research Institute (GRI) surcharge
that is no longer applicable. Questar
further states that the GRI funding has
been eliminated according to a
Commission-approved 1998 settlement.
Questar states that copies of this filing
were served upon Questar’s customers,
the Public Service Commission of Utah
and the Public Service Commission of
Wyoming.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
42047
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–3895 Filed 7–20–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP05–393–000]
Tennessee Gas Pipeline Company;
Notice of Request Under Blanket
Authorization
July 14, 2005.
Take notice that on July 8, 2005,
Tennessee Gas Pipeline Company
(Tennessee), 1001 Louisiana Street,
Houston, Texas 77002, filed in Docket
No. CP05–393–000 a request pursuant to
sections 157.205(b) and 157.208(f)(2) of
the Commission’s Regulations under the
Natural Gas Act (18 CFR 157.205 and
157.208) for authorization to increase
the maximum allowable operating
pressure (MAOP) of its North OdemSpartan lateral (Line 3A–100) located in
San Patricio County, Texas, under the
authorization issued in Docket No.
CP82–413–000 pursuant to section 7 of
the Natural Gas Act, all as more fully
described in the request.
This filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
E:\FR\FM\21JYN1.SGM
21JYN1
Agencies
[Federal Register Volume 70, Number 139 (Thursday, July 21, 2005)]
[Notices]
[Page 42047]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-3895]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP05-508-000]
Questar Pipeline Company; Notice of Tariff Filing
July 15, 2005.
Take notice that on July 13, 2005, Questar Pipeline Company
(Questar), tendered for filing as part of its FERC Gas Tariff, Original
Volume No. 3, Forty-First Revised Sheet No. 8, to be effective August
15, 2005.
Questar states that this filing proposed the deletion of the
reference to a Gas Research Institute (GRI) surcharge that is no longer
applicable. Questar further states that the GRI funding has been
eliminated according to a Commission-approved 1998 settlement.
Questar states that copies of this filing were served upon
Questar's customers, the Public Service Commission of Utah and the
Public Service Commission of Wyoming.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed in accordance with the provisions of
Section 154.210 of the Commission's regulations (18 CFR 154.210).
Anyone filing an intervention or protest must serve a copy of that
document on the Applicant. Anyone filing an intervention or protest on
or before the intervention or protest date need not serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-3895 Filed 7-20-05; 8:45 am]
BILLING CODE 6717-01-P