Federal Register / Vol. 70, No. 139 / Thursday, July 21, 2005 / Notices
Description: Berkshire Power
Company, LLC submits Exhibit FMB–2,
which provides detailed cost & revenue
information for Berkshire for the
calendar year 2000 through 2004,
amending its 6/30/05 filing in ER05–
1179–000.
Filed Date: 7/8/2005.
Accession Number: 20050712–0210.
Comment Date: 5 p.m. Eastern Time
on Thursday, July 21, 2005.
Docket Numbers: ER05–1207–000.
Applicants: Southwestern Electric
Power Company.
Description: Southwestern Electric
Power Company submits changes in
rates applicable to transmission service
to be provided to Arkansas Electric
Cooperative Corporation for the period
7/1/05 to 12/21/07.
Filed Date: 7/11/2005.
Accession Number: 20050713–0074.
Comment Date: 5 p.m. Eastern Time
on Monday, August 1, 2005.
Docket Numbers: ER97–2801–008,
ER03–478–006 and EL05–95–000.
Applicants: PacifiCorp.
Description: PacifiCorp and PPM
Energy, Inc., provides their second and
final filing in compliance with FERC’s
5/9/05 order.
Filed Date: 7/8/2005, as amended 7/
12/2005.
Accession Number: 20050712–0286.
Comment Date: 5 p.m. Eastern Time
on Friday, July 29, 2005.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other and the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
VerDate jul<14>2003
19:42 Jul 20, 2005
Jkt 205001
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–3899 Filed 7–20–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Intent To File Application for
New License
July 14, 2005.
a. Type of Filing: Notice of intent to
file application for a new license.
b. Project No.: 606.
c. Date Filed: June 27, 2005.
d. Submitted by: Synergics Energy
Services, LLC.
e. Name of Project: Kilarc-Cow Creek
Project.
f. Location: On Old Cow Creek and
South Cow Creek in Shasta County,
California.
g. Filed Pursuant to: Section 15 of the
Federal Power Act; 18 CFR 16.6 of the
Commission’s regulations. Pursuant to
18 CFR 16.25, the Commission solicited
applications from potential applicants
for the Kilarc-Cow Creek project when
the current licensee, Pacific Gas &
Electric Co., did not file a new license
application for the project by the March
27, 2005 deadline. Potential applicants
had 90 days (ending July 5, 2005) to file
a Notice of Intent to file an application
for a new license for P–606.
h. Expiration Date of Current License:
March 27, 2007.
i. The project consists of two separate
operating projects. The first, the Kilarc
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
42051
facility, consists of: (1) North Canyon
Creek diversion and canal; (2) South
Canyon Creek diversion dam and canal;
(3) Canyon Creek siphon; (4) Kilarc
diversion dam main canal; (5) Kilarc
forebay dam; (6) Kilarc forebay,
penstock, and powerhouse. The second,
the Cow Creek facility, consists of: (1)
Mill Creek diversion dam and Mill
Creek-South Cow Creek canal; (2) South
Cow Creek diversion dam and main
canal; (3) Cow Creek forebay dam; (4)
Cow Creek forebay, penstock, and
powerhouse.
j. Pursuant to 18 CFR 16.7,
Information on the Project is Available
at: Whitmore Public Library, 30611
Whitmore Road, Whitmore, CA, 96096.
k. FERC Contact: Emily Carter, 202–
502–6512, emily.carter@ferc.gov.
l. Licensee Contact: Arthur Hagood,
Synergics Energy Services, LLC, 191
Main Street, Annapolis, Maryland,
21401.
m. The applicant states its
unequivocal intent to submit an
application for a new license for Project
No. 606. Pursuant to Part I of the
Federal Power Act and Part 4 (except
section 4.38) of the Commission’s
regulations, the application for license
for this project must be filed with the
Commission within 18 months of the
date on which the applicant files its
notice and must comply with the
requirements of 18 CFR 16.8 and 16.10
of the Commissions Regulations. The
applicant filed their Notice of Intent to
file an application for new license for P–
606 on June 27, 2005 and the
application for license for this project
must be filed by December 27, 2006.
n. A copy of this filing is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number in the docket
number field to access the document.
For assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or TTY 202–
502–8659. A copy is also available for
inspection and reproduction at the
address in item k above.
o. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support as shown in the paragraph
above.
p. By this notice, the Commission is
seeking corrections and updates to the
attached mailing list for the Kilarc-Cow
Creek Project. Updates should be filed
with Magalie R. Salas, Secretary,
E:\FR\FM\21JYN1.SGM
21JYN1
42052
Federal Register / Vol. 70, No. 139 / Thursday, July 21, 2005 / Notices
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–3879 Filed 7–20–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice Soliciting Scoping Comments
July 14, 2005.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New major
license.
b. Project No.: P–7758–004.
c. Date Filed: February 5, 2005.
d. Applicant: Holyoke Gas & Electric
Department.
e. Name of Project: Holyoke No. 4
Hydroelectric Project.
f. Location: On the Holyoke Canal
System on the Connecticut River in
Hampden County, Massachusetts.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Paul
Ducheney, Superintendent-Hydro,
Holyoke Gas & Electric Department, One
Canal Street, Holyoke, MA 01040, (413)
536–9340 or ducheney@hged.com.
i. FERC Contact: Jack Hannula, (202)
502–8917, john.hannula@ferc.gov.
j. Deadline for Filing Scoping
Comments: August 19, 2005.
All documents (original and eight
copies) should be filed with: Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
Scoping comments may be filed
electronically via the Internet in lieu of
paper. The Commission strongly
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov) under the ‘‘eFiling’’ link.
k. This application is not ready for
environmental analysis at this time.
VerDate jul<14>2003
19:42 Jul 20, 2005
Jkt 205001
l. The project is located on the
Holyoke Canal System on the
Connecticut River in Hampden County,
Massachusetts.1 The Holyoke Canal
System consists of three levels, and the
project facilities are located between the
first and second canal level. The project
is one of nine FERC-licensed projects on
the Holyoke Canal System. The Holyoke
No. 4 Hydro Project has an installed
generating capacity of 750 kilowatts
(kW), and generates about 3,148,000
kilowatt-hours (kWh) of energy
annually. Flows into the Canal System
are regulated by HG&E through
operation of the Holyoke Project No.
2004 according to the Comprehensive
Canal Operations Plan (CCOP) and the
Comprehensive Operations and Flow
Plan (COFP).2 The project does not
occupy any Federal lands.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘FERRIS’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
n. You may also register online at
https://www.ferc.gov.esubscribenow.htm
to be notified via e-mail of new filings
and issuances related to this or other
pending projects. For assistance, contact
FERC Online Support.
o. Scoping Process:
The Commission staff intends to
prepare an Environmental Assessment
(EA) for the Holyoke No. 4
Hydroelectric Project in accordance
with the National Environmental Policy
Act. The EA will consider both sitespecific and cumulative environmental
impacts and reasonable alternatives to
the proposed action.
Commission staff does not propose to
conduct any on-site scoping meetings at
this time. Instead, we will solicit
comments, recommendations,
information, and alternatives in the
Scoping Document (SD).
Copies of the SD outlining the subject
areas to be addressed in the EA were
distributed to the parties on the
Commission’s mailing list. Copies of the
1 The Holyoke Canal System is licensed under the
Holyoke Project No. 2004. 88 FERC ¶ 61,186 (1999).
2 The CCOP and COEP are part of a Settlement
Agreement (filed with the Commission on March
12, 2004) as part of the licensing of the Holyoke
Project No. 2004. These plans address canal flows,
water quality, fish, and other habitat species.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
SD may be viewed on the Web at
https://www.ferc.gov using the ‘‘FERRIS’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, call 1–866–208–3676 or
for TTY, (202) 502–8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–3880 Filed 7–20–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP05–360–000]
Creole Trail LNG Terminal, L.P.; Notice
of Technical Conference
July 14, 2005.
On Wednesday, August 10, 2005, at
8:30 a.m. (CDT), staff of the Office of
Energy Projects will convene a
cryogenic design and technical
conference regarding the proposed
Creole Trail LNG import terminal. The
cryogenic conference will be held in the
Holiday Inn Express Hotel & Suites in
Sulphur, Louisiana. The hotel is located
at 102 Mallard St, Sulphur, Louisiana
70665. For hotel details call 337–625–
2500.
In view of the nature of critical energy
infrastructure information and security
issues to be explored, the cryogenic
conference will not be open to the
public. Attendance at this conference
will be limited to existing parties to the
proceeding (anyone who has
specifically requested to intervene as a
party) and to representatives of
interested Federal, state, and local
agencies. Any person planning to attend
the August 10th cryogenic conference
must register by close of business on
Friday, August 5, 2005. Registrations
may be submitted either online at
https://www.ferc.gov/whats-new/
registration/cryo-conf-form.asp or by
faxing a copy of the form (found at the
referenced online link) to 202–208–
0353. All attendees must sign a nondisclosure statement prior to entering
the conference. For additional
information regarding the cryogenic
conference, please contact Kareem M.
Monib at 202–502–6265.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–3876 Filed 7–20–05; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\21JYN1.SGM
21JYN1
Agencies
[Federal Register Volume 70, Number 139 (Thursday, July 21, 2005)]
[Notices]
[Pages 42051-42052]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-3879]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Intent To File Application for New License
July 14, 2005.
a. Type of Filing: Notice of intent to file application for a new
license.
b. Project No.: 606.
c. Date Filed: June 27, 2005.
d. Submitted by: Synergics Energy Services, LLC.
e. Name of Project: Kilarc-Cow Creek Project.
f. Location: On Old Cow Creek and South Cow Creek in Shasta County,
California.
g. Filed Pursuant to: Section 15 of the Federal Power Act; 18 CFR
16.6 of the Commission's regulations. Pursuant to 18 CFR 16.25, the
Commission solicited applications from potential applicants for the
Kilarc-Cow Creek project when the current licensee, Pacific Gas &
Electric Co., did not file a new license application for the project by
the March 27, 2005 deadline. Potential applicants had 90 days (ending
July 5, 2005) to file a Notice of Intent to file an application for a
new license for P-606.
h. Expiration Date of Current License: March 27, 2007.
i. The project consists of two separate operating projects. The
first, the Kilarc facility, consists of: (1) North Canyon Creek
diversion and canal; (2) South Canyon Creek diversion dam and canal;
(3) Canyon Creek siphon; (4) Kilarc diversion dam main canal; (5)
Kilarc forebay dam; (6) Kilarc forebay, penstock, and powerhouse. The
second, the Cow Creek facility, consists of: (1) Mill Creek diversion
dam and Mill Creek-South Cow Creek canal; (2) South Cow Creek diversion
dam and main canal; (3) Cow Creek forebay dam; (4) Cow Creek forebay,
penstock, and powerhouse.
j. Pursuant to 18 CFR 16.7, Information on the Project is Available
at: Whitmore Public Library, 30611 Whitmore Road, Whitmore, CA, 96096.
k. FERC Contact: Emily Carter, 202-502-6512, emily.carter@ferc.gov.
l. Licensee Contact: Arthur Hagood, Synergics Energy Services, LLC,
191 Main Street, Annapolis, Maryland, 21401.
m. The applicant states its unequivocal intent to submit an
application for a new license for Project No. 606. Pursuant to Part I
of the Federal Power Act and Part 4 (except section 4.38) of the
Commission's regulations, the application for license for this project
must be filed with the Commission within 18 months of the date on which
the applicant files its notice and must comply with the requirements of
18 CFR 16.8 and 16.10 of the Commissions Regulations. The applicant
filed their Notice of Intent to file an application for new license for
P-606 on June 27, 2005 and the application for license for this project
must be filed by December 27, 2006.
n. A copy of this filing is available for review at the Commission
in the Public Reference Room or may be viewed on the Commission's Web
site at https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number in the docket number field to access the document. For
assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov
or toll-free at 1-866-208-3676, or TTY 202-502-8659. A copy is also
available for inspection and reproduction at the address in item k
above.
o. Register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support as shown in the paragraph above.
p. By this notice, the Commission is seeking corrections and
updates to the attached mailing list for the Kilarc-Cow Creek Project.
Updates should be filed with Magalie R. Salas, Secretary,
[[Page 42052]]
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-3879 Filed 7-20-05; 8:45 am]