Creole Trail LNG Terminal, L.P.; Notice of Technical Conference, 42052 [E5-3876]
Download as PDF
42052
Federal Register / Vol. 70, No. 139 / Thursday, July 21, 2005 / Notices
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–3879 Filed 7–20–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice Soliciting Scoping Comments
July 14, 2005.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New major
license.
b. Project No.: P–7758–004.
c. Date Filed: February 5, 2005.
d. Applicant: Holyoke Gas & Electric
Department.
e. Name of Project: Holyoke No. 4
Hydroelectric Project.
f. Location: On the Holyoke Canal
System on the Connecticut River in
Hampden County, Massachusetts.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Paul
Ducheney, Superintendent-Hydro,
Holyoke Gas & Electric Department, One
Canal Street, Holyoke, MA 01040, (413)
536–9340 or ducheney@hged.com.
i. FERC Contact: Jack Hannula, (202)
502–8917, john.hannula@ferc.gov.
j. Deadline for Filing Scoping
Comments: August 19, 2005.
All documents (original and eight
copies) should be filed with: Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
Scoping comments may be filed
electronically via the Internet in lieu of
paper. The Commission strongly
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov) under the ‘‘eFiling’’ link.
k. This application is not ready for
environmental analysis at this time.
VerDate jul<14>2003
19:42 Jul 20, 2005
Jkt 205001
l. The project is located on the
Holyoke Canal System on the
Connecticut River in Hampden County,
Massachusetts.1 The Holyoke Canal
System consists of three levels, and the
project facilities are located between the
first and second canal level. The project
is one of nine FERC-licensed projects on
the Holyoke Canal System. The Holyoke
No. 4 Hydro Project has an installed
generating capacity of 750 kilowatts
(kW), and generates about 3,148,000
kilowatt-hours (kWh) of energy
annually. Flows into the Canal System
are regulated by HG&E through
operation of the Holyoke Project No.
2004 according to the Comprehensive
Canal Operations Plan (CCOP) and the
Comprehensive Operations and Flow
Plan (COFP).2 The project does not
occupy any Federal lands.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘FERRIS’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
n. You may also register online at
https://www.ferc.gov.esubscribenow.htm
to be notified via e-mail of new filings
and issuances related to this or other
pending projects. For assistance, contact
FERC Online Support.
o. Scoping Process:
The Commission staff intends to
prepare an Environmental Assessment
(EA) for the Holyoke No. 4
Hydroelectric Project in accordance
with the National Environmental Policy
Act. The EA will consider both sitespecific and cumulative environmental
impacts and reasonable alternatives to
the proposed action.
Commission staff does not propose to
conduct any on-site scoping meetings at
this time. Instead, we will solicit
comments, recommendations,
information, and alternatives in the
Scoping Document (SD).
Copies of the SD outlining the subject
areas to be addressed in the EA were
distributed to the parties on the
Commission’s mailing list. Copies of the
1 The Holyoke Canal System is licensed under the
Holyoke Project No. 2004. 88 FERC ¶ 61,186 (1999).
2 The CCOP and COEP are part of a Settlement
Agreement (filed with the Commission on March
12, 2004) as part of the licensing of the Holyoke
Project No. 2004. These plans address canal flows,
water quality, fish, and other habitat species.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
SD may be viewed on the Web at
https://www.ferc.gov using the ‘‘FERRIS’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, call 1–866–208–3676 or
for TTY, (202) 502–8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–3880 Filed 7–20–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP05–360–000]
Creole Trail LNG Terminal, L.P.; Notice
of Technical Conference
July 14, 2005.
On Wednesday, August 10, 2005, at
8:30 a.m. (CDT), staff of the Office of
Energy Projects will convene a
cryogenic design and technical
conference regarding the proposed
Creole Trail LNG import terminal. The
cryogenic conference will be held in the
Holiday Inn Express Hotel & Suites in
Sulphur, Louisiana. The hotel is located
at 102 Mallard St, Sulphur, Louisiana
70665. For hotel details call 337–625–
2500.
In view of the nature of critical energy
infrastructure information and security
issues to be explored, the cryogenic
conference will not be open to the
public. Attendance at this conference
will be limited to existing parties to the
proceeding (anyone who has
specifically requested to intervene as a
party) and to representatives of
interested Federal, state, and local
agencies. Any person planning to attend
the August 10th cryogenic conference
must register by close of business on
Friday, August 5, 2005. Registrations
may be submitted either online at
https://www.ferc.gov/whats-new/
registration/cryo-conf-form.asp or by
faxing a copy of the form (found at the
referenced online link) to 202–208–
0353. All attendees must sign a nondisclosure statement prior to entering
the conference. For additional
information regarding the cryogenic
conference, please contact Kareem M.
Monib at 202–502–6265.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–3876 Filed 7–20–05; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\21JYN1.SGM
21JYN1
Agencies
[Federal Register Volume 70, Number 139 (Thursday, July 21, 2005)]
[Notices]
[Page 42052]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-3876]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP05-360-000]
Creole Trail LNG Terminal, L.P.; Notice of Technical Conference
July 14, 2005.
On Wednesday, August 10, 2005, at 8:30 a.m. (CDT), staff of the
Office of Energy Projects will convene a cryogenic design and technical
conference regarding the proposed Creole Trail LNG import terminal. The
cryogenic conference will be held in the Holiday Inn Express Hotel &
Suites in Sulphur, Louisiana. The hotel is located at 102 Mallard St,
Sulphur, Louisiana 70665. For hotel details call 337-625-2500.
In view of the nature of critical energy infrastructure information
and security issues to be explored, the cryogenic conference will not
be open to the public. Attendance at this conference will be limited to
existing parties to the proceeding (anyone who has specifically
requested to intervene as a party) and to representatives of interested
Federal, state, and local agencies. Any person planning to attend the
August 10th cryogenic conference must register by close of business on
Friday, August 5, 2005. Registrations may be submitted either online at
https://www.ferc.gov/whats-new/registration/cryo-conf-form.asp or by
faxing a copy of the form (found at the referenced online link) to 202-
208-0353. All attendees must sign a non-disclosure statement prior to
entering the conference. For additional information regarding the
cryogenic conference, please contact Kareem M. Monib at 202-502-6265.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-3876 Filed 7-20-05; 8:45 am]
BILLING CODE 6717-01-P