El Paso Natural Gas Company; Notice of Proposed Changes in FERC Gas Tariff, 38666-38667 [E5-3481]

Download as PDF 38666 Federal Register / Vol. 70, No. 127 / Tuesday, July 5, 2005 / Notices Gas Tariff, First Revised Volume No. 1, the following tariff sheets to become effective July 18, 2005: Seventh Revised Sheet No. 22 Seventh Revised Sheet No. 88 Fourth Revised Sheet No. 132A.04 First Revised Sheet No. 132A.04a DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket No. RP05–384–000] [Docket No. RP05–43–003] Dominion Cove Point LNG, LP; Notice of Compliance Filing El Paso Natural Gas Company; Notice of Proposed Changes in FERC Gas Tariff CIG states that these tariff sheets remove the tariff provisions implementing the Commissions rebuttable presumption discount policy. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. June 22, 2005. June 22, 2005. Take notice that on June 15, 2005, Dominion Cove Point LNG, LP (Cove Point) submitted a compliance filing pursuant to the Commission’s ‘‘Order On Technical Conference And On Rehearing And Clarification’’ issued May 31, 2005 in Docket No. RP05–43– 000 et al. Cove Point states that copies of the filing were served on parties on the official service list in the abovecaptioned proceeding. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. The Commission encourages electronic submission of protests in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Take notice that on June 17, 2005, El Paso Natural Gas Company (EPNG) tendered for filing as part of its FERC Gas Tariff, Second Revised Volume No. 1, the following tariff sheets, to become effective July 18, 2005: Magalie R. Salas, Secretary. [FR Doc. E5–3503 Filed 7–1–05; 8:45 am] Magalie R. Salas, Secretary. [FR Doc. E5–3476 Filed 7–1–05; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P VerDate jul<14>2003 18:41 Jul 01, 2005 Jkt 205001 PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 Fifth Revised Sheet No. 288 Second Revised Sheet No. 288A EPNG states that these tariff sheets remove the tariff provisions implementing the Commission’s rebuttable presumption discount policy. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail E:\FR\FM\05JYN1.SGM 05JYN1 Federal Register / Vol. 70, No. 127 / Tuesday, July 5, 2005 / Notices FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E5–3481 Filed 7–1–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP05–385–000] Kern River Gas Transmission Company; Notice of Request Under Blanket Authorization of intervention and pursuant to Section 157.205 of the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to the request. If no protest is filed within the time allowed therefor, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to Section 7 of the Natural Gas Act. Magalie R. Salas, Secretary. [FR Doc. E5–3477 Filed 7–1–05; 8:45 am] BILLING CODE 6717–01–P June 22, 2005. Take notice that on June 13, 2005, Kern River Gas Transmission Company (Kern River) 2755 E. Cottonwood Parkway, Suite #300, Salt Lake City, Utah 84121, filed in Docket No. CP05– 385–000, a prior notice request pursuant to sections 157.205 and 157.211of the Commission’s Regulations under the Natural Gas Act (NGA) for authorization to construct and operate new delivery point facilities, the Redwood Meter Station, to serve the Chevron Texaco Products Company (Chevron Texaco) in Davis County, Utah, which is on file with the Commission and open to public inspection. Any questions concerning this application may be directed to Billie L. Tolman, Manager, Tariffs and Certificates, Kern River Gas Transmission, P.O. Box 71400, Salt Lake City, Utah 84171–0400 at (801) 937– 6176. This filing is available for review at the Commission or may be viewed on the Commission’s Web site at https:// www.ferc.gov, using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number filed to access the document. For assistance, please contact FERC Online Support at FERC OnlineSupport@ferc.gov or call toll-free at (866) 206–3676, or, for TTY, contact (202) 502–8659. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages intervenors to file electronically. Any person or the Commission’s staff may, within 45 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice VerDate jul<14>2003 18:41 Jul 01, 2005 Jkt 205001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission 38667 interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E5–3502 Filed 7–1–05; 8:45 am] [Docket No. RP05–382–000] Mojave Pipeline Company; Notice of Proposed Changes in FERC Gas Tariff BILLING CODE 6717–01–P June 22, 2005. DEPARTMENT OF ENERGY Take notice that on June 17, 2005, Mojave Pipeline Company (Mojave) tendered for filing as part of its FERC Gas Tariff, Second Revised Volume No. 1, the following tariff sheets, to become effective July 18, 2005: Federal Energy Regulatory Commission First Revised Sheet No. 240B First Revised Sheet No. 240C Frm 00023 Fmt 4703 Sfmt 4703 Northwest Pipeline Corporation; Notice of Petition for Declaratory Order June 22, 2005. Mojave states that these tariff sheets remove the tariff provisions implementing the Commission’s rebuttable presumption discount policy. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and PO 00000 [Docket No. RP05–379–000] Take notice that on June 16, 2005, Northwest Pipeline Corporation (Northwest) submitted for filing a Petition for Declaratory Order requesting that the Commission terminate a controversy arising under Section 21.3 of its tariff concerning the facilities reimbursement obligations of its shippers. Northwest states that the subject controversy particularly involves a disagreement with shipper Duke Energy Trading and Marketing, LLC over the term ‘‘related income taxes’’ in determining facilities reimbursement under Northwest’s tariff. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the E:\FR\FM\05JYN1.SGM 05JYN1

Agencies

[Federal Register Volume 70, Number 127 (Tuesday, July 5, 2005)]
[Notices]
[Pages 38666-38667]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-3481]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RP05-384-000]


El Paso Natural Gas Company; Notice of Proposed Changes in FERC 
Gas Tariff

June 22, 2005.
    Take notice that on June 17, 2005, El Paso Natural Gas Company 
(EPNG) tendered for filing as part of its FERC Gas Tariff, Second 
Revised Volume No. 1, the following tariff sheets, to become effective 
July 18, 2005:

Fifth Revised Sheet No. 288
Second Revised Sheet No. 288A

    EPNG states that these tariff sheets remove the tariff provisions 
implementing the Commission's rebuttable presumption discount policy.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed in accordance with the provisions of 
Section 154.210 of the Commission's regulations (18 CFR 154.210). 
Anyone filing an intervention or protest must serve a copy of that 
document on the Applicant. Anyone filing an intervention or protest on 
or before the intervention or protest date need not serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail

[[Page 38667]]

FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Magalie R. Salas,
Secretary.
[FR Doc. E5-3481 Filed 7-1-05; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.