San Diego Gas & Electric Company, et al.; Electric Rate and Corporate Filings, 38126-38127 [E5-3454]

Download as PDF 38126 Federal Register / Vol. 70, No. 126 / Friday, July 1, 2005 / Notices AlaTenn states that copies of its filing have been mailed to all affected customers of AlaTenn and any interested State commissions. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E5–3452 Filed 6–30–05; 8:45 am] BILLING CODE 6717–01–P VerDate jul<14>2003 18:11 Jun 30, 2005 Jkt 205001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP05–386–000] Overthrust Pipeline Company; Notice of Proposed Changes in FERC Gas Tariff June 24, 2005. Take notice that on June 21, 2005, Overthrust Pipeline Company (Overthrust) tendered for filing as part of its FERC Gas Tariff, First Revised Volume No. 1–A, the following tariff sheets, to become effective July 22, 2005: Fourteenth Revised Sheet No. 1 Seventeenth Revised Sheet No. 30 Fourth Revised Sheet No. 35 Ninth Revised Sheet No. 37 Fifth Revised Sheet No. 38 Seventh Revised Sheet No. 40 Sixth Revised Sheet No. 41 Eighth Revised Sheet No 43 Seventh Revised Sheet No. 44 Second Revised Sheet No. 57 Seventh Revised Sheet No. 60 Eighth Revised Sheet No. 67B Second Revised Sheet No. 67K Seventh Revised Sheet Nos. 68 69 Sixth Revised Sheet No. 77 Third Revised Sheet No. 78J Fifth Revised Sheet No. 78K Third Revised Sheet Nos. 100 through 106 Original Sheet No. 106A Fourth Revised Sheet Nos. 107 and 108 Third Revised Sheet No. 109 Overthrust states it is proposing to clean-up and clarify specific aspects of its tariff language. In addition, Overthrust indicates that it is proposing to modify the ‘‘failure to pay’’ provision, 17.6, to be consistent with the tariff provisions of other pipelines operated by Questar Pipeline Company. Overthrust states that copies of the filing have been served upon Overthrust’s customers and the public service commissions of Utah and Wyoming. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E5–3451 Filed 6–30–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL00–95–127, et al.] San Diego Gas & Electric Company, et al.; Electric Rate and Corporate Filings June 24, 2005. The following filings have been made with the Commission. The filings are listed in ascending order within each docket classification. 1. San Diego Gas & Electric Company, Complainant v. Sellers of Energy and Ancillary Services Into Markets Operated by the California Independent System Operator and the California Power Exchange, Respondents; Investigation of Practices of the California Independent System Operator and the California Power Exchange [Docket Nos. EL00–95–127, EL00–98–114] Take notice that on June 21, 2005, The City of Los Angeles Department of Water and Power (LADWP) submitted an amendment to its March 21, 2005 emissions cost compliance filing to E:\FR\FM\01JYN1.SGM 01JYN1 Federal Register / Vol. 70, No. 126 / Friday, July 1, 2005 / Notices correct certain inadvertent errors in calculations. Comment Date: 5 p.m. on July 12, 2005. 2. Lockhart Power Company [Docket No. EL05–129–000] Take notice that on June 21, 2005, Lockhart Power Company (Lockhart) filed a motion requesting full waiver or exemption from the filing requirements of Order No. 2003–B and Order No. 2006. Comment Date: 5 p.m. on July 12, 2005. 3. Sempra Energy [Docket No. EL05–130–000] Take notice that on June 22, 2005, Sempra Energy, Southern California Gas Company and San Diego Gas & Electric Company, tendered for filing an expedited petition requesting that the Commission issue a declaratory order confirming that preemption principles and the filed rate doctrine bar a California state court jury from deciding the proper level of wholesale electric and gas rates during the California energy crisis in a class action lawsuit now pending before the San Diego Superior Court in Natural Gas AntiTrust Cases I, II, III & IV, J.C.C.P. Nos. 4221, 4224, 4226 & 4228. Comment Date: 5 p.m. on July 13, 2005. 4. Direct Energy Services, LLC [Docket No. ER05–876–001] Take notice that on June 22, 2005, Direct Energy Services, LLC (Direct Energy) submitted an amendment to its April 25, 2005 filing in Docket No. ER05–876–000 requesting market-based rate authorization. Comment Date: 5 p.m. on July 5, 2005. Standard Paragraph Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (19 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, VerDate jul<14>2003 18:11 Jun 30, 2005 Jkt 205001 interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to long on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protests to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available to review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov or call (866) 208–3676 (toll free). For TYY, call (202) 502–8659. Linda Mitry, Deputy Secretary. [FR Doc. E5–3454 Filed 6–30–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings June 24, 2005. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER00–895–007. Applicants: Onondago Cogeneration Limited Partnership. Description: Onondaga Cogeneration Limited Partnership, in response to the letter order issued 6/16/05 in Docket Nos. ER00–895–001 and 006, informs the Commission that on 1/9/04 they submitted Original Sheet Nos. 5 and 6 to its FERC Electric Tariff, Original Volume 1, which incorporated the Commission’s market behavior rules. Filed Date: 06/21/2005. Accession Number: 20050623–0114. PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 38127 Comment Date: 5 p.m. eastern time on Tuesday, July 12, 2005. Docket Numbers: ER02–245–001. Applicants: North American Energy, L.L.C. Description: North American Energy, L.L.C. submits an updated market power analyses, pursuant to FERC’s 5/31/05 Order in Docket No. ER98–38009–000, et al. Filed Date: 06/21/2005. Accession Number: 20050623–0118. Comment Date: 5 p.m. eastern time on Tuesday, July 12, 2005. Docket Numbers: ER04–691–051; EL04–104–049; ER04–960–006. Applicants: Midwest Independent Transmission System Operator, Inc. Description: Midwest Independent Transmission System Operator, Inc. and Mid-Continent Area Power Pool submit a compliance filing pursuant to the Commission’s 3/16/05 order, 110 FERC ¶ 61,290 (2005) . Filed Date: 06/21/2005. Accession Number: 20050623–0111. Comment Date: 5 p.m. eastern time on Tuesday, July 12, 2005. Docket Numbers: ER05–235–001; ER99–3502–003; ER02–137–003; ER02– 579–003. Applicants: El Paso Marketing, L.P.; Berkshire Power Company, L.L.C.; Mohawk River Funding III, L.L.C.; Capital District Energy Center Cogeneration Associates. Description: El Paso Marketing, L.P., Berkshire Power Company, L.L.C., Mohawk River Funding III, L.L.C. and Capital District Energy Center Cogeneration Associates submit an updated market power analyses supporting their continued authorization to sell power at marketbased rates. Filed Date: 06/20/2005. Accession Number: 20050623–0119. Comment Date: 5 p.m. eastern time on Monday, July 11, 2005. Docket Numbers: ER05–1134–000. Applicants: Southern Company Services, Inc. Description: Southern Company Services Inc., as agent for Alabama Power Company, Georgia Power Company, Gulf Power Company, Mississippi Power Company and Savannah Electric and Power Company, submits annual filing of revised accruals for post-retirement benefits other than pensions. Filed Date: 06/21/2005. Accession Number: 20050623–0038. Comment Date: 5 p.m. eastern time on Tuesday, July 12, 2005. Docket Numbers: ER05–1135–000. Applicants: Miami Valley Lighting, LLC. E:\FR\FM\01JYN1.SGM 01JYN1

Agencies

[Federal Register Volume 70, Number 126 (Friday, July 1, 2005)]
[Notices]
[Pages 38126-38127]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-3454]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL00-95-127, et al.]


San Diego Gas & Electric Company, et al.; Electric Rate and 
Corporate Filings

June 24, 2005.
    The following filings have been made with the Commission. The 
filings are listed in ascending order within each docket 
classification.

1. San Diego Gas & Electric Company, Complainant v. Sellers of Energy 
and Ancillary Services Into Markets Operated by the California 
Independent System Operator and the California Power Exchange, 
Respondents; Investigation of Practices of the California Independent 
System Operator and the California Power Exchange

[Docket Nos. EL00-95-127, EL00-98-114]

    Take notice that on June 21, 2005, The City of Los Angeles 
Department of Water and Power (LADWP) submitted an amendment to its 
March 21, 2005 emissions cost compliance filing to

[[Page 38127]]

correct certain inadvertent errors in calculations.
    Comment Date: 5 p.m. on July 12, 2005.

2. Lockhart Power Company

[Docket No. EL05-129-000]

    Take notice that on June 21, 2005, Lockhart Power Company 
(Lockhart) filed a motion requesting full waiver or exemption from the 
filing requirements of Order No. 2003-B and Order No. 2006.
    Comment Date: 5 p.m. on July 12, 2005.

3. Sempra Energy

[Docket No. EL05-130-000]

    Take notice that on June 22, 2005, Sempra Energy, Southern 
California Gas Company and San Diego Gas & Electric Company, tendered 
for filing an expedited petition requesting that the Commission issue a 
declaratory order confirming that preemption principles and the filed 
rate doctrine bar a California state court jury from deciding the 
proper level of wholesale electric and gas rates during the California 
energy crisis in a class action lawsuit now pending before the San 
Diego Superior Court in Natural Gas Anti-Trust Cases I, II, III & IV, 
J.C.C.P. Nos. 4221, 4224, 4226 & 4228.
    Comment Date: 5 p.m. on July 13, 2005.

4. Direct Energy Services, LLC

[Docket No. ER05-876-001]

    Take notice that on June 22, 2005, Direct Energy Services, LLC 
(Direct Energy) submitted an amendment to its April 25, 2005 filing in 
Docket No. ER05-876-000 requesting market-based rate authorization.
    Comment Date: 5 p.m. on July 5, 2005.

Standard Paragraph

    Any person desiring to intervene or to protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Rules of Practice and Procedure (19 CFR 385.211 and 
385.214) on or before 5 p.m. Eastern time on the specified comment 
date. It is not necessary to separately intervene again in a subdocket 
related to a compliance filing if you have previously intervened in the 
same docket. Protests will be considered by the Commission in 
determining the appropriate action to be taken, but will not serve to 
make protestants parties to the proceeding. Anyone filing a motion to 
intervene or protest must serve a copy of that document on the 
Applicant. In reference to filings initiating a new proceeding, 
interventions or protests submitted on or before the comment deadline 
need not be served on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://
www.ferc.gov. To facilitate electronic service, persons with Internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to long on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
14 copies of the intervention or protests to the Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426.
    The filings in the above proceedings are accessible in the 
Commission's eLibrary system by clicking on the appropriate link in the 
above list. They are also available to review in the Commission's 
Public Reference Room in Washington, DC. There is an eSubscription link 
on the Web site that enables subscribers to receive e-mail notification 
when a document is added to a subscribed docket(s). For assistance with 
any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov or 
call (866) 208-3676 (toll free). For TYY, call (202) 502-8659.

Linda Mitry,
Deputy Secretary.
[FR Doc. E5-3454 Filed 6-30-05; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.