Environmental Impacts Statements; Notice of Availability, 38131-38132 [05-13044]
Download as PDF
Federal Register / Vol. 70, No. 126 / Friday, July 1, 2005 / Notices
system to service its native load
customers. The monthly charge
methodology for NITS on the CAP 115kV and 230-kV transmission lines is the
product of the transmission customer’s
load-ratio share times one-twelfth of the
annual transmission revenue
requirement. The customer’s load-ratio
share is calculated on a rolling 12month basis. The customer’s load-ratio
share is equal to that customer’s hourly
load coincident with the CAP 115-kV
and 230-kV transmission lines monthly
transmission system peak divided by
the resultant value of the CAP 115-kV
and 230-kV transmission lines monthly
transmission system peak minus the
CAP 115-kV and 230-kV transmission
lines coincident peak for all firm pointto-point transmission service plus the
CAP 115-kV and 230-kV transmission
lines firm point-to-point transmission
service reservations.
The proposed rates include the costs
for scheduling, system control, and
dispatch service.
Legal Authority
Western is establishing rates for
transmission service on the CAP 115-kV
and 230-kV transmission lines under the
Department of Energy Organization Act
(42 U.S.C. 7101–7352); the Reclamation
Act of 1902 (ch. 1093, 32 Stat. 388), as
amended and supplemented by
subsequent laws, particularly section
9(c) of the Reclamation Project Act of
1939 (43 U.S.C. 485h(c)); and other acts
that specifically apply to the project
involved.
By Delegation Order No. 00–037–00,
effective December 6, 2001, the
Secretary of Energy delegated: (1) The
authority to develop power and
transmission rates to Western’s
Administrator; (2) the authority to
confirm, approve, and place such rates
into effect on an interim basis to the
Deputy Secretary of Energy; and (3) the
authority to confirm, approve, and place
into effect on a final basis, to remand,
or to disapprove such rates to the
Commission. Existing Department of
Energy (DOE) procedures for public
participation in power rate adjustments
(10 CFR part 903) were published on
September 18, 1985.
Web site at https://www.wapa.gov/dsw/
pwrmkt/CAPTRP/CAPTRP.htm.
Regulatory Procedure Requirements
Regulatory Flexibility Analysis
The Regulatory Flexibility Act of 1980
(5 U.S.C. 601, et seq.) requires Federal
agencies to perform a regulatory
flexibility analysis if a final rule is likely
to have a significant economic impact
on a substantial number of small entities
and there is a legal requirement to issue
a general notice of proposed
rulemaking. This action does not require
a regulatory flexibility analysis since it
is a rulemaking of particular
applicability involving rates or services
applicable to public property.
Environmental Compliance
In compliance with the National
Environmental Policy Act of 1969
(NEPA) (42 U.S.C. 4321, et seq.);
Council on Environmental Quality
Regulations (40 CFR parts 1500–1508);
and DOE NEPA Regulations (10 CFR
part 1021), Western has determined this
action is categorically excluded from
preparing an environmental assessment
or an environmental impact statement.
Determination Under Executive Order
12866
Western has an exemption from
centralized regulatory review under
Executive Order 12866; accordingly, no
clearance of this notice by the Office of
Management and Budget is required.
Small Business Regulatory Enforcement
Fairness Act
Western has determined that this rule
is exempt from congressional
notification requirements under 5 U.S.C.
801 because the action is a rulemaking
of particular applicability relating to
rates or services and involves matters of
procedure.
Dated: June 17, 2005.
Michael S. Hacskaylo,
Administrator.
[FR Doc. 05–13010 Filed 6–30–05; 8:45 am]
BILLING CODE 6450–01–P
ENVIRONMENTAL PROTECTION
AGENCY
Availability of Information
[ER–FRL–6664–8]
All brochures, studies, comments,
letters, memorandums, and other
documents Western initiates or uses to
develop the proposed rates are available
for inspection and copying at the DSWR
office, located at 615 South 43rd
Avenue, Phoenix, Arizona. Many of
these documents and supporting
information are also available on its
Environmental Impacts Statements;
Notice of Availability
VerDate jul<14>2003
18:11 Jun 30, 2005
Jkt 205001
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements Filed 06/20/2005 Through
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
38131
06/24/2005 Pursuant to 40 CFR
1506.9.
EIS No. 20050256, Draft EIS, AFS, MT,
Beaverhear-Deerlodge National Forest
Draft Revised Land and Resource
Management Plan, Implementation,
Beaverhead, Butte-Silver Bow,
Deerlodge, Granite, Jefferson, Madison
Counties, MT, Comment Period Ends:
08/15/2005, Contact: Marty Gardner
406–683–3860.
EIS No. 20050257, Final EIS, AFS, MT,
Northeast Yaak Project, Proposed
Harvest to Reduce Fuels in Old
Growth, Implementation, Kootenai
National Forest, Three Rivers Ranger
District, Lincoln County, MT, Wait
Period Ends: 08/01/2005, Contact:
Kathy Mohar 406–295–4693.
EIS No. 20050258, Final EIS, AFS, OR,
B&B Fire Recovery Project, Proposed
Harvest of Fire-Killed Trees,
Reduction of Fuels, Planting of Tree,
Deschutes National Forest, Sisters
Ranger District, Jefferson and
Deschutes Counties, OR, Wait Period
Ends: 08/01/2005, Contact: Brent
Ralston 541–383–5784.
EIS No. 20050259, Draft EIS, FHW, NY,
Southtowns Connector/Buffalo Outer
Harbor Project, Improvements on the
NYS Route 5 Corridor from Buffalo
Skyway Bridge to NYS Route 179, in
the City of Buffalo, City of
Lackawanna and Town of Hamburg,
Erie County, NY, Comment Period
Ends: 08/15/2005, Contact: Amy
Jackson-Grove 518–431–4131.
EIS No. 20050260, Draft EIS, AFS, AK,
Scott Peak Project Area, Harvesting
Timber and Development of Road
Management, Tongrass National
Forest, Petersburg Ranger District,
Northeat of Kupreanof Island, AK ,
Comment Period Ends: 08/15/2005,
Contact: Patty Grantham 907–772–
3871.
EIS No. 20050261, Final EIS, IBR, CA,
Cental Valley Project Long-Term
Water Service Contract Renewals
-American River Division, Proposes to
Renew Long-Term Water Service
Contracts, Sacramento, Placer and El
Dorado Counties, CA, Wait Period
Ends: , 08/01/2005Contact: David
Robinson 916–989–7179.
EIS No. 20050262, Draft EIS, FHW, DC,
Klingle Road Reconstruction Project,
Reconstructing for Vehicular and
Recreational Uses, Between Porter
Street, NW and Cortland Place, NW,
Funding, Washington, DC, Comment
Period Ends: 08/15/2005, Contact:
Michael Hicks 202–219–3513.
EIS No. 20050263, Final EIS, AFS, CA,
Power Fire Restoration Project, To
Reduce Long-Term Fuel Loading for
the Purpose of Reducing Future
E:\FR\FM\01JYN1.SGM
01JYN1
38132
Federal Register / Vol. 70, No. 126 / Friday, July 1, 2005 / Notices
Severity and Resistance to Control,
Amador Ranger District, Eldorado
National Forest, Amado County,
CA,Wait Period Ends: 08/01/2005,
Contact: Patricia Ferrell 530–642–
5146.
EIS No. 20050264, Draft EIS, NPS, ID,
Minidoka Internment National
Monument (Former Minidoka
Relocation Center) , General
Management Plan, Implementation,
Jerome County, ID, Comment Period
Ends: 09/19/2005, Contact: Neil King
208–837–4793.
EIS No. 20050265, Final EIS, NPS, AZ,
Chiricahua National Monument Fire
Management Plan (FMP),
Implementation, AZ, Wait Period
Ends: 08/01/2005, Contact: Alan
Whalon 520–824–3560.
EIS No. 20050266, Draft EIS, DOE, 00,
Proposed Consolidation of Nuclear
Operations Related to Production of
radioisotope Power Systems, Located
or Planned Sites: Oak Ridge National
Laboratory (ORNL), Tennessee; Los
Alamos National Laboratory (LANL),
New Mexico; and the Idaho National
Laboratory (INL), Idaho, TN, NM, ID,
Comment Period Ends: 08/29/2005,
Contact: Timothy A. Frazier 301–903–
9420.
EIS No. 20050267, Final EIS, NRC, NM,
National Enrichment Facility (NEF),
To Construct, Operate, and
Decommission a Gas Centrifuge
Uranium Enrichment Facility, License
Application, NUREG–1790, near
Eunice, Lea County, NM, Wait Period
Ends: 08/01/2005, Contact: Melanie
Wong 301–415–6262.
EIS No. 20050268, Draft EIS, NOA, 00,
Programmatic—Codified Regulations
at 50 CFR 300 Subparts A and G
Implementing Conservation and
Management Measures Adopted by
the Commission for the Conservation
of Antarctic Marine Living Resources,
Comment Period Ends: 08/15/2005,
Contact: Robert B. Gorrell 301–713–
1193.
EIS No. 20050269, Final EIS, AFS, CA,
Freds Fire Restoration Project, To
Reduce Long-Term Fuel Loading for
the Purpose of Reducing Future Fire
Severity and Resistance to Control,
Eldorado National Forest, El Dorado
County, CA, Wait Period Ends: 08/01/
2005, Contact: Laura Hierholzer 530–
647–53892.
EIS No. 20050270, Final EIS, NRC, AL,
Generic—License Renewal of Nuclear
Plants for Browns Ferry, Unit 1, 2 and
33 (TAC Nos. MC7168, MC1769, and
MC1770), Supplement 21 to NUREG–
1437, Implementation, Athens, AL,
Wait Period Ends: 08/01/2005,
Contact: Dr. Michael Masnik 301–
415–1191.
VerDate jul<14>2003
18:11 Jun 30, 2005
Jkt 205001
EIS No. 20050271, Final EIS, AFS, MT,
Gallatin National Forest Noxious and
Invasive Weed Control Project, To
Prevent and Reduce Loss of Native
Plant, Bozeman, Carbon, Madison,
Gallatin, Meagher, Park, and Sweet
Grass Counties, MT, Wait Period
Ends: 08/01/2005, Contact: Susan
LaMont 406–823–6976.
EIS No. 20050272, Final EIS, NRS, OR,
Williamson River Delta Restoration
Project, To Restore and Maintain the
Ecological Functions of the Delta,
Williamson River, Klamath County,
OR, Wait Period Ends: 08/01/2005,
Contact: Kevin Conroy 541–883–6924,
Ext 115.
EIS No. 20050273, Final EIS, AFS, ID,
Porcupine East, 9 Allotment Grazing
Analysis Project, Authorizing
Livestock Grazing, Caribou-Targhee
National Forest, Dubois Ranger
District, Cenntenial Mountains, Clark
County, ID, Wait Period Ends: 08/01/
2005, Contact: Shane Q. Jacobson
208–374–5422.
Dated: June 28, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 05–13044 Filed 6–30–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6664–9]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act, as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7167.
An explanation of the ratings assigned
to draft environmental impact
statements (EISs) was published in the
Federal Register dated April 1, 2005 (70
FR 16815).
Draft EISs
EIS No. 20050005, ERP No. D–BLM–
J65436–UT, Vernal Field Office
Resource Management Plan, To
Revise and Integrate the Book Cliff
and Diamond Mountain Resource
Management Plan, Daggett, Duchesne,
Uintah and Grand Counties, UT.
Summary: EPA expressed
environmental concerns about potential
adverse impacts to air quality, and
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
recommended that a revised cumulative
air quality analysis, including other
reasonably foreseeable projects,
especially on Uintah and Ouray
Reservations be completed. Rating EC2.
EIS No. 20050044, ERP No. D–BLM–
J02047–WY, Jonah Infill Drilling
Project, Propose to Expand
Development of Natural Gas Drilling,
Sublette County, WY.
Summary: EPA expressed concerns
because decreased well spacing will
result in significant impacts to:
vegetation from removal or compaction;
surface water quality from soil erosion;
wildlife from habitat destruction; and
fragmentation without providing
specific approaches to maintain
ecosystem viability. In addition, there is
a potential for wetlands impacts from
surface activities located in playas. EPA
recommends phased development based
on geographic considerations and
potential impacts and identification of
mitigation for significant impacts.
However, EPA’s rating of the proposed
action/EIS had been deferred until it has
the opportunity to review supplemental
air quality information that BLM has
committed to develop and solicit
comment on in advance of the release of
the Final EIS.
EIS No. 20050059, ERP No. D–NPS–
D40329–VA, Manassas National
Battlefield Park Bypass Study, From
U.S.–29 East of Park Boundary and
VA–234 South of Park Boundary to
U.S. 29 West of Park Boundary and
VA–234 North of Park Boundary, US
Army COE Section 404 Permit, Prince
William and Fairfax Counties, VA.
Summary: EPA expressed
environmental concerns about potential
impacts to, wetlands, streams, riparian
areas, resource protection areas and
Section 4(f) protected parkland. EPA
requested that the Final EIS address
cumulative impacts to aquatic and
historic resources. Rating EC2.
EIS No. 20050144, ERP No. D–FHW–
F40430–IN, US–31 Kokomo Corridor
Project, Transportation Improvement
between IN–26 and U.S. 35 Northern
Junction, City of Kokomo and Center
Township, Howard and Tipton
Counties, IN.
Summary: EPA has environmental
concerns due to potential adverse
impacts to wetlands, streams/water
quality, drinking water supplies, upland
forest and wildlife habitat. Rating EC2.
EIS No. 20050149, ERP No. D–FHW–
F40432–WI, U.S. 41 Highway Corridor
Project, Transportation Improvement
between the Cities of Oconto and
Peshtigo, Funding, Marinette and
Oconto Counties, WI.
E:\FR\FM\01JYN1.SGM
01JYN1
Agencies
[Federal Register Volume 70, Number 126 (Friday, July 1, 2005)]
[Notices]
[Pages 38131-38132]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-13044]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6664-8]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements Filed 06/20/2005
Through 06/24/2005 Pursuant to 40 CFR 1506.9.
EIS No. 20050256, Draft EIS, AFS, MT, Beaverhear-Deerlodge National
Forest Draft Revised Land and Resource Management Plan, Implementation,
Beaverhead, Butte-Silver Bow, Deerlodge, Granite, Jefferson, Madison
Counties, MT, Comment Period Ends: 08/15/2005, Contact: Marty Gardner
406-683-3860.
EIS No. 20050257, Final EIS, AFS, MT, Northeast Yaak Project, Proposed
Harvest to Reduce Fuels in Old Growth, Implementation, Kootenai
National Forest, Three Rivers Ranger District, Lincoln County, MT, Wait
Period Ends: 08/01/2005, Contact: Kathy Mohar 406-295-4693.
EIS No. 20050258, Final EIS, AFS, OR, B&B Fire Recovery Project,
Proposed Harvest of Fire-Killed Trees, Reduction of Fuels, Planting of
Tree, Deschutes National Forest, Sisters Ranger District, Jefferson and
Deschutes Counties, OR, Wait Period Ends: 08/01/2005, Contact: Brent
Ralston 541-383-5784.
EIS No. 20050259, Draft EIS, FHW, NY, Southtowns Connector/Buffalo
Outer Harbor Project, Improvements on the NYS Route 5 Corridor from
Buffalo Skyway Bridge to NYS Route 179, in the City of Buffalo, City of
Lackawanna and Town of Hamburg, Erie County, NY, Comment Period Ends:
08/15/2005, Contact: Amy Jackson-Grove 518-431-4131.
EIS No. 20050260, Draft EIS, AFS, AK, Scott Peak Project Area,
Harvesting Timber and Development of Road Management, Tongrass National
Forest, Petersburg Ranger District, Northeat of Kupreanof Island, AK ,
Comment Period Ends: 08/15/2005, Contact: Patty Grantham 907-772-3871.
EIS No. 20050261, Final EIS, IBR, CA, Cental Valley Project Long-Term
Water Service Contract Renewals -American River Division, Proposes to
Renew Long-Term Water Service Contracts, Sacramento, Placer and El
Dorado Counties, CA, Wait Period Ends: , 08/01/2005Contact: David
Robinson 916-989-7179.
EIS No. 20050262, Draft EIS, FHW, DC, Klingle Road Reconstruction
Project, Reconstructing for Vehicular and Recreational Uses, Between
Porter Street, NW and Cortland Place, NW, Funding, Washington, DC,
Comment Period Ends: 08/15/2005, Contact: Michael Hicks 202-219-3513.
EIS No. 20050263, Final EIS, AFS, CA, Power Fire Restoration Project,
To Reduce Long-Term Fuel Loading for the Purpose of Reducing Future
[[Page 38132]]
Severity and Resistance to Control, Amador Ranger District, Eldorado
National Forest, Amado County, CA,Wait Period Ends: 08/01/2005,
Contact: Patricia Ferrell 530-642-5146.
EIS No. 20050264, Draft EIS, NPS, ID, Minidoka Internment National
Monument (Former Minidoka Relocation Center) , General Management Plan,
Implementation, Jerome County, ID, Comment Period Ends: 09/19/2005,
Contact: Neil King 208-837-4793.
EIS No. 20050265, Final EIS, NPS, AZ, Chiricahua National Monument Fire
Management Plan (FMP), Implementation, AZ, Wait Period Ends: 08/01/
2005, Contact: Alan Whalon 520-824-3560.
EIS No. 20050266, Draft EIS, DOE, 00, Proposed Consolidation of Nuclear
Operations Related to Production of radioisotope Power Systems, Located
or Planned Sites: Oak Ridge National Laboratory (ORNL), Tennessee; Los
Alamos National Laboratory (LANL), New Mexico; and the Idaho National
Laboratory (INL), Idaho, TN, NM, ID, Comment Period Ends: 08/29/2005,
Contact: Timothy A. Frazier 301-903-9420.
EIS No. 20050267, Final EIS, NRC, NM, National Enrichment Facility
(NEF), To Construct, Operate, and Decommission a Gas Centrifuge Uranium
Enrichment Facility, License Application, NUREG-1790, near Eunice, Lea
County, NM, Wait Period Ends: 08/01/2005, Contact: Melanie Wong 301-
415-6262.
EIS No. 20050268, Draft EIS, NOA, 00, Programmatic--Codified
Regulations at 50 CFR 300 Subparts A and G Implementing Conservation
and Management Measures Adopted by the Commission for the Conservation
of Antarctic Marine Living Resources, Comment Period Ends: 08/15/2005,
Contact: Robert B. Gorrell 301-713-1193.
EIS No. 20050269, Final EIS, AFS, CA, Freds Fire Restoration Project,
To Reduce Long-Term Fuel Loading for the Purpose of Reducing Future
Fire Severity and Resistance to Control, Eldorado National Forest, El
Dorado County, CA, Wait Period Ends: 08/01/2005, Contact: Laura
Hierholzer 530-647-53892.
EIS No. 20050270, Final EIS, NRC, AL, Generic--License Renewal of
Nuclear Plants for Browns Ferry, Unit 1, 2 and 33 (TAC Nos. MC7168,
MC1769, and MC1770), Supplement 21 to NUREG-1437, Implementation,
Athens, AL, Wait Period Ends: 08/01/2005, Contact: Dr. Michael Masnik
301-415-1191.
EIS No. 20050271, Final EIS, AFS, MT, Gallatin National Forest Noxious
and Invasive Weed Control Project, To Prevent and Reduce Loss of Native
Plant, Bozeman, Carbon, Madison, Gallatin, Meagher, Park, and Sweet
Grass Counties, MT, Wait Period Ends: 08/01/2005, Contact: Susan LaMont
406-823-6976.
EIS No. 20050272, Final EIS, NRS, OR, Williamson River Delta
Restoration Project, To Restore and Maintain the Ecological Functions
of the Delta, Williamson River, Klamath County, OR, Wait Period Ends:
08/01/2005, Contact: Kevin Conroy 541-883-6924, Ext 115.
EIS No. 20050273, Final EIS, AFS, ID, Porcupine East, 9 Allotment
Grazing Analysis Project, Authorizing Livestock Grazing, Caribou-
Targhee National Forest, Dubois Ranger District, Cenntenial Mountains,
Clark County, ID, Wait Period Ends: 08/01/2005, Contact: Shane Q.
Jacobson 208-374-5422.
Dated: June 28, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 05-13044 Filed 6-30-05; 8:45 am]
BILLING CODE 6560-50-P