Trunkline LNG Company, LLC; Notice of Amendment, 37808-37809 [E5-3427]
Download as PDF
37808
Federal Register / Vol. 70, No. 125 / Thursday, June 30, 2005 / Notices
154.210) on or before the below listed
comment date. Anyone filing an
intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission strongly encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible online at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: July 1, 2005.
Magalie R. Salas,
Secretary.
Appendix A—Trunkline LNG
Company, LLC; Tariff Sheets Filed June
16, 2005; Proposed To Be Effective July
20, 2005; All to FERC Gas Tariff
Second Revised Volume No. 1–A
First Revised Sheet No. 1
Third Revised Sheet No.2
Fifth Revised Sheet No. 5
Original Sheet No. 30
Original Sheet No. 31
Original Sheet No. 32
Original Sheet No. 33
Original Sheet No. 34
Original Sheet No. 35
Original Sheet No. 36
Sheet Nos. 37–49
First Revised Sheet No. 70
First Revised Sheet No. 71
First Revised Sheet No. 78
First Revised Sheet No. 89
First Revised Sheet No. 123
First Revised Sheet No. 125
First Revised Sheet No. 166
Original Sheet No. 182
Original Sheet No. 183
Original Sheet No. 184
Original Sheet No. 185
Original Sheet No. 186
Original Sheet No. 187
Original Sheet No. 188
Original Sheet No. 189
Original Sheet No. 190
Original Sheet No. 191
Original Sheet No. 192
VerDate jul<14>2003
16:26 Jun 29, 2005
Jkt 205001
Original Sheet No. 193
Original Sheet No. 194
Original Sheet No. 195
Original Sheet No. 196
[FR Doc. E5–3415 Filed 6–29–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Federal Energy Regulatory
Commission
Magalie R. Salas,
Secretary.
[FR Doc. E5–3420 Filed 6–29–05; 8:45 am]
[Docket No. RP01–229–002]
BILLING CODE 6717–01–P
Trunkline LNG Company, LLC; Notice
of Negotiated Rate
DEPARTMENT OF ENERGY
June 21, 2005.
Federal Energy Regulatory
Commission
Take notice that on June 16, 2005,
Trunkline LNG Company, LLC
(Trunkline LNG) tendered for filing, as
part of its FERC Gas Tariff, Second
Revised Volume No. 1–A, First Revised
Sheet No. 6, to become effective July 20,
2005.
Trunkline LNG states that the purpose
of this filing is to reflect the
implementation of a new negotiated rate
transaction.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
PO 00000
Frm 00064
Fmt 4703
Sfmt 4703
[Docket No. CP02–60–005]
Trunkline LNG Company, LLC; Notice
of Amendment
June 21, 2005
Take notice that on June 16, 2005,
Trunkline LNG Company, LLC
(Trunkline LNG), PO Box 4967,
Houston, Texas 77210–4967, filed in
Docket No. CP02–60–005 an abbreviated
application pursuant to the Natural Gas
Act (NGA) to establish an interim initial
rate to provide interim vaporization
capacity under Rate Schedule FTS–2 by
July 20, 2005, all as more fully set forth
in the application, which is open to the
public for inspection. The filing is
available for review in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
filed to access the document. For
assistance, please contact FERC Online
Support at FERConlineSupport@ferc.gov
or toll-free at (866) 208–3676, or for
TTY, contact (202) 502–8659.
Any questions regarding this
application may be directed to William
W. Grygar, Vice President, Rates and
Regulatory Affairs, at (713) 989–7000,
Trunkline LNG Company, LLC, 5444
Westheimer Road, Houston, Texas
77056.
Trunkline LNG seeks Commission
authorization to place certain LNG
vaporization facilities into service as
soon as their successful construction,
completion and testing will allow. The
additional interim vaporization capacity
will permit BG LNG Services, LLC (BG
LNG) to increase their sendout at
Trunkline LNG’s LNG terminal from
630,000 Mcf per day to 1,200,000 Mcf
per day. This increased sendout will
allow BG LNG additional flexibility to
schedule its LNG cargoes for the
remainder of 2005. The remainder of the
E:\FR\FM\30JNN1.SGM
30JNN1
Federal Register / Vol. 70, No. 125 / Thursday, June 30, 2005 / Notices
facilities approved by the Commission,
the LNG storage tank and the layberth,
continue to be scheduled for completion
as originally contemplated. Trunkline
LNG requests that the Commission
approve the proposed interim Cost of
Service and Derivation of Rates in order
to provide the interim vaporization
capacity to BG LNG.
Any person wishing to obtain legal
status by becoming a party to the
proceedings for this project should, on
or before the below listed comment
date, file with the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426, a
motion to intervene in accordance with
the requirements of the Commission’s
Rules of Practice and Procedure (18 CFR
385.214 or 385.211) and the Regulations
under the NGA (18 CFR 157.10). A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies of all documents
filed by the applicant and by all other
parties. A party must submit 14 copies
of filings made with the Commission
and must mail a copy to the applicant
and to every other party in the
proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
Motions to intervene, protests and
comments may be filed electronically
via the Internet in lieu of paper, see, 18
CFR 385.2001 (a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings.
Comment Date: July 1, 2005.
Magalie R. Salas,
Secretary.
[FR Doc. E5–3427 Filed 6–29–05; 8:45 am]
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed on or before
the date as indicated below. Anyone
filing a protest must serve a copy of that
document on all the parties to the
proceeding.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on June 28, 2005.
Magalie R. Salas,
Secretary.
[FR Doc. E5–3422 Filed 6–29–05; 8:45 am]
37809
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed on or before
the date as indicated below. Anyone
filing a protest must serve a copy of that
document on all the parties to the
proceeding.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on June 28, 2005.
Magalie R. Salas,
Secretary.
[FR Doc. E5–3426 Filed 6–29–05; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Non-Project
Use of Project Lands and Waters and
Soliciting Comments, Motions To
Intervene, and Protests
[Docket No. RP05–199–001]
Federal Energy Regulatory
Commission
[Docket No. RP05–199–001]
Williston Basin Interstate Pipeline
Company; Notice of Compliance Filing
and Refund Report
Williston Basin Interstate Pipeline
Company; Notice of Compliance Filing
and Refund Report
June 21, 2005.
June 21, 2005.
Take notice that on June 17, 2005,
Williston Basin Interstate Pipeline
Company (Williston Basin) tendered for
filing as part of its FERC Gas Tariff,
Original Volume No. 2, the tariff sheets
listed on Attachment A to the filing, in
compliance with the Commission’s
Order issued March 30, 2005 in Docket
No. RP05–199–000.
VerDate jul<14>2003
16:26 Jun 29, 2005
Jkt 205001
Take notice that on June 17, 2005,
Williston Basin Interstate Pipeline
Company (Williston Basin) tendered for
filing as part of its FERC Gas Tariff,
Original Volume No. 2, the tariff sheets
listed on Attachment A to the filing, in
compliance with the Commission’s
Order issued March 30, 2005 in Docket
No. RP05–199–000.
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
PO 00000
Frm 00065
Fmt 4703
Sfmt 4703
June 21, 2005.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Non-Project Use
of Project Lands and Waters.
b. Project No.: 1984–119.
c. Date Filed: June 6, 2005.
d. Applicant: Wisconsin River Power
Company.
e. Name of Project: Petenwell and
Castle Rock Hydroelectric Project.
f. Location: The proposed
development is located on the
Wisconsin River in Adams County,
E:\FR\FM\30JNN1.SGM
30JNN1
Agencies
[Federal Register Volume 70, Number 125 (Thursday, June 30, 2005)]
[Notices]
[Pages 37808-37809]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-3427]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP02-60-005]
Trunkline LNG Company, LLC; Notice of Amendment
June 21, 2005
Take notice that on June 16, 2005, Trunkline LNG Company, LLC
(Trunkline LNG), PO Box 4967, Houston, Texas 77210-4967, filed in
Docket No. CP02-60-005 an abbreviated application pursuant to the
Natural Gas Act (NGA) to establish an interim initial rate to provide
interim vaporization capacity under Rate Schedule FTS-2 by July 20,
2005, all as more fully set forth in the application, which is open to
the public for inspection. The filing is available for review in the
Public Reference Room or may be viewed on the Commission's Web site at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number filed to
access the document. For assistance, please contact FERC Online Support
at FERConlineSupport@ferc.gov or toll-free at (866) 208-3676, or for
TTY, contact (202) 502-8659.
Any questions regarding this application may be directed to William
W. Grygar, Vice President, Rates and Regulatory Affairs, at (713) 989-
7000, Trunkline LNG Company, LLC, 5444 Westheimer Road, Houston, Texas
77056.
Trunkline LNG seeks Commission authorization to place certain LNG
vaporization facilities into service as soon as their successful
construction, completion and testing will allow. The additional interim
vaporization capacity will permit BG LNG Services, LLC (BG LNG) to
increase their sendout at Trunkline LNG's LNG terminal from 630,000 Mcf
per day to 1,200,000 Mcf per day. This increased sendout will allow BG
LNG additional flexibility to schedule its LNG cargoes for the
remainder of 2005. The remainder of the
[[Page 37809]]
facilities approved by the Commission, the LNG storage tank and the
layberth, continue to be scheduled for completion as originally
contemplated. Trunkline LNG requests that the Commission approve the
proposed interim Cost of Service and Derivation of Rates in order to
provide the interim vaporization capacity to BG LNG.
Any person wishing to obtain legal status by becoming a party to
the proceedings for this project should, on or before the below listed
comment date, file with the Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426, a motion to intervene in
accordance with the requirements of the Commission's Rules of Practice
and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the
NGA (18 CFR 157.10). A person obtaining party status will be placed on
the service list maintained by the Secretary of the Commission and will
receive copies of all documents filed by the applicant and by all other
parties. A party must submit 14 copies of filings made with the
Commission and must mail a copy to the applicant and to every other
party in the proceeding. Only parties to the proceeding can ask for
court review of Commission orders in the proceeding.
Motions to intervene, protests and comments may be filed
electronically via the Internet in lieu of paper, see, 18 CFR 385.2001
(a)(1)(iii) and the instructions on the Commission's Web site under the
``e-Filing'' link. The Commission strongly encourages electronic
filings.
Comment Date: July 1, 2005.
Magalie R. Salas,
Secretary.
[FR Doc. E5-3427 Filed 6-29-05; 8:45 am]
BILLING CODE 6717-01-P