Baltimore Gas and Electric Company; Constellation Power Source Generation, Inc.; Calvert Cliffs Nuclear Power Plant, Inc.; Constellation Energy Commodities Group, Inc. (f/k/a Constellation Power Source, Inc.); Handsome Lake Energy, LLC; University Park Energy, LLC; Holland Energy, LLC; Wolf Hills Energy, LLC; Big Sandy Peaker Plant, LLC; Nine Mile Point Nuclear Station, LLC; High Desert Power Project, LLC; Oleander Power Project, Limited Partnership; Constellation NewEnergy, Inc.; Constellation Energy Commodities Group Maine, LLC; (f/k/a Constellation Power Source Maine, LLC); Power Provider LLC; R.E. Ginna Nuclear Power Plant, LLC; Notice of Filing, 37381 [E5-3391]
Download as PDF
Federal Register / Vol. 70, No. 124 / Wednesday, June 29, 2005 / Notices
Requirement for Change in Status for
Public Utilities with Market-Based Rate
Authority, Order No. 652, 70 FR 8253,
FERC Stats & Regs ¶ 31,175 (Feb. 18,
2005). In addition, Constellation states
that it is adding Oleander Power Project,
Limited Partnership to the case caption
that was omitted from the May 2, 2005,
filing.
Constellation states that copies of this
notification were served upon all
persons on the service lists in the abovecaptioned dockets.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. eastern
time on the specified comment date. It
Linda Mitry,
is not necessary to separately intervene
Deputy Secretary.
again in a subdocket related to a
[FR Doc. E5–3373 Filed 6–28–05; 8:45 am]
compliance filing if you have previously
BILLING CODE 6717–01–P
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
DEPARTMENT OF ENERGY
be taken, but will not serve to make
protestants parties to the proceeding.
Federal Energy Regulatory
Anyone filing a motion to intervene or
Commission
protest must serve a copy of that
[ER99–2948–005; ER00–2918–004; ER00–
document on the Applicant. In reference
2917–004; ER97–2261–001; ER01–556–003;
to filings initiating a new proceeding,
ER01–557–003; ER01–558–003; ER01–559–
003; ER01–560–003; ER01–1654–006; ER01– interventions or protests submitted on
2641–004; ER00–3240–004; ER02–2567–004; or before the comment deadline need
ER02–699–001; ER01–1949–004; ER04–485– not be served on persons other than the
001]
applicant.
The Commission encourages
Baltimore Gas and Electric Company;
electronic submission of protests and
Constellation Power Source
interventions in lieu of paper, using the
Generation, Inc.; Calvert Cliffs Nuclear
FERC Online links at https://
Power Plant, Inc.; Constellation Energy
www.ferc.gov. To facilitate electronic
Commodities Group, Inc. (f/k/a
service, persons with Internet access
Constellation Power Source, Inc.);
who will eFile a document and/or be
Handsome Lake Energy, LLC;
listed as a contact for an intervenor
University Park Energy, LLC; Holland
must create and validate an
Energy, LLC; Wolf Hills Energy, LLC;
eRegistration account using the
Big Sandy Peaker Plant, LLC; Nine Mile
eRegistration link. Select the eFiling
Point Nuclear Station, LLC; High
link to log on and submit the
Desert Power Project, LLC; Oleander
intervention or protests.
Power Project, Limited Partnership;
Persons unable to file electronically
Constellation NewEnergy, Inc.;
should submit an original and 14 copies
Constellation Energy Commodities
of the intervention or protest to the
Group Maine, LLC; (f/k/a Constellation
Federal Energy Regulatory Commission,
Power Source Maine, LLC); Power
888 First Street, NE., Washington, DC
Provider LLC; R.E. Ginna Nuclear
20426.
Power Plant, LLC; Notice of Filing
The filing in the above proceeding is
May 26, 2005.
accessible in the Commission’s eLibrary
system. It is also available for review in
Take notice that on May 23, 2005,
the Commission’s Public Reference
Constellation Energy Group, Inc.,
Room in Washington, DC. There is an
(Constellation) submitted for filing a
eSubscription link on the Web site that
supplement to its May 2, 2005, Notice
of Change in Status filing. Constellation enables subscribers to receive e-mail
notification when a document is added
states that the purpose of this filing is
to a subscribed docket(s). For assistance
to supplement the May 2, 2005, filing
with any FERC Online service, please ewith the addition of the revised tariff
mail FERCOnlineSupport@ferc.gov or
sheets of Baltimore Gas and Electric
call (866) 208–3676 (toll free). For TTY,
Company to comply with the
Commission’s Order No. 652 (Reporting call (202) 502–8659.
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
The filing in the above proceeding is
accessible in the Commission’s eLibrary
system. It is also available for review in
the Commission’s Public Reference
Room in Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please email FERCOnlineSupport@ferc.gov or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5 p.m. eastern time on
June 27, 2005.
VerDate jul<14>2003
17:40 Jun 28, 2005
Jkt 205001
PO 00000
Frm 00061
Fmt 4703
Sfmt 4703
37381
Comment Date: 5 p.m. on June 13,
2005.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–3391 Filed 6–28–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
June 22, 2005.
Take notice that the Commission
received the following electric rate
filings.
Docket Numbers: ER00–980–012.
Applicants: Bangor Hydro-Electric
Company.
Description: Bangor Hydro-Electric
Company, pursuant to the settlement
agreement filed on 11/1/00 and the
Commission’s order issued 2/26/01,
submits an informational filing showing
the implementation of their formula rate
for the charges that became effective 6/
1/05.
Filed Date: 06/15/2005.
Accession Number: 20050621–0226.
Comment Date: 5 p.m. eastern time on
Wednesday, July 6, 2005.
Docket Numbers: ER00–1053–015.
Applicants: Maine Public Service
Company.
Description: Maine Public Service
Company, pursuant to the settlement
agreement filed on 2/11/04 and the
Commission’s order issued 4/1/04,
submits its informational filing setting
forth the changed open access
transmission tariff charges with an
effective date of 6/1/05 together with
back-up materials.
Filed Date: 06/15/2005.
Accession Number: 20050621–0225.
Comment Date: 5 p.m. eastern time on
Wednesday, July 6, 2005.
Docket Numbers: ER00–3614–004.
Applicants: BP Energy Company.
Description: BP Energy Company
submits an updated market analysis .
Filed Date: 06/17/2005.
Accession Number: 20050621–0001.
Comment Date: 5 p.m. eastern time on
Friday, July 8, 2005.
Docket Numbers: ER05–1121–000.
Applicants: Aquila Inc.
Description: Aquila, Inc. submits an
Incremental Energy Agreement between
Aquila Networds-WPK and the City of
Beloit, Kansas, dated 6/7/05 and
designated as FERC Electric Rate
Schedule 131.
Filed Date: 06/17/2005.
Accession Number: 20050621–0011.
E:\FR\FM\29JNN1.SGM
29JNN1
Agencies
[Federal Register Volume 70, Number 124 (Wednesday, June 29, 2005)]
[Notices]
[Page 37381]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-3391]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[ER99-2948-005; ER00-2918-004; ER00-2917-004; ER97-2261-001; ER01-556-
003; ER01-557-003; ER01-558-003; ER01-559-003; ER01-560-003; ER01-1654-
006; ER01-2641-004; ER00-3240-004; ER02-2567-004; ER02-699-001; ER01-
1949-004; ER04-485-001]
Baltimore Gas and Electric Company; Constellation Power Source
Generation, Inc.; Calvert Cliffs Nuclear Power Plant, Inc.;
Constellation Energy Commodities Group, Inc. (f/k/a Constellation Power
Source, Inc.); Handsome Lake Energy, LLC; University Park Energy, LLC;
Holland Energy, LLC; Wolf Hills Energy, LLC; Big Sandy Peaker Plant,
LLC; Nine Mile Point Nuclear Station, LLC; High Desert Power Project,
LLC; Oleander Power Project, Limited Partnership; Constellation
NewEnergy, Inc.; Constellation Energy Commodities Group Maine, LLC; (f/
k/a Constellation Power Source Maine, LLC); Power Provider LLC; R.E.
Ginna Nuclear Power Plant, LLC; Notice of Filing
May 26, 2005.
Take notice that on May 23, 2005, Constellation Energy Group, Inc.,
(Constellation) submitted for filing a supplement to its May 2, 2005,
Notice of Change in Status filing. Constellation states that the
purpose of this filing is to supplement the May 2, 2005, filing with
the addition of the revised tariff sheets of Baltimore Gas and Electric
Company to comply with the Commission's Order No. 652 (Reporting
Requirement for Change in Status for Public Utilities with Market-Based
Rate Authority, Order No. 652, 70 FR 8253, FERC Stats & Regs ] 31,175
(Feb. 18, 2005). In addition, Constellation states that it is adding
Oleander Power Project, Limited Partnership to the case caption that
was omitted from the May 2, 2005, filing.
Constellation states that copies of this notification were served
upon all persons on the service lists in the above-captioned dockets.
Any person desiring to intervene or to protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214) on or before 5 p.m. eastern time on the specified comment
date. It is not necessary to separately intervene again in a subdocket
related to a compliance filing if you have previously intervened in the
same docket. Protests will be considered by the Commission in
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Anyone filing a motion to
intervene or protest must serve a copy of that document on the
Applicant. In reference to filings initiating a new proceeding,
interventions or protests submitted on or before the comment deadline
need not be served on persons other than the applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426.
The filing in the above proceeding is accessible in the
Commission's eLibrary system. It is also available for review in the
Commission's Public Reference Room in Washington, DC. There is an
eSubscription link on the Web site that enables subscribers to receive
e-mail notification when a document is added to a subscribed docket(s).
For assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov or call (866) 208-3676 (toll free). For TTY,
call (202) 502-8659.
Comment Date: 5 p.m. on June 13, 2005.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-3391 Filed 6-28-05; 8:45 am]
BILLING CODE 6717-01-P