Environmental Impacts Statements; Notice of Availability, 35250-35251 [05-12014]

Download as PDF 35250 Federal Register / Vol. 70, No. 116 / Friday, June 17, 2005 / Notices and requested additional information regarding the selection of evaluation criteria, cumulative impacts to injured resources, and impacts to endangered species. Rating EC2. EIS No. 20050143, ERP No. D–FHW– G40184–00, I–69 Corridor—Section of Independent Utility (SIU) No. 14, Construction from Junction 1–20 near Haughton, LA to U.S. 82 near EL Dorado, AR, Bossier, Claiborne and Webster Parishes, LA and Columbia and Union Counties, AR. Summary: EPA has no objections to the project as proposed. Rating LO. EIS No. 20050158, ERP No. D–AFS– L65482–ID, Aspen Range Timber Sale and Vegetation Treatment Project, Proposal to Treat Forested and Nonforested Vegetation, CaribouTarghee National Forest, Soda Springs Ranger District, Caribou County, ID. Summary: EPA expressed environmental concerns about potential adverse impacts to surface water quality and habitat from sediment produced from roads, and silviculture activities, and recommends conducting timber harvest during winter months and applying BMPs immediately after harvest. Rating EC2. Final EISs EIS No. 20050125, ERP No. F–NPS– E61074–00, Big South Fork National River and Recreation Area, General Management Plan, Implementation, Resources, Roads and Trails, McCreary, Ky and Fentress, Morgan, Pickett and Scott Counties, TN. Summary: EPA has no objections to the project as proposed. EIS No. 20050171, ERP No. F–AFS– K65256–NV, Jarbidge Canyon Project, Road Management Plan, Implementation, Water Projects Construction along CharlestonJarbidge Road and South Canyon Road Reconstruction, HumboltToiyabe National Forest, Jarbidge Ranger District, Elko County, NV. Summary: The Final EIS was responsive to the primary objections raised on the Draft EIS on CWA Section 404-issues and water quality mitigation. EPA continues to have concerns about the Selected Alternative due to its presence within the flood plain and low-water crossings. EPA recommended additional water quality mitigation measures and strong enforcement of both seasonal use and the forest closure order. EIS No. 20050172, ERP No. F–NRC– G06013–AR, Generic—License Renewal of Nuclear Plants, Arkansas Nuclear One, Unit 2 (Tac. Nos. MB VerDate jul<14>2003 17:59 Jun 16, 2005 Jkt 205001 8405) Supplement 19 to NUREG– 1437, Operating License Renewal, Pope County, AR. Summary: No formal comment letter was sent to the preparing agency. EIS No. 20050183, ERP No. F–NOA– K91013–HI, Seabird Interaction Mitigation Methods, To Reduce Interaction with Seabird in HawaiiBased Longline Fishery and Pelagic Squid Fishery Management, to Establish an Effective Management Framework for Pelagic Squid Fisheries, Fishery Management Plan, Pelagic Fisheries of the Western Pacific Region, Exclusive Economic Zone of the U.S. and High Sea, HI. Summary: EPA’s concerns have been addressed with the creation of a new seabird action preferred alternative in the FEIS; therefore, EPA has no objections to the proposed action. EIS No. 20050184, ERP No. F–NOA– L91021–AK, Essential Fish Habitat Identification and Conservation, Implementation, North Pacific Fishery Management Council, MagnusonStevens Fishery Conservation and Management Act, AK. Summary: EPA continues to express concerns about rescinding HAPC status without appropriate evaluation. Dated: June 14, 2005. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 05–12013 Filed 6–16–05; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6664–4] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 06/06/2005 Through 06/10/2005 Pursuant to 40 CFR 1506.9. EIS No. 20050231, Draft EIS, AFS, MT, Gallatin National Forest, Proposed Travel Management Plan, Implementation, Forest Land and Resource Management, Madison, Gallatin, Park, Meagher, Sweetgrass and Carbon Counties, MT, Comment Period Ends: 08/01/2005, Contact: Steve Christiansen 406–587–6750. EIS No. 20050232, Final EIS, FHW, OR, Newberg-Dundee Transportation Improvement Project, (TEA 21 Prog. PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 #37), Proposal to Relieve Congestion on OR–9W through the Cities of Newberg and Dundee, Bypass Element Location (Tier 1), Yamhill County, OR, Wait Period Ends: 07/18/ 2005, Contact: Alan J. Fox 503–986– 2681. EIS No. 20050233, Final EIS, FHW, MI, I–75 from M–102 to M–59 Proposed Widening and Reconstruction, Transportation Improvements, Funding, NPDES Permit and U.S. Army COE Section 404 Permit, Oakland County, MI, Wait Period Ends: 08/05/2005, Contact: Abdelmoez Abdalla 517–702–1820. EIS No. 20050234, Draft EIS, FHW, LA, Interstate 69, Section of Independent Utility (SIU) 15 Project, Construct between U.S. Highway 171 near the Town of Stonewall in DeSoto Parish, and Interstate Highway 20 (I–20) near the Town of Haughton in Bossier Parish, LA, Comment Period Ends: 08/01/2005, Contact: William C. Farr 225–757–7615. EIS No. 20050235, Draft EIS, NPS, IN, Lincoln Boyhood National Memorial General Management Plan, Implementation, Lincoln City, Spencer County, IN, Comment Period Ends: 08/16/2005, Contact: Nick Chevance 402–661–1844. EIS No. 20050236, Draft EIS, AFS, MT, Rocky Mountain Ranger District Travel Management Plan, Proposes to Change the Management of Motorized and Non-Motorized Travel, Lewis and Clark National Forest, Glacier, Pondera, Teton and Lewis and Clark Counties, MT, Comment Period Ends: 08/16/2005, Contact: Dick Schwecke 406–791–7700. EIS No. 20050237, Final EIS, NOA, 00, Bottomfish and Seamount Groundfish Fisheries Conservation and Management Plan, Implementation, U.S. Economic Zone (EEZ) around the State of Hawaii, Territories of Samoa and Guam, Commonwealth of the Northern Mariana and various Islands and Atolls known as the U.S. Pacific remove Island areas, HI, GU and AS, Wait Period Ends: 07/18/2005, Contact: William Robinson 808–973– 2937. EIS No. 20050238, Final EIS, AFS, UT, Monticello and Blanding Municipal Watershed Improvement Projects, Implementation, Manti-La Sal National Forest, Monticello Ranger District, San Juan County, UT, Wait Period Ends: 07/18/2005, Contact: Greg Montgomery 435–636–3348. EIS No. 20050239, Draft EIS, CGD, 00, Main Pass Energy HUB Deepwater Port License Application, Proposes to Construct a Deepwater Port and Associated Anchorages, U.S. Army E:\FR\FM\17JNN1.SGM 17JNN1 Federal Register / Vol. 70, No. 116 / Friday, June 17, 2005 / Notices COE Section 10 and 404 Permit, Gulf of Mexico (GOM), southeast of the coast of Louisiana in Main Pass Lease Block (MP) 299 and from the Mississippi coast in MP 164, Comment Period Ends: 08/01/2005, Contact: Mark Prescott 202–267–0225. EIS No. 20050240, Draft Supplement, FTA, MA, Silver Line Phase III (previously known as South Boston Pier) Project, Updated Information to Physically Integrate Silver Line Phase I and II, Massachusetts Bay Transportation Authority’s, Funding, MA, Comment Period Ends: 08/08/ 2005, Contact: Andrew Brennan 617– 222–3126. EIS No. 20050241, Final EIS, BLM, 00, Programmatic EIS—Proposed Revision to Grazing Regulations for the Public Lands, 42 CFR Part 4100, in the Western Portion of the United States, Wait Period Ends: 07/18/2005, Contact: Bud Cribley 202–785–6569. EIS No. 20050242, Final EIS, FRC, TX, Ingleside Energy Center Liquefied Natural Gas (LNG) Import Terminal and San Patricio Pipeline Natural Gas Pipeline, Authorization to Construct, Install and Operate, San Patricio and Nueces Counties, TX, Wait Period Ends: 07/18/2005, Contact: Thomas Russo 1–866–208–3372. EIS No. 20050243, Final EIS, AFS, OR, West Maurys Fuels and Vegetation Management Project, Prescribed Fire, Commercial and Noncommercial Thinning, Grapple Piling and Hand Piling, Implementation, Lookout Mountain Range District, Ochoco National Forest, Crook County, OR, Wait Period Ends: 07/18/2005, Contact: Larry Timchak 541–416– 6500. Dated: June 14, 2005. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 05–12014 Filed 6–16–05; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [OEI–2004–0005; FRL–7698–1] Lead-Based Paint System of Records (LPSOR) Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: SUMMARY: Pursuant to the provisions of the Privacy Act of 1974 (5 U.S.C. 552a), EPA’s Office of Pollution Prevention and Toxics (OPPT) is giving notice that it intends to establish a new System of VerDate jul<14>2003 17:59 Jun 16, 2005 Jkt 205001 Records (SOR) under the Federal LeadBased Paint Program. This system of records (LPSOR), comprising information stored in both electronic and hard paper formats, contains information on individuals who have applied for certification to conduct leadbased paint activities, who are students taking classes in lead-based paint activities, or who have been identified on behalf of firms which conduct or which receive accreditation to provide training in lead-based paint activities. EPA administers lead-based paint certification and accreditation programs in states, Indian tribal areas, and territories that do not have EPA authorization to administer such programs. Applicants interested in certification and accreditation must submit a complete application package and necessary fees for EPA approval. DATES: EPA intends to implement the new System of Records on July 27, 2005. FOR FURTHER INFORMATION CONTACT: Robert Wright,National Program Chemicals Division (7404T), Office of Pollution Prevention and Toxics, Environmental Protection Agency, 1200 Pennsylvania Ave., NW., Washington, DC 20460–0001; telephone number: (202) 566–1975; e-mail address:wright.robert@epa.gov. SUPPLEMENTARY INFORMATION: I. General Information A. Does this Action Apply to Me This action is directed to the public in general. This action may, however, be of interest to persons and firms making application for certification to perform lead-based paint activities and training organizations applying for accreditation to perform lead-based paint activitytraining. Since other entities may also be interested, the Agency has not attempted to describe all the specific entities that may be affected by this action. If you have any questions regarding the applicability of this action to a particular entity, consult the person listed under FOR FURTHER INFORMATION CONTACT. B. How Can I Get Copies of this Document and Other Related Information 1. Docket. EPA has established an official public docket for this action under docket identification number OEI–2004–0005. The official public docket is the collection of materials that is available for public viewing at the OEI Docket in the EPA Docket Center, (EPA/DC) EPA West, Room B102, 1301 Constitution Ave., NW., Washington, DC. The EPA Docket Center Public Reading Room is open from 8:30 a.m. to PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 35251 4:30 p.m., Monday through Friday, excluding legal holidays. The telephone number for the Reading Room is (202) 566–1744, and the telephone number for the OEI Docket is (202) 566–1752. 2. Electronic access. An electronic version of the public docket is available through EPA’s electronic public docket and comment system, EPA Dockets (https://www.epa.gov/edocket/). EPA Dockets can be used to view public comments, to access the index listing of the contents of the official public docket, and to access those documents in the public docket that are available electronically. Although not all docket materials may be available electronically, you may still access any of the publicly available docket materials through the docket facility identified above. II. LPSOR The EPA Federal Lead-Based Paint Program system of records does not duplicate any existing system of records. The new system is a system of information on individuals who have applied for certification and accreditation to perform lead-based paint activities. The system handles Privacy Act protected information in the same manner regardless of whether the information is contained in electronic or hard copy form. Access to the system is restricted to authorized users and will be maintained in a secure, password protected computer system, in secure areas and buildings with physical access controls and environmental controls. The system is maintained by EPA’s Office of Pollution Prevention and Toxics (OPPT). List of Subjects Environmental protection, Lead-based paint. Dated: May 31, 2005. Kimberly T. Nelson, Assistant Administrator and Chief Information Officer, Office of Environmental Information. EPA–54 System Name: Lead-Based Paint Program System of Records (LPSOR). Security Classification: None. System Location: Records maintained under the LPSOR are stored in different formats and in several locations as follows: (1) The main digital electronic system at EPA’s central server at the National Computer Center (NCC) in Research E:\FR\FM\17JNN1.SGM 17JNN1

Agencies

[Federal Register Volume 70, Number 116 (Friday, June 17, 2005)]
[Notices]
[Pages 35250-35251]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-12014]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6664-4]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements
Filed 06/06/2005 Through 06/10/2005
Pursuant to 40 CFR 1506.9.
EIS No. 20050231, Draft EIS, AFS, MT, Gallatin National Forest, 
Proposed Travel Management Plan, Implementation, Forest Land and 
Resource Management, Madison, Gallatin, Park, Meagher, Sweetgrass and 
Carbon Counties, MT, Comment Period Ends: 08/01/2005, Contact: Steve 
Christiansen 406-587-6750.
EIS No. 20050232, Final EIS, FHW, OR, Newberg-Dundee Transportation 
Improvement Project, (TEA 21 Prog. 37), Proposal to Relieve 
Congestion on OR-9W through the Cities of Newberg and Dundee, Bypass 
Element Location (Tier 1), Yamhill County, OR, Wait Period Ends: 07/18/
2005, Contact: Alan J. Fox 503-986-2681.
EIS No. 20050233, Final EIS, FHW, MI, I-75 from M-102 to M-59 Proposed 
Widening and Reconstruction, Transportation Improvements, Funding, 
NPDES Permit and U.S. Army COE Section 404 Permit, Oakland County, MI, 
Wait Period Ends: 08/05/2005, Contact: Abdelmoez Abdalla 517-702-1820.
EIS No. 20050234, Draft EIS, FHW, LA, Interstate 69, Section of 
Independent Utility (SIU) 15 Project, Construct between U.S. Highway 
171 near the Town of Stonewall in DeSoto Parish, and Interstate Highway 
20 (I-20) near the Town of Haughton in Bossier Parish, LA, Comment 
Period Ends: 08/01/2005, Contact: William C. Farr 225-757-7615.
EIS No. 20050235, Draft EIS, NPS, IN, Lincoln Boyhood National Memorial 
General Management Plan, Implementation, Lincoln City, Spencer County, 
IN, Comment Period Ends: 08/16/2005, Contact: Nick Chevance 402-661-
1844.
EIS No. 20050236, Draft EIS, AFS, MT, Rocky Mountain Ranger District 
Travel Management Plan, Proposes to Change the Management of Motorized 
and Non-Motorized Travel, Lewis and Clark National Forest, Glacier, 
Pondera, Teton and Lewis and Clark Counties, MT, Comment Period Ends: 
08/16/2005, Contact: Dick Schwecke 406-791-7700.
EIS No. 20050237, Final EIS, NOA, 00, Bottomfish and Seamount 
Groundfish Fisheries Conservation and Management Plan, Implementation, 
U.S. Economic Zone (EEZ) around the State of Hawaii, Territories of 
Samoa and Guam, Commonwealth of the Northern Mariana and various 
Islands and Atolls known as the U.S. Pacific remove Island areas, HI, 
GU and AS, Wait Period Ends: 07/18/2005, Contact: William Robinson 808-
973-2937.
EIS No. 20050238, Final EIS, AFS, UT, Monticello and Blanding Municipal 
Watershed Improvement Projects, Implementation, Manti-La Sal National 
Forest, Monticello Ranger District, San Juan County, UT, Wait Period 
Ends: 07/18/2005, Contact: Greg Montgomery 435-636-3348.
EIS No. 20050239, Draft EIS, CGD, 00, Main Pass Energy HUB Deepwater 
Port License Application, Proposes to Construct a Deepwater Port and 
Associated Anchorages, U.S. Army

[[Page 35251]]

COE Section 10 and 404 Permit, Gulf of Mexico (GOM), southeast of the 
coast of Louisiana in Main Pass Lease Block (MP) 299 and from the 
Mississippi coast in MP 164, Comment Period Ends: 08/01/2005, Contact: 
Mark Prescott 202-267-0225.
EIS No. 20050240, Draft Supplement, FTA, MA, Silver Line Phase III 
(previously known as South Boston Pier) Project, Updated Information to 
Physically Integrate Silver Line Phase I and II, Massachusetts Bay 
Transportation Authority's, Funding, MA, Comment Period Ends: 08/08/
2005, Contact: Andrew Brennan 617-222-3126.
EIS No. 20050241, Final EIS, BLM, 00, Programmatic EIS--Proposed 
Revision to Grazing Regulations for the Public Lands, 42 CFR Part 4100, 
in the Western Portion of the United States, Wait Period Ends: 07/18/
2005, Contact: Bud Cribley 202-785-6569.
EIS No. 20050242, Final EIS, FRC, TX, Ingleside Energy Center Liquefied 
Natural Gas (LNG) Import Terminal and San Patricio Pipeline Natural Gas 
Pipeline, Authorization to Construct, Install and Operate, San Patricio 
and Nueces Counties, TX, Wait Period Ends: 07/18/2005, Contact: Thomas 
Russo 1-866-208-3372.
EIS No. 20050243, Final EIS, AFS, OR, West Maurys Fuels and Vegetation 
Management Project, Prescribed Fire, Commercial and Noncommercial 
Thinning, Grapple Piling and Hand Piling, Implementation, Lookout 
Mountain Range District, Ochoco National Forest, Crook County, OR, Wait 
Period Ends: 07/18/2005, Contact: Larry Timchak 541-416-6500.

    Dated: June 14, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 05-12014 Filed 6-16-05; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.