Pacific Summit Energy, LLC; Notice of Amendment to Filing, 34751-34752 [E5-3072]
Download as PDF
Federal Register / Vol. 70, No. 114 / Wednesday, June 15, 2005 / Notices
e. Name of Project: California
Aqueduct Project.
f. Location: The project is located on
the California Aqueduct, in San
Bernadino, Los Angeles, San Luis
Obispo, Ventura, and Kern Counties,
California. This project is located within
the Angeles National Forest and Los
Padres National Forest.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a) 825(r) and 799
and 801.
h. Applicant Contact: Dr. Eva Begley,
California State Dept. of Water
Resources, 1416 Ninth Street, Room
1115–9, Sacramento, CA, 95814, (916)
653–5951.
i. FERC Contacts: Any questions on
this notice should be addressed to
Rebecca Martin at (202) 502–6012, or email address: rebecca.martin@ferc.gov.
j. Deadline for filing comments and or
motions: July 8, 2005.
All documents (original and eight
copies) should be filed with: Ms.
Magalie R. Salas, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington DC 20426.
Please include the project number (P–
2426–197) on any comments or motions
filed. Comments, protests, and
interventions may be filed electronically
via the internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages efilings.
k. Description of Request: The
licensees are seeking Commission
approval to modify the minimum flow
requirements for the Piru Creek below
Pyramid Dam which are required under
article 52 and Exhibit S of the license.
The licensees’ amendment would allow
the licensees to simulate natural flows
to the extent operationally feasible and
consistent with safety requirements. The
licensees request this amendment to
avoid an incidental take of the arroyo
toad which is a listed species under the
Endangered Species Act. By letter dated
February 2, 2005, the U.S. Fish and
Wildlife Service supports this request
for more natural flows in order to not
adversely affect the arroyo toad and its
habitat.
l. Location of the Application: The
filing is available for review at the
Commission in the Public Reference
Room, located at 888 First Street, NE.,
Room 2A, Washington, DC 20426, or
may be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, please contact
FERC Online support at
VerDate jul<14>2003
17:57 Jun 14, 2005
Jkt 205001
FERCOnLineSupport@ferc.gov or toll
free (866) 208 3676 or TTY, contact
(202) 502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS,’’ ‘‘PROTEST,’’ or
‘‘MOTION TO INTERVENE,’’ as
applicable, and the Project Number of
the particular application to which the
filing refers. A copy of any motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
p. Agency Comments—Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the ‘‘eFiling’’ link.
Magalie R. Salas,
Secretary.
[FR Doc. E5–3076 Filed 6–14–05; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00011
Fmt 4703
Sfmt 4703
34751
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER05–743–001]
Pacific Summit Energy, LLC; Notice of
Amendment to Filing
June 9, 2005.
Take notice that on May 26, 2005,
Pacific Summit Energy, LLC (PSE)
submitted an amendment to its petition
filed March 30, 2005 for order accepting
initial rate schedule waiving
regulations, and granting blanket
approvals in Docket No. ER05–743–000.
Any person desiring to intervene or to
protest in the above proceedings must
file in accordance with Rules 211 and
214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
The filing in the above proceeding is
accessible in the Commission’s eLibrary
system. It is also available for review in
the Commission’s Public Reference
Room in Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please e-
E:\FR\FM\15JNN1.SGM
15JNN1
34752
Federal Register / Vol. 70, No. 114 / Wednesday, June 15, 2005 / Notices
mail FERCOnlineSupport@ferc.gov or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5 p.m. on June 13,
2005.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–3072 Filed 6–14–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
June 6, 2005.
Take notice that the Commission
received the following electric rate
filings.
Docket Numbers: ER01–389–002.
Applicants: Calumet Energy Team,
LLC.
Description: Calmet Energy Team LLC
submits its tariff revisions made in
compliance with the 5/11/05 letter order
under ER01–389.
Filed Date: 05/31/2005.
Accession Number: 20050602–0063.
Comment Date: 5 p.m. eastern time on
Tuesday, June 21, 2005.
Docket Numbers: ER02–1632–002.
Applicants: Energy America LLC.
Description: Energy America, LLC
submits its Triennial Market Power
Review in support of its market-based
rate authority under ER02–1632.
Filed Date: 05/31/2005.
Accession Number: 20050602–0028.
Comment Date: 5 p.m. eastern time on
Tuesday, June 21, 2005.
Docket Numbers: ER03–563–051;
EL04–02–009.
Applicants: Power Marketing Inc.
Description: Fourth Compliance
Report of ISO New England Inc.
pursuant to Order issued June 2, 2004,
107 FERC ¶ 61,240 (2004).
Filed Date: 05/31/2005.
Accession Number: 20050531–5066.
Comment Date: 5 p.m. eastern time on
Tuesday, June 21, 2005.
Docket Numbers: ER03–1413–004;
ER94–1691–000.
Applicants: Sempra Energy Trading
Corp.
Description: Sempra Energy Trading
Corp. submits a notice of non-material
change in status in compliance
reporting requirements of Order 652
under ER03–1413 et al.
Filed Date: 05/31/2005.
Accession Number: 20050602–0129.
Comment Date: 5 p.m. eastern time on
Tuesday, June 21, 2005.
Docket Numbers: ER05–10–003.
VerDate jul<14>2003
17:57 Jun 14, 2005
Jkt 205001
Applicants: PJM Interconnection
L.L.C.
Description: PJM Interconnection,
LLC submits amendments to the PJM
open Access Transmission Tariff and
Amended and Restated Operating
Agreement of PJM Interconnection,
L.L.C. under ER05–10.
Filed Date: 05/31/2005.
Accession Number: 20050602–0026.
Comment Date: 5 p.m. eastern time on
Tuesday, June 21, 2005.
Docket Numbers: ER05–1043–000.
Applicants: Florida Power
Corporation.
Description: Florida Power Corp
d/b/a Progress Energy Florida, Inc.
submits a Network Integration
Transmission Service Agreement and
Network Operating Agreement with the
City of Winter Park under ER05–1043.
Filed Date: 05/31/2005.
Accession Number: 20050602–0061.
Comment Date: 5 p.m. eastern time on
Tuesday, June 21, 2005.
Docket Numbers: ER05–1044–000.
Applicants: ISO New England and
Northeast Utilities Service Company.
Description: ISO New England Inc.
and Northeast Utilities Service
Company, on behalf of The Connecticut
Light and Power Company, submit the
executed Standard Large Generator
Interconnection Agreement with
Waterside Power, LLC under ER05–
1044.
Filed Date: 05/31/2005.
Accession Number: 20050602–0091.
Comment Date: 5 p.m. eastern time on
Tuesday, June 21, 2005.
Docket Numbers: ER05–1045–000.
Applicants: Virginia Electric and
Power Company.
Description: Virginia Electric and
Power Co d/b/a Dominion Virginia
Power submits a revised long-term
service agreement providing for sales of
electric power and the resale of
transmission rights with Town of
Enfield, NC under ER05–1045.
Filed Date: 05/31/2005.
Accession Number: 20050602–0057.
Comment Date: 5 p.m. eastern time on
Tuesday, June 21, 2005.
Docket Numbers: ER05–1046–000.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator, Inc.
submits an Interconnection & Operating
Agreement among Cowell Wind Project,
Midwest ISO and Northern States Power
Company d/b/a Xcel Energy.
Filed Date: 05/31/2005.
Accession Number: 20050602–0058.
Comment Date: 5 p.m. eastern time on
Tuesday, June 21, 2005.
Docket Numbers: ER05–1047–000.
PO 00000
Frm 00012
Fmt 4703
Sfmt 4703
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator, Inc.
submits an Interconnection and
Operating Agreement among East Ridge
Transmission, LLC, Midwest ISO and
Great River Energy.
Filed Date: 05/31/2005.
Accession Number: 20050602–0090.
Comment Date: 5 p.m. eastern time on
Tuesday, June 21, 2005.
Docket Numbers: ER05–1048–000.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator Inc.
submits an Interconnection and
Operating Agreement among Wolf Wind
Transmission LLC, Midwest ISO and
Great River Energy.
Filed Date: 05/31/2005.
Accession Number: 20050602–0089.
Comment Date: 5 p.m. eastern time on
Tuesday, June 21, 2005.
Docket Numbers: ER05–1049–000.
Applicants: Union Electric Company
d/b/a AmerenUE.
Description: Union Electric Co d/b/a
AmerenUE submits certain amendments
to the Interchange Agreement with
Associated Electric Cooperative,
Incorporated.
Filed Date: 05/31/2005.
Accession Number: 20050602–0036.
Comment Date: 5 p.m. eastern time on
Tuesday, June 21, 2005.
Docket Numbers: ER05–1050–000.
Applicants: AmerGen Energy
Company LLC.
Description: AmerGen Energy Co LLC
submits a rate schedule and supporting
cost data for a proposed Reactive
Support and Voltage Control from
Generation Sources Services pursuant to
section 205 of the Federal Power Act
under ER05–1050.
Filed Date: 05/31/2005.
Accession Number: 20050602–0037.
Comment Date: 5 p.m. eastern time on
Tuesday, June 21, 2005.
Docket Numbers: ER05–1051–000.
Applicants: Westar Energy, Inc.
Description: Westar Energy Inc
submits an unexecuted Form of Service
Agreement for Ancillary Services and
Distribution Facilities between Westar
Energy, Inc., Kansas Power Pool and
Southwest Power Pool, to become
effective 5/1/05 under ER05–1051.
Filed Date: 05/31/2005.
Accession Number: 20050602–0038.
Comment Date: 5 p.m. eastern time on
Tuesday, June 21, 2005.
Docket Numbers: ER05–1052–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc submits an unexecuted Form of
E:\FR\FM\15JNN1.SGM
15JNN1
Agencies
[Federal Register Volume 70, Number 114 (Wednesday, June 15, 2005)]
[Notices]
[Pages 34751-34752]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-3072]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER05-743-001]
Pacific Summit Energy, LLC; Notice of Amendment to Filing
June 9, 2005.
Take notice that on May 26, 2005, Pacific Summit Energy, LLC (PSE)
submitted an amendment to its petition filed March 30, 2005 for order
accepting initial rate schedule waiving regulations, and granting
blanket approvals in Docket No. ER05-743-000.
Any person desiring to intervene or to protest in the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern time on the specified comment
date. It is not necessary to separately intervene again in a subdocket
related to a compliance filing if you have previously intervened in the
same docket. Protests will be considered by the Commission in
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Anyone filing a motion to
intervene or protest must serve a copy of that document on the
Applicant. In reference to filings initiating a new proceeding,
interventions or protests submitted on or before the comment deadline
need not be served on persons other than the applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://
www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426.
The filing in the above proceeding is accessible in the
Commission's eLibrary system. It is also available for review in the
Commission's Public Reference Room in Washington, DC. There is an
eSubscription link on the Web site that enables subscribers to receive
e-mail notification when a document is added to a subscribed docket(s).
For assistance with any FERC Online service, please e-
[[Page 34752]]
mail FERCOnlineSupport@ferc.gov or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5 p.m. on June 13, 2005.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-3072 Filed 6-14-05; 8:45 am]
BILLING CODE 6717-01-P