Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB) Review; Comment Request, 34161 [E5-3054]
Download as PDF
Federal Register / Vol. 70, No. 112 / Monday, June 13, 2005 / Notices
Estimate of Burden: task 1–10 hours.
Task 2–2 hours.
Respondents: Individuals and not-forprofit organizations.
Number of Respondents: There are
approximately 260 recipients and plans
call for contacting 50% of them.
Estimated Number of Responses per
Survey: One.
Comments: Comments are invited on
(a) Whether the proposed collection of
information is necessary for the proper
performance of the functions of the
Agency, including whether the
information shall have practical utility;
(b) the accuracy of the Agency’s
estimate of the burden of the proposed
collection of information; (c) ways to
enhance the quality, utility, and clarity
of the information on respondents;
including through the use of automated
collection techniques or other forms of
information technology; and (d) ways to
minimize the burden of the collection of
information on those who are to
respond, including through the use of
appropriate automated, electronic,
mechanical, or other technological
collection techniques or other forms of
information technology.
Dated: June 7, 2005.
Suzanne H. Plimpton,
Reports Clearance Officer, National Science
Foundation.
[FR Doc. 05–11606 Filed 6–10–05; 8:45 am]
BILLING CODE 7555–01–M
NUCLEAR REGULATORY
COMMISSION
Agency Information Collection
Activities: Submission for the Office of
Management and Budget (OMB)
Review; Comment Request
U.S. Nuclear Regulatory
Commission (NRC).
ACTION: Notice of the OMB review of
information collection and solicitation
of public comment.
AGENCY:
SUMMARY: The NRC has recently
submitted to OMB for review the
following proposal for the collection of
information under the provisions of the
Paperwork Reduction Act of 1995 (44
U.S.C. Chapter 35). The NRC hereby
informs potential respondents that an
agency may not conduct or sponsor, and
that a person is not required to respond
to, a collection of information unless it
displays a currently valid OMB control
number.
1. Type of submission, new, revision,
or extension: Extension.
2. The title of the information
collection: Notice of Enforcement
Discretion (NOEDs) for Operating Power
VerDate jul<14>2003
16:45 Jun 10, 2005
Jkt 205001
Reactors and Gaseous Diffusion Plants
(GDP).
3. The form number if applicable: Not
applicable.
4. How often the collection is
required: On occasion.
5. Who will be required or asked to
report: Nuclear power reactor licensees
and gaseous diffusion plant certificate
holders.
6. An estimate of the number of
annual responses: 26.
7. The estimated number of annual
respondents: 11.
8. An estimate of the total number of
hours needed annually to complete the
requirement or request: 1,991 hours
(1810 reporting [121 hours per response]
and 181 recordkeeping [16.45 hours per
recordkeeper]).
9. An indication of whether Section
3507(d), Pub. L. 104–13 applies: Not
applicable.
10. Abstract: The NRC’s Enforcement
Policy addresses circumstances in
which the NRC may exercise
enforcement discretion. A specific type
of enforcement discretion is designated
as a Notice of Enforcement Discretion
(NOED) and relates to circumstances
which may arise where a nuclear power
plant licensee’s compliance with a
Technical Specification Limiting
Condition for Operation or with other
license conditions would involve an
unnecessary plant transient or
shutdown, or performance of testing,
inspection, or system realignment that is
inappropriate for the specific plant
conditions, or unnecessary delays in
plant startup without a corresponding
health and safety benefit. Similarly, for
a gaseous diffusion plant, circumstances
may arise where compliance with a
Technical Safety Requirement or other
condition would unnecessarily call for a
total plant shutdown, or,
notwithstanding that a safety,
safeguards or security feature was
degraded or inoperable, compliance
would unnecessarily place the plant in
a transient or condition where those
features could be required.
A licensee or certificate holder
seeking the issuance of an NOED must
provide a written justification, in
accordance with guidance provided in
NRC Inspection Manual, Part 9900,
which documents the safety basis for
the request and provides whatever other
information the NRC staff deems
necessary to decide whether or not to
exercise discretion.
A copy of the final supporting
statement may be viewed free of charge
at the NRC Public Document Room, One
White Flint North, 11555 Rockville
Pike, Room O–1 F21, Rockville, MD
20852. OMB clearance requests are
PO 00000
Frm 00080
Fmt 4703
Sfmt 4703
34161
available at the NRC Worldwide Web
site: https://www.nrc.gov/public-involve/
doc-comment/omb/. The
document will be available on the NRC
home page site for 60 days after the
signature date of this notice.
Comments and questions should be
directed to the OMB reviewer listed
below by July 13, 2005. Comments
received after this date will be
considered if it is practical to do so, but
assurance of consideration cannot be
given to comments received after this
date. John A. Asalone, Office of
Information and Regulatory Affairs
(3150–0136), NEOB–10202, Office of
Management and Budget, Washington,
DC 20503.
Comments can also be e-mailed to
John_A._Asalone@omb.eop.gov or
submitted by telephone at (202) 395–
4650.
The NRC Clearance Officer is Brenda
Jo. Shelton, 301–415–7233.
Dated at Rockville, Maryland, this 6th day
of June, 2005.
For the Nuclear Regulatory Commission.
Brenda Jo. Shelton,
NRC Clearance Officer, Office of Information
Services.
[FR Doc. E5–3054 Filed 6–10–05; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 50–325 and 50–324]
Carolina Power & Light Company,
Brunswick Steam Electric Plant, Units
1 and 2; Notice of Consideration of
Issuance of Amendments to Facility
Operating Licenses, Proposed No
Significant Hazards Consideration
Determination, and Opportunity for a
Hearing
The U.S. Nuclear Regulatory
Commission (the Commission) is
considering issuance of amendments to
Facility Operating License No. DPR–71
and Facility Operating License No.
DPR–62 issued to Carolina Power &
Light Company (the licensee), for
operation of the Brunswick Steam
Electric Plant, Units 1 and 2, located in
Brunswick County, North Carolina.
The proposed changes replace the
existing requirement of Technical
Specification (TS) 3.4.5, ‘‘RCS [Reactor
Coolant System] Leakage Detection
Instrumentation,’’ Required Action D.1,
to enter Limiting Condition for
Operation (LCO) 3.0.3 if required
leakage detection systems are inoperable
with the requirement to be in Mode 3
within 12 hours and Mode 4 within 36
hours.
E:\FR\FM\13JNN1.SGM
13JNN1
Agencies
[Federal Register Volume 70, Number 112 (Monday, June 13, 2005)]
[Notices]
[Page 34161]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-3054]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
Agency Information Collection Activities: Submission for the
Office of Management and Budget (OMB) Review; Comment Request
AGENCY: U.S. Nuclear Regulatory Commission (NRC).
ACTION: Notice of the OMB review of information collection and
solicitation of public comment.
-----------------------------------------------------------------------
SUMMARY: The NRC has recently submitted to OMB for review the following
proposal for the collection of information under the provisions of the
Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). The NRC hereby
informs potential respondents that an agency may not conduct or
sponsor, and that a person is not required to respond to, a collection
of information unless it displays a currently valid OMB control number.
1. Type of submission, new, revision, or extension: Extension.
2. The title of the information collection: Notice of Enforcement
Discretion (NOEDs) for Operating Power Reactors and Gaseous Diffusion
Plants (GDP).
3. The form number if applicable: Not applicable.
4. How often the collection is required: On occasion.
5. Who will be required or asked to report: Nuclear power reactor
licensees and gaseous diffusion plant certificate holders.
6. An estimate of the number of annual responses: 26.
7. The estimated number of annual respondents: 11.
8. An estimate of the total number of hours needed annually to
complete the requirement or request: 1,991 hours (1810 reporting [121
hours per response] and 181 recordkeeping [16.45 hours per
recordkeeper]).
9. An indication of whether Section 3507(d), Pub. L. 104-13
applies: Not applicable.
10. Abstract: The NRC's Enforcement Policy addresses circumstances
in which the NRC may exercise enforcement discretion. A specific type
of enforcement discretion is designated as a Notice of Enforcement
Discretion (NOED) and relates to circumstances which may arise where a
nuclear power plant licensee's compliance with a Technical
Specification Limiting Condition for Operation or with other license
conditions would involve an unnecessary plant transient or shutdown, or
performance of testing, inspection, or system realignment that is
inappropriate for the specific plant conditions, or unnecessary delays
in plant startup without a corresponding health and safety benefit.
Similarly, for a gaseous diffusion plant, circumstances may arise where
compliance with a Technical Safety Requirement or other condition would
unnecessarily call for a total plant shutdown, or, notwithstanding that
a safety, safeguards or security feature was degraded or inoperable,
compliance would unnecessarily place the plant in a transient or
condition where those features could be required.
A licensee or certificate holder seeking the issuance of an NOED
must provide a written justification, in accordance with guidance
provided in NRC Inspection Manual, Part 9900, which documents the
safety basis for the request and provides whatever other information
the NRC staff deems necessary to decide whether or not to exercise
discretion.
A copy of the final supporting statement may be viewed free of
charge at the NRC Public Document Room, One White Flint North, 11555
Rockville Pike, Room O-1 F21, Rockville, MD 20852. OMB clearance
requests are available at the NRC Worldwide Web site: https://
www.nrc.gov/public-involve/doc-comment/omb/. The document
will be available on the NRC home page site for 60 days after the
signature date of this notice.
Comments and questions should be directed to the OMB reviewer
listed below by July 13, 2005. Comments received after this date will
be considered if it is practical to do so, but assurance of
consideration cannot be given to comments received after this date.
John A. Asalone, Office of Information and Regulatory Affairs (3150-
0136), NEOB-10202, Office of Management and Budget, Washington, DC
20503.
Comments can also be e-mailed to John--A.--Asalone@omb.eop.gov or
submitted by telephone at (202) 395-4650.
The NRC Clearance Officer is Brenda Jo. Shelton, 301-415-7233.
Dated at Rockville, Maryland, this 6th day of June, 2005.
For the Nuclear Regulatory Commission.
Brenda Jo. Shelton,
NRC Clearance Officer, Office of Information Services.
[FR Doc. E5-3054 Filed 6-10-05; 8:45 am]
BILLING CODE 7590-01-P