Eugene Water and Electric Board; Notice Dismissing Request for Rehearing as Moot, 33892 [E5-2998]
Download as PDF
33892
Federal Register / Vol. 70, No. 111 / Friday, June 10, 2005 / Notices
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant. On
or before the comment date, it is not
necessary to serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. eastern time on
June 17, 2005.
20, 2004 Order was rejected by notice
because Oregon DFW was not a party to
the extension of time proceeding.1 On
November 26, 2004, Oregon DFW filed
a request for rehearing of the November
1 notice.2
On February 2, 2005, the Electric
Board filed the gravel augmentation and
fish habitat enhancement plans. By
order issued on March 15, 2005, the
Commission modified and approved the
plans.3 Since both of the plans in
question have been filed and approved,
and no rehearing requests were filed on
the Commission’s March 15 Order,
Oregon DFW’s request for rehearing of
the November 1, 2004 notice and the
accompanying notice of intervention are
moot. Accordingly, the Electric Board’s
request for rehearing of the November 1,
2004 notice and the accompanying
notice of intervention dismissed as
moot.
This notice constitutes final agency
action. Request for rehearing by the
Commission of this notice must be filed
within 30 days of the date of issuance
of this notice, pursuant to 18 CFR
385.713.
Magalie R. Salas,
Secretary.
[FR Doc. E5–2998 Filed 6–9–05; 8:45 am]
BILLING CODE 6717–01–P
Magalie R. Salas,
Secretary.
[FR Doc. E5–2993 Filed 6–9–05; 8:45 am]
DEPARTMENT OF ENERGY
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
[Docket No. RP05–355–000]
Federal Energy Regulatory
Commission
Gas Transmission Northwest
Corporation; Notice of Proposed
Changes in FERC Gas Tariff
[Project No. 2496–103]
June 1, 2005.
Eugene Water and Electric Board;
Notice Dismissing Request for
Rehearing as Moot
June 1, 2005.
On August 23, 2004, the Eugene
Water and Electric Board (Electric
Board) filed a motion requesting an
extension of time to comply with
Articles 412 and 413 of the license for
the Leaburg-Walterville Project No.
2496, which require filing plans to
augment spawning gravel downstream
of Leaburg dam and enhance fish
habitat, respectively. On September 20,
2004, Commission staff issued an order
granting the Electric Board’s request. On
October 18, 2004, the Oregon
Department of Fish and Wildlife
(Oregon DFW) filed a request for
rehearing of the September 20 Order.
On November 1, 2004, Oregon DFW’s
request for rehearing of the September
VerDate jul<14>2003
17:22 Jun 09, 2005
Jkt 205001
Take notice that on May 26, 2005, Gas
Transmission Northwest Corporation
(GTN) tendered for filing as part of its
FERC Gas Tariff, Third Revised Volume
No. 1–A, Second Revised Sheet No. 117,
to become effective June 27, 2005.
GTN states that this tariff sheet is
being submitted to add tariff language
that will allow GTN, at a shipper’s
request, to incur third party charges for
the benefit of the shipper and to bill the
shipper for such charges.
GTN further states that a copy of this
filing has been served on GTN’s
jurisdictional customers and interested
State regulatory agencies.
1 Oregon DFW was not a party because it had not
filed a notice of intervention.
2 Oregon DFW’s request for rehearing was
accompanied by a notice of intervention.
3 Eugene Water and Electric Board 110 FERC
¶ 62,263 (2005).
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E5–3002 Filed 6–9–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP05–356–000]
North Baja Pipeline, LLC; Notice of
Proposed Changes in FERC Gas Tariff
June 1, 2005.
Take notice that on May 26, 2005,
North Baja Pipeline, LLC (NBP)
tendered for filing as part of its FERC
Gas Tariff, Original Volume No. 1,
E:\FR\FM\10JNN1.SGM
10JNN1
Agencies
[Federal Register Volume 70, Number 111 (Friday, June 10, 2005)]
[Notices]
[Page 33892]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-2998]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2496-103]
Eugene Water and Electric Board; Notice Dismissing Request for
Rehearing as Moot
June 1, 2005.
On August 23, 2004, the Eugene Water and Electric Board (Electric
Board) filed a motion requesting an extension of time to comply with
Articles 412 and 413 of the license for the Leaburg-Walterville Project
No. 2496, which require filing plans to augment spawning gravel
downstream of Leaburg dam and enhance fish habitat, respectively. On
September 20, 2004, Commission staff issued an order granting the
Electric Board's request. On October 18, 2004, the Oregon Department of
Fish and Wildlife (Oregon DFW) filed a request for rehearing of the
September 20 Order.
On November 1, 2004, Oregon DFW's request for rehearing of the
September 20, 2004 Order was rejected by notice because Oregon DFW was
not a party to the extension of time proceeding.\1\ On November 26,
2004, Oregon DFW filed a request for rehearing of the November 1
notice.\2\
---------------------------------------------------------------------------
\1\ Oregon DFW was not a party because it had not filed a notice
of intervention.
\2\ Oregon DFW's request for rehearing was accompanied by a
notice of intervention.
---------------------------------------------------------------------------
On February 2, 2005, the Electric Board filed the gravel
augmentation and fish habitat enhancement plans. By order issued on
March 15, 2005, the Commission modified and approved the plans.\3\
Since both of the plans in question have been filed and approved, and
no rehearing requests were filed on the Commission's March 15 Order,
Oregon DFW's request for rehearing of the November 1, 2004 notice and
the accompanying notice of intervention are moot. Accordingly, the
Electric Board's request for rehearing of the November 1, 2004 notice
and the accompanying notice of intervention dismissed as moot.
---------------------------------------------------------------------------
\3\ Eugene Water and Electric Board 110 FERC ] 62,263 (2005).
---------------------------------------------------------------------------
This notice constitutes final agency action. Request for rehearing
by the Commission of this notice must be filed within 30 days of the
date of issuance of this notice, pursuant to 18 CFR 385.713.
Magalie R. Salas,
Secretary.
[FR Doc. E5-2998 Filed 6-9-05; 8:45 am]