Notice of Application Accepted for Filing and Soliciting Comments, Protests, and Motions To Intervene, 33895-33896 [E5-2996]
Download as PDF
Federal Register / Vol. 70, No. 111 / Friday, June 10, 2005 / Notices
t. Agency Comments—Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E5–2995 Filed 6–9–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application Accepted for
Filing and Soliciting Comments,
Protests, and Motions To Intervene
June 1, 2005.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
permit.
b. Project No.: 12586–000.
c. Date filed: April 27, 2005.
d. Applicant: Paradise Irrigation
District.
e. Name and Location of Project: The
proposed Paradise Hydroelectric Project
would be located in Butte County in
California and would occupy lands
administered by the Bureau of Land
Management and the U.S. Forest
Service.
f. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)—825(r).
g. Applicant contact: Mr. George
Barber, District Manager, Paradise
Irrigation District, 5325 Black Olive
Drive, P.O. Box 2409, Paradise, CA
95967–4971, (530) 877–4971.
h. FERC Contact: Tom Papsidero,
(202) 502–6002.
i. Deadline for filing comments,
protests, and motions to intervene: 60
days from the issuance date of this
notice.
All documents (original and eight
copies) should be filed with Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper; see 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
VerDate jul<14>2003
17:22 Jun 09, 2005
Jkt 205001
Please include the project number (P–
12586–000) on any comments or
motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
j. Description of Existing Facilities
and Proposed Project: The proposed
project would use the applicant’s
existing 175-foot-high, 975-foot-long
Paradise Dam and Reservoir, which
occupies approximately 90 acres of
Federal land, and which has a storage
capacity of 11,500 acre-feet, a surface
area of 244 acres, and normal maximum
surface elevation of 2,568 feet msl. The
applicant proposes to study several
alternatives at the site and the proposed
project would likely consist of: (1) A
new powerhouse to be located on
Federal land, containing one turbinegenerator unit with a total installed
capacity of 350 kW; (2) a new 30-inchwide steel penstock (3) a new 0.5-milelong transmission line; and (4)
appurtenant facilities. The proposed
project would have an annual
generation of 1,091 MWh.
k. Location of Applications: A copy of
the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item g
above.
l. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
m. Competing Preliminary Permit—
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
33895
competing preliminary permit
application no later than 30 days after
the specified comment date for the
particular application. A competing
preliminary permit application must
conform with 18 CFR 4.30(b) and 4.36.
m. Competing Development
Application—Any qualified
development applicant desiring to file a
competing development application
must submit to the Commission, on or
before a specified comment date for the
particular application, either a
competing development application or a
notice of intent to file such an
application. Submission of a timely
notice of intent to file a development
application allows an interested person
to file the competing application no
later than 120 days after the specified
comment date for the particular
application. A competing license
application must conform with 18 CFR
4.30(b) and 4.36.
n. Notice of Intent—A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
o. Proposed Scope of Studies Under
Permit—A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
p. Comments, Protests, or Motions To
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
Comments, protests and interventions
may be filed electronically via the
E:\FR\FM\10JNN1.SGM
10JNN1
33896
Federal Register / Vol. 70, No. 111 / Friday, June 10, 2005 / Notices
Internet in lieu of paper; see 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under ‘‘efiling’’ link. The Commission strongly
encourages electronic filing.
q. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT
TO FILE COMPETING APPLICATION’’,
‘‘COMPETING APPLICATION’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
Any of the above-named documents
must be filed by providing the original
and the number of copies provided by
the Commission’s regulations to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. An additional
copy must be sent to Director, Division
of Hydropower Administration and
Compliance, Federal Energy Regulatory
Commission, at the above-mentioned
address. A copy of any notice of intent,
competing application or motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
r. Agency Comments—Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E5–2996 Filed 6–9–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Transfer of
License and Approval of Financing
Arrangement and Soliciting
Comments, Motions To Intervene, and
Protests
June 1, 2005.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Motion to
substitute transferor in transfer of
license.
b. Project No.: 1855–030.
c. Date Filed: May 24, 2005.
VerDate jul<14>2003
17:22 Jun 09, 2005
Jkt 205001
d. Applicants: USGen New England,
Inc. (USGenNE); TransCanada Hydro
Northeast Inc. (TC Hydro NE); Town of
Rockingham, Vermont (Town); Bellows
Falls Power Company, LLC (BFPC);
Vermont Hydro-Electric Power
Authority (VHPA).
e. Name and Location of Project:
Bellows Falls, P–1855: Connecticut
River in Windham and Windsor
Counties, Vermont and Cheshire and
Sullivan Counties, New Hampshire.
f. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a—825r.
g. Applicants’ Contact: Amy S. Koch,
Patton Boggs LLP, 2550 M Street, NW.,
Washington, DC 20037, (202) 457–6000.
h. FERC Contact: James Hunter at
(202) 502–6086.
i. Deadline for filing comments,
protests, and motions to intervene: July
1, 2005.
All documents (original and eight
copies) should be filed with: Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper; see 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Please include the Project Number on
any comments or motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing a document with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the documents
on that resource agency.
j. Description of Application: As
described in the notice issued February
7, 2005, USGenNE, the Town, BFPC,
and VHPA sought Commission approval
to transfer the license for the Bellows
Falls Project from USGenNE to the
Town and BFPC as co-licensees and for
approval of a financing plan under
Standard Article 5 whereby VHPA
would, at closing, take title to project
property and transfer it to the Town.
This transfer was requested as an
alternative, for this project only, to the
transfer from USGenNE to TC Hydro NE
of this project and four others that was
approved by order issued on January 24,
2005, but not, at that time,
consummated. The Applicants now
report that TC Hydro NE purchased the
Bellows Falls Project from USGenNE on
April 1, 2005, and request that TC
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
Hydro NE be substituted for USGenNE
as the transferor in the current
proceeding.
k. This filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘FERRIS’’ link.
Enter the docket number (P–1855) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the addresses in item g.
above.
l. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
m. Comments, Protests, or Motions To
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
n. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. Any of the above-named
documents must be filed by providing
the original and eight copies to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. A copy of any
motion to intervene must also be served
upon each representative of the
Applicants specified in the particular
application.
o. Agency Comments—Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicants. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
E:\FR\FM\10JNN1.SGM
10JNN1
Agencies
[Federal Register Volume 70, Number 111 (Friday, June 10, 2005)]
[Notices]
[Pages 33895-33896]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-2996]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Accepted for Filing and Soliciting
Comments, Protests, and Motions To Intervene
June 1, 2005.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Preliminary permit.
b. Project No.: 12586-000.
c. Date filed: April 27, 2005.
d. Applicant: Paradise Irrigation District.
e. Name and Location of Project: The proposed Paradise
Hydroelectric Project would be located in Butte County in California
and would occupy lands administered by the Bureau of Land Management
and the U.S. Forest Service.
f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)--825(r).
g. Applicant contact: Mr. George Barber, District Manager, Paradise
Irrigation District, 5325 Black Olive Drive, P.O. Box 2409, Paradise,
CA 95967-4971, (530) 877-4971.
h. FERC Contact: Tom Papsidero, (202) 502-6002.
i. Deadline for filing comments, protests, and motions to
intervene: 60 days from the issuance date of this notice.
All documents (original and eight copies) should be filed with
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. Comments, protests and
interventions may be filed electronically via the Internet in lieu of
paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the
Commission's Web site under the ``e-Filing'' link. The Commission
strongly encourages electronic filings. Please include the project
number (P-12586-000) on any comments or motions filed.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
j. Description of Existing Facilities and Proposed Project: The
proposed project would use the applicant's existing 175-foot-high, 975-
foot-long Paradise Dam and Reservoir, which occupies approximately 90
acres of Federal land, and which has a storage capacity of 11,500 acre-
feet, a surface area of 244 acres, and normal maximum surface elevation
of 2,568 feet msl. The applicant proposes to study several alternatives
at the site and the proposed project would likely consist of: (1) A new
powerhouse to be located on Federal land, containing one turbine-
generator unit with a total installed capacity of 350 kW; (2) a new 30-
inch-wide steel penstock (3) a new 0.5-mile-long transmission line; and
(4) appurtenant facilities. The proposed project would have an annual
generation of 1,091 MWh.
k. Location of Applications: A copy of the application is available
for inspection and reproduction at the Commission in the Public
Reference Room or may be viewed on the Commission's Web site at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket number
excluding the last three digits in the docket number field to access
the document. For assistance, call toll-free 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item g
above.
l. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
m. Competing Preliminary Permit--Anyone desiring to file a
competing application for preliminary permit for a proposed project
must submit the competing application itself, or a notice of intent to
file such an application, to the Commission on or before the specified
comment date for the particular application (see 18 CFR 4.36).
Submission of a timely notice of intent allows an interested person to
file the competing preliminary permit application no later than 30 days
after the specified comment date for the particular application. A
competing preliminary permit application must conform with 18 CFR
4.30(b) and 4.36.
m. Competing Development Application--Any qualified development
applicant desiring to file a competing development application must
submit to the Commission, on or before a specified comment date for the
particular application, either a competing development application or a
notice of intent to file such an application. Submission of a timely
notice of intent to file a development application allows an interested
person to file the competing application no later than 120 days after
the specified comment date for the particular application. A competing
license application must conform with 18 CFR 4.30(b) and 4.36.
n. Notice of Intent--A notice of intent must specify the exact
name, business address, and telephone number of the prospective
applicant, and must include an unequivocal statement of intent to
submit, if such an application may be filed, either a preliminary
permit application or a development application (specify which type of
application). A notice of intent must be served on the applicant(s)
named in this public notice.
o. Proposed Scope of Studies Under Permit--A preliminary permit, if
issued, does not authorize construction. The term of the proposed
preliminary permit would be 36 months. The work proposed under the
preliminary permit would include economic analysis, preparation of
preliminary engineering plans, and a study of environmental impacts.
Based on the results of these studies, the Applicant would decide
whether to proceed with the preparation of a development application to
construct and operate the project.
p. Comments, Protests, or Motions To Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
Comments, protests and interventions may be filed electronically
via the
[[Page 33896]]
Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission's Web site under ``e-filing'' link. The
Commission strongly encourages electronic filing.
q. Filing and Service of Responsive Documents--Any filings must
bear in all capital letters the title ``COMMENTS'', ``NOTICE OF INTENT
TO FILE COMPETING APPLICATION'', ``COMPETING APPLICATION'',
``PROTEST'', or ``MOTION TO INTERVENE'', as applicable, and the Project
Number of the particular application to which the filing refers. Any of
the above-named documents must be filed by providing the original and
the number of copies provided by the Commission's regulations to: The
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. An additional copy must be sent to Director,
Division of Hydropower Administration and Compliance, Federal Energy
Regulatory Commission, at the above-mentioned address. A copy of any
notice of intent, competing application or motion to intervene must
also be served upon each representative of the Applicant specified in
the particular application.
r. Agency Comments--Federal, State, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E5-2996 Filed 6-9-05; 8:45 am]
BILLING CODE 6717-01-P