Notice of Application Accepting for Filing and Soliciting Motions To Intervene, Protests and Comments, 33894-33895 [E5-2995]

Download as PDF 33894 Federal Register / Vol. 70, No. 111 / Friday, June 10, 2005 / Notices The notice has been mailed again to all affected parties. The scoping period closing date is hereby extended to June 29, 2005. Magalie R. Salas, Secretary. [FR Doc. E5–3008 Filed 6–9–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application Accepting for Filing and Soliciting Motions To Intervene, Protests and Comments June 1, 2005. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Preliminary permit. b. Project No.: 12579–000. c. Date filed: March 14, 2005. d. Applicant: Alaska Power & Telephone Company. e. Name of Project: Boundary Lake Hydroelectric Project. f. Location: On Boundary Creek and Boundary Lake, near the City of Juneau, Borough of Juneau, Alaska, within the Tongass National Forest. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)—825(r). h. Applicant Contact: Mr. Robert S. Grimm, President, Alaska Power & Telephone Company, P.O. Box 3222, Port Townsend, WA 98368, (360) 385– 1733 x 120. i. FERC Contact: Etta Foster, (202) 502–8769. j. Deadline for filing comments, protests, and motions to intervene: 60 days from the issuance date of this notice. All documents (original and eight copies) should be filed with Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Please include the project number (P– 12579–000) on any comments, protests, or motions filed. k. Description of Project: The proposed project would consist of: (1) A proposed concrete, steel, or wood crib diversion and intake structure approximately 45-feet-high and 100feet-long on Boundary Lake and Boundary Creek; (2) a reservoir with a surface area of 50 acres and a storage capacity of 5,000 acre-feet at an elevation of 900 feet; (3) a low-pressure pipe penstock approximately 1,800 feet in length and 60-inches in diameter; (4) VerDate jul<14>2003 17:22 Jun 09, 2005 Jkt 205001 a powerhouse containing 1 or 2 turbines to achieve the maximum capacity for generation of 9 megawatts; (5) a tailrace that will extend a short distance to the Taku River; (6) a 35 kV transmission line that is 0.4 miles long, and (7) appurtenant facilities. The project would have an annual generation of 35(GWh) gigawatt-hours. l. Location of Application: A copy of the application is available for inspection and reproduction at the Commission in the Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call toll-free 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item h. above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Competing Preliminary Permit— Anyone desiring to file a competing application for preliminary permit for a proposed project must submit the competing application itself, or a notice of intent to file such an application, to the Commission on or before the specified comment date for the particular application (see 18 CFR 4.36). Submission of a timely notice of intent allows an interested person to file the competing preliminary permit application no later than 30 days after the specified comment date for the particular application. A competing preliminary permit application must conform with 18 CFR 4.30(b) and 4.36. o. Competing Development Application—Any qualified development applicant desiring to file a competing development application must submit to the Commission, on or before a specified comment date for the particular application, either a competing development application or a notice of intent to file such an application. Submission of a timely notice of intent to file a development application allows an interested person to file the competing application no later than 120 days after the specified comment date for the particular application. A competing license application must conform with 18 CFR 4.30(b) and 4.36. p. Notice of Intent—a notice of intent must specify the exact name, business PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit, if such an application may be filed, either a preliminary permit application or a development application (specify which type of application). A notice of intent must be served on the applicant(s) named in this public notice. q. Proposed Scope of Studies Under Permit—A preliminary permit, if issued, does not authorize construction. The term of the proposed preliminary permit would be 36 months. The work proposed under the preliminary permit would include economic analysis, preparation of preliminary engineering plans, and a study of environmental impacts. Based on the results of these studies, the Applicant would decide whether to proceed with the preparation of a development application to construct and operate the project. r. Comments, Protests, or Motions To Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper; see 18 CFR 385.2001 (a)(1)(iii) and the instructions on the Commission’s Web site under ‘‘efiling’’ link. The Commission strongly encourages electronic filing. s. Filing and Service of Responsive Documents—Any filings must bear in all capital letter the title ‘‘COMMENTS’’, ‘‘RECOMMENDATIONS FOR TERMS AND CONDITIONS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. Any of the above-named documents must be filed by providing the original and the number of copies provided by the Commission’s regulations to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. E:\FR\FM\10JNN1.SGM 10JNN1 Federal Register / Vol. 70, No. 111 / Friday, June 10, 2005 / Notices t. Agency Comments—Federal, State, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Magalie R. Salas, Secretary. [FR Doc. E5–2995 Filed 6–9–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application Accepted for Filing and Soliciting Comments, Protests, and Motions To Intervene June 1, 2005. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Preliminary permit. b. Project No.: 12586–000. c. Date filed: April 27, 2005. d. Applicant: Paradise Irrigation District. e. Name and Location of Project: The proposed Paradise Hydroelectric Project would be located in Butte County in California and would occupy lands administered by the Bureau of Land Management and the U.S. Forest Service. f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)—825(r). g. Applicant contact: Mr. George Barber, District Manager, Paradise Irrigation District, 5325 Black Olive Drive, P.O. Box 2409, Paradise, CA 95967–4971, (530) 877–4971. h. FERC Contact: Tom Papsidero, (202) 502–6002. i. Deadline for filing comments, protests, and motions to intervene: 60 days from the issuance date of this notice. All documents (original and eight copies) should be filed with Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. VerDate jul<14>2003 17:22 Jun 09, 2005 Jkt 205001 Please include the project number (P– 12586–000) on any comments or motions filed. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person in the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. j. Description of Existing Facilities and Proposed Project: The proposed project would use the applicant’s existing 175-foot-high, 975-foot-long Paradise Dam and Reservoir, which occupies approximately 90 acres of Federal land, and which has a storage capacity of 11,500 acre-feet, a surface area of 244 acres, and normal maximum surface elevation of 2,568 feet msl. The applicant proposes to study several alternatives at the site and the proposed project would likely consist of: (1) A new powerhouse to be located on Federal land, containing one turbinegenerator unit with a total installed capacity of 350 kW; (2) a new 30-inchwide steel penstock (3) a new 0.5-milelong transmission line; and (4) appurtenant facilities. The proposed project would have an annual generation of 1,091 MWh. k. Location of Applications: A copy of the application is available for inspection and reproduction at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call toll-free 1–866–208– 3676 or e-mail FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item g above. l. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. m. Competing Preliminary Permit— Anyone desiring to file a competing application for preliminary permit for a proposed project must submit the competing application itself, or a notice of intent to file such an application, to the Commission on or before the specified comment date for the particular application (see 18 CFR 4.36). Submission of a timely notice of intent allows an interested person to file the PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 33895 competing preliminary permit application no later than 30 days after the specified comment date for the particular application. A competing preliminary permit application must conform with 18 CFR 4.30(b) and 4.36. m. Competing Development Application—Any qualified development applicant desiring to file a competing development application must submit to the Commission, on or before a specified comment date for the particular application, either a competing development application or a notice of intent to file such an application. Submission of a timely notice of intent to file a development application allows an interested person to file the competing application no later than 120 days after the specified comment date for the particular application. A competing license application must conform with 18 CFR 4.30(b) and 4.36. n. Notice of Intent—A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit, if such an application may be filed, either a preliminary permit application or a development application (specify which type of application). A notice of intent must be served on the applicant(s) named in this public notice. o. Proposed Scope of Studies Under Permit—A preliminary permit, if issued, does not authorize construction. The term of the proposed preliminary permit would be 36 months. The work proposed under the preliminary permit would include economic analysis, preparation of preliminary engineering plans, and a study of environmental impacts. Based on the results of these studies, the Applicant would decide whether to proceed with the preparation of a development application to construct and operate the project. p. Comments, Protests, or Motions To Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. Comments, protests and interventions may be filed electronically via the E:\FR\FM\10JNN1.SGM 10JNN1

Agencies

[Federal Register Volume 70, Number 111 (Friday, June 10, 2005)]
[Notices]
[Pages 33894-33895]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-2995]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Application Accepting for Filing and Soliciting Motions 
To Intervene, Protests and Comments

June 1, 2005.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Preliminary permit.
    b. Project No.: 12579-000.
    c. Date filed: March 14, 2005.
    d. Applicant: Alaska Power & Telephone Company.
    e. Name of Project: Boundary Lake Hydroelectric Project.
    f. Location: On Boundary Creek and Boundary Lake, near the City of 
Juneau, Borough of Juneau, Alaska, within the Tongass National Forest.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)--825(r).
    h. Applicant Contact: Mr. Robert S. Grimm, President, Alaska Power 
& Telephone Company, P.O. Box 3222, Port Townsend, WA 98368, (360) 385-
1733 x 120.
    i. FERC Contact: Etta Foster, (202) 502-8769.
    j. Deadline for filing comments, protests, and motions to 
intervene: 60 days from the issuance date of this notice.
    All documents (original and eight copies) should be filed with 
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE., Washington, DC 20426. Please include the project 
number (P-12579-000) on any comments, protests, or motions filed.
    k. Description of Project: The proposed project would consist of: 
(1) A proposed concrete, steel, or wood crib diversion and intake 
structure approximately 45-feet-high and 100-feet-long on Boundary Lake 
and Boundary Creek; (2) a reservoir with a surface area of 50 acres and 
a storage capacity of 5,000 acre-feet at an elevation of 900 feet; (3) 
a low-pressure pipe penstock approximately 1,800 feet in length and 60-
inches in diameter; (4) a powerhouse containing 1 or 2 turbines to 
achieve the maximum capacity for generation of 9 megawatts; (5) a 
tailrace that will extend a short distance to the Taku River; (6) a 35 
kV transmission line that is 0.4 miles long, and (7) appurtenant 
facilities.
    The project would have an annual generation of 35(GWh) gigawatt-
hours.
    l. Location of Application: A copy of the application is available 
for inspection and reproduction at the Commission in the Public 
Reference Room, located at 888 First Street, NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at https://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, call toll-free 1-866-208-3676 or e-mail 
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
h. above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Competing Preliminary Permit--Anyone desiring to file a 
competing application for preliminary permit for a proposed project 
must submit the competing application itself, or a notice of intent to 
file such an application, to the Commission on or before the specified 
comment date for the particular application (see 18 CFR 4.36). 
Submission of a timely notice of intent allows an interested person to 
file the competing preliminary permit application no later than 30 days 
after the specified comment date for the particular application. A 
competing preliminary permit application must conform with 18 CFR 
4.30(b) and 4.36.
    o. Competing Development Application--Any qualified development 
applicant desiring to file a competing development application must 
submit to the Commission, on or before a specified comment date for the 
particular application, either a competing development application or a 
notice of intent to file such an application. Submission of a timely 
notice of intent to file a development application allows an interested 
person to file the competing application no later than 120 days after 
the specified comment date for the particular application. A competing 
license application must conform with 18 CFR 4.30(b) and 4.36.
    p. Notice of Intent--a notice of intent must specify the exact 
name, business address, and telephone number of the prospective 
applicant, and must include an unequivocal statement of intent to 
submit, if such an application may be filed, either a preliminary 
permit application or a development application (specify which type of 
application). A notice of intent must be served on the applicant(s) 
named in this public notice.
    q. Proposed Scope of Studies Under Permit--A preliminary permit, if 
issued, does not authorize construction. The term of the proposed 
preliminary permit would be 36 months. The work proposed under the 
preliminary permit would include economic analysis, preparation of 
preliminary engineering plans, and a study of environmental impacts. 
Based on the results of these studies, the Applicant would decide 
whether to proceed with the preparation of a development application to 
construct and operate the project.
    r. Comments, Protests, or Motions To Intervene--Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    Comments, protests and interventions may be filed electronically 
via the Internet in lieu of paper; see 18 CFR 385.2001 (a)(1)(iii) and 
the instructions on the Commission's Web site under ``e-filing'' link. 
The Commission strongly encourages electronic filing.
    s. Filing and Service of Responsive Documents--Any filings must 
bear in all capital letter the title ``COMMENTS'', ``RECOMMENDATIONS 
FOR TERMS AND CONDITIONS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as 
applicable, and the Project Number of the particular application to 
which the filing refers. Any of the above-named documents must be filed 
by providing the original and the number of copies provided by the 
Commission's regulations to: The Secretary, Federal Energy Regulatory 
Commission, 888 First Street, NE., Washington, DC 20426. A copy of any 
motion to intervene must also be served upon each representative of the 
Applicant specified in the particular application.

[[Page 33895]]

    t. Agency Comments--Federal, State, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the applicant. If 
an agency does not file comments within the time specified for filing 
comments, it will be presumed to have no comments. One copy of an 
agency's comments must also be sent to the Applicant's representatives.

Magalie R. Salas,
Secretary.
[FR Doc. E5-2995 Filed 6-9-05; 8:45 am]