City of Holyoke Gas & Electric; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protest, 33472 [E5-2924]
Download as PDF
33472
Federal Register / Vol. 70, No. 109 / Wednesday, June 8, 2005 / Notices
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to https://
www.ferc.gov/esubscribenow.htm.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–2921 Filed 6–7–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 7758–004]
City of Holyoke Gas & Electric; Notice
of Application Accepted for Filing and
Soliciting Motions To Intervene and
Protest
June 2, 2005.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
License.
b. Project No.: P–7758–004.
c. Date Filed: February 25, 2005.
d. Applicant: City of Holyoke Gas &
Electric Department.
e. Name of Project: Holyoke Canal No.
4 Project.
f. Location: Adjacent to the
Connecticut River in Hampden County,
Massachusetts. The project does not
occupy any federal lands.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Paul
Ducheney, Superintendent-Hydro,
Holyoke Gas & Electric Department, One
Canal Street, Holyoke, MA 01040, (413)
536–9340 or ducheney@hged.com.
i. FERC Contact: Jack Hannula,
john.hannula@ferc.gov, or call (202)
502–8917.
j. Deadline for filing motions to
intervene and protest: 60 days from the
issuance date of this notice.
All documents (original and eight
copies) should be filed with: Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commissions Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
VerDate jul<14>2003
18:08 Jun 07, 2005
Jkt 205001
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
Motions to intervene and protests may
be filed electronically via the Internet in
lieu of paper. The Commission strongly
encourages electronic filings. See CFR
385.200 (a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov) under the ‘‘eFiling’’ link.
k. This application has been accepted,
but is not ready for environmental
analysis at this time.
l. The Holyoke No. 4 Canal Hydro
Project consists of the following existing
facilities: (a) Two 7-foot-diameter, 76foot-long penstocks drawing water from
the first level canal of the Holyoke Canal
System; (b) a powerhouse with two 375
kW generating units with a total
installed capacity of 750 kW; (c) two 13foot-wide, 300-foot-long tailraces
discharging into the second level canal;
(d) a 25-foot-long, 4.8-kV transmission
line; and (e) appurtenant facilities. One
of the generating units was destroyed in
an October 2004 fire; unit rehabilitation
has yet to be determined.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h. above.
You may also register online at
https://www.ferc.gov/esubscribenow.htm
to be notified via email of new filings
and issuances related to this or other
pending projects. For assistance, contact
FERC Online Support.
n. Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’ or
‘‘MOTION TO INTERVENE’’; (2) set
forth in the heading the name of the
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
Agencies may obtain copies of the
application directly from the applicant.
A copy of any protest or motion to
intervene must be served upon each
representative of the applicant specified
in the particular application.
o. Procedural schedule and final
amendments: The application will be
processed according to the following
Hydro Licensing Schedule. Revisions to
the schedule will be made as
appropriate. The Commission staff
proposes to issue one environmental
assessment rather than issue a draft and
final EA. Comments, terms and
conditions, recommendations,
prescriptions, and reply comments, if
any, will be addressed in the EA. Staff
intends to give at least 30 days for
entities to comment on the EA before
final action is taken on the license
application.
Issue Scoping Document for Comments:
June 2005.
Notice application ready for
environmental analysis: September
2005.
Notice of the availability of the EA:
March 2006.
Ready for Commission’s decision on the
Application: April 2006.
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–2924 Filed 6–7–05; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–7922–3]
Agency Information Collection
Activities: Proposed Collection;
Comment Request; Regulatory Pilot
Projects (Project XL); EPA ICR Number
1755.06, OMB Control Number 2010–
0026
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: In compliance with the
Paperwork Reduction Act (44 U.S.C.
3501 et seq.), this document announces
that EPA is planning to submit for
E:\FR\FM\08JNN1.SGM
08JNN1
Agencies
[Federal Register Volume 70, Number 109 (Wednesday, June 8, 2005)]
[Notices]
[Page 33472]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-2924]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 7758-004]
City of Holyoke Gas & Electric; Notice of Application Accepted
for Filing and Soliciting Motions To Intervene and Protest
June 2, 2005.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent License.
b. Project No.: P-7758-004.
c. Date Filed: February 25, 2005.
d. Applicant: City of Holyoke Gas & Electric Department.
e. Name of Project: Holyoke Canal No. 4 Project.
f. Location: Adjacent to the Connecticut River in Hampden County,
Massachusetts. The project does not occupy any federal lands.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Paul Ducheney, Superintendent-Hydro,
Holyoke Gas & Electric Department, One Canal Street, Holyoke, MA 01040,
(413) 536-9340 or ducheney@hged.com.
i. FERC Contact: Jack Hannula, john.hannula@ferc.gov, or call (202)
502-8917.
j. Deadline for filing motions to intervene and protest: 60 days
from the issuance date of this notice.
All documents (original and eight copies) should be filed with:
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commissions Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
Motions to intervene and protests may be filed electronically via
the Internet in lieu of paper. The Commission strongly encourages
electronic filings. See CFR 385.200 (a)(1)(iii) and the instructions on
the Commission's Web site (https://www.ferc.gov) under the ``eFiling''
link.
k. This application has been accepted, but is not ready for
environmental analysis at this time.
l. The Holyoke No. 4 Canal Hydro Project consists of the following
existing facilities: (a) Two 7-foot-diameter, 76-foot-long penstocks
drawing water from the first level canal of the Holyoke Canal System;
(b) a powerhouse with two 375 kW generating units with a total
installed capacity of 750 kW; (c) two 13-foot-wide, 300-foot-long
tailraces discharging into the second level canal; (d) a 25-foot-long,
4.8-kV transmission line; and (e) appurtenant facilities. One of the
generating units was destroyed in an October 2004 fire; unit
rehabilitation has yet to be determined.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for
inspection and reproduction at the address in item h. above.
You may also register online at https://www.ferc.gov/
esubscribenow.htm to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Anyone may submit a protest or a motion to intervene in
accordance with the requirements of Rules of Practice and Procedure, 18
CFR 385.210, 385.211, and 385.214. In determining the appropriate
action to take, the Commission will consider all protests filed, but
only those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any protests
or motions to intervene must be received on or before the specified
deadline date for the particular application.
All filings must (1) bear in all capital letters the title
``PROTEST'' or ``MOTION TO INTERVENE''; (2) set forth in the heading
the name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application.
o. Procedural schedule and final amendments: The application will
be processed according to the following Hydro Licensing Schedule.
Revisions to the schedule will be made as appropriate. The Commission
staff proposes to issue one environmental assessment rather than issue
a draft and final EA. Comments, terms and conditions, recommendations,
prescriptions, and reply comments, if any, will be addressed in the EA.
Staff intends to give at least 30 days for entities to comment on the
EA before final action is taken on the license application.
Issue Scoping Document for Comments: June 2005.
Notice application ready for environmental analysis: September 2005.
Notice of the availability of the EA: March 2006.
Ready for Commission's decision on the Application: April 2006.
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Linda Mitry,