Commission Information Collection Activities, Proposed Collection; Comment Request; Extension, 33141-33142 [E5-2881]
Download as PDF
33141
Federal Register / Vol. 70, No. 108 / Tuesday, June 7, 2005 / Notices
other forms of information technology
e.g. permitting electronic submission of
responses.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–2880 Filed 6–6–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC05–510–000; FERC–510]
Commission Information Collection
Activities, Proposed Collection;
Comment Request; Extension
May 6, 2005.
Federal Energy Regulatory
Commission, DoE.
ACTION: Notice of proposed information
collection and request for comments.
AGENCY:
SUMMARY: In compliance with the
requirements of section 3506(c)(2)(a) of
the Paperwork Reduction Act of 1995
(Pub. L. 104–13), the Federal Energy
Regulatory Commission (Commission) is
soliciting public comment on the
specific aspects of the information
collection described below.
DATES: Comments on the collection of
information are due August 5, 2005.
ADDRESSES: Copies of sample filings of
the proposed collection of information
can be obtained from the Commission’s
Web site (https://www.ferc.gov/docsfilings/elibrary.asp) or to the Federal
Energy Regulatory Commission, Attn:
Michael Miller, Office of the Executive
Director Officer, ED–33, 888 First Street
NE., Washington, DC 20426. Comments
may be filed either in paper format or
electronically. Those parties filing
electronically do not need to make a
paper filing. For paper filing, the
original and 14 copies of such
comments should be submitted to the
Office of the Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426 and
refer to Docket No. IC05–510–000.
Documents filed electronically via the
Internet must be prepared in
WordPerfect, MS Word, Portable
Document Format, or ASCII format. To
file the document, access the
Commission’s Web site at https://
www.ferc.gov and click on ‘‘Make an Efiling’’, and then follow the instructions
for each screen. First time users will
have to establish a user name and
password. The Commission will send an
automatic acknowledgement to the
sender’s e-mail address upon receipt of
comments.
All comments may be viewed, printed
or downloaded remotely via the Internet
through FERC’s homepage using the
eLibrary link. For user assistance,
contact FERCOnlineSupport@ferc.gov or
toll-free at (866) 208–3676; or for TTY,
contact (202) 502–8659.
FOR FURTHER INFORMATION CONTACT:
Michael Miller may be reached by
telephone at (202) 502–8415, by fax at
(202) 273–0873, and by e-mail at
michael.miller@ferc.gov.
The
information collected under the
requirements of FERC–510 ‘‘Application
for Surrender of Hydropower License’’
(OMB No. 1902–0068) is used by the
Commission to implement the statutory
provisions of sections 4(e) and 6 and 13
of the Federal Power Act (FPA) 16
U.S.C. sections 797(e), 799 and 806.
Section 4(e) gives the Commission
authority to issue licenses for the
purposes of constructing, operating and
maintaining dams, water conduits,
reservoirs, powerhouses, transmissions
lines or other power project works
necessary or convenient for developing
SUPPLEMENTARY INFORMATION:
and improving navigation,
transmissions and utilization of power
over which Congress has jurisdiction.
Section 6 gives the Commission the
authority to prescribe the conditions of
licenses including the revocation or
surrender of the license. Section 13
defines the Commission’s authority to
delegate time periods for when a license
must be terminated if project
construction has not begun. Surrender
of a license may be desired by a licensee
when a licensed project is retired or not
constructed or natural catastrophes have
damaged or destroyed the project
facilities. The information collected
under the designation FERC–510 is in
the form of a written application for a
surrender of a hydropower license. The
information is used by Commission staff
to determine the broad impact of such
a surrender. The Commission will issue
a notice soliciting comments from the
public and other agencies and conduct
a careful review of the prepared
application before issuing an order for
Surrender of a License. The order is the
result of an analysis of the information
produced, i.e., economic, environmental
concerns, etc., which are examined to
determine if the application for
surrender is warranted. The order
implements the existing regulations and
is inclusive for surrender of all types of
hydropower licenses issued by FERC
and its predecessor, the Federal Power
Commission. The Commission
implements these mandatory filing
requirements in the Code of Federal
Regulations (CFR) under 18 CFR 6.1–
6.4.
Action: The Commission is requesting
a three-year extension of the current
expiration date, with no changes to the
existing collection of data.
Burden Statement: Public reporting
burden for this collection is estimated
as:
Number of respondents annually
(1)
Number of responses per respondent
(2)
Average burden hours per response
(3)
Total annual burden hours
(1)×(2)×(3)
8
1
10
80
Estimated cost burden to respondents
is $4,175. (80 hours/2080 hours per year
times $108,558 per year average per
employee = $4,175). The cost per
respondent is $522.00.
The reporting burden includes the
total time, effort, or financial resources
expended to generate, maintain, retain,
disclose, or provide the information
including: (1) Reviewing instructions;
(2) developing, acquiring, installing, and
utilizing technology and systems for the
VerDate jul<14>2003
20:54 Jun 06, 2005
Jkt 205001
purposes of collecting, validating,
verifying, processing, maintaining,
disclosing and providing information;
(3) adjusting the existing ways to
comply with any previously applicable
instructions and requirements; (4)
training personnel to respond to a
collection of information; (5) searching
data sources; (6) completing and
reviewing the collection of information;
and (7) transmitting, or otherwise
disclosing the information.
PO 00000
Frm 00087
Fmt 4703
Sfmt 4703
The estimate of cost for respondents
is based upon salaries for professional
and clerical support, as well as direct
and indirect overhead costs. Direct costs
include all costs directly attributable to
providing this information, such as
administrative costs and the cost for
information technology. Indirect or
overhead costs are costs incurred by an
organization in support of its mission.
These costs apply to activities which
benefit the whole organization rather
E:\FR\FM\07JNN1.SGM
07JNN1
33142
Federal Register / Vol. 70, No. 108 / Tuesday, June 7, 2005 / Notices
than any one particular function or
activity.
Comments are invited on: (1) Whether
the proposed collection of information
is necessary for the proper performance
of the functions of the Commission,
including whether the information will
have practical utility; (2) the accuracy of
the agency’s estimate of the burden of
the proposed collection of information,
including the validity of the
methodology and assumptions used; (3)
ways to enhance the quality, utility and
clarity of the information to be
collected; and (4) ways to minimize the
burden of the collection of information
on those who are to respond, including
the use of appropriate automated,
electronic, mechanical, or other
technological collection techniques or
other forms of information technology
e.g. permitting electronic submission of
responses.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–2881 Filed 6–6–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Filings
Wednesday, June 1, 2005.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER04–170–006;
ER05–1027–000.
Applicants: MxEnergy Electric Inc.
Description: MxEnergy Electric Inc
submits its Substitute Second Revised
Sheet No. 3, which revises paragraph 8
of its FERC Electric Rate Schedule No.
1 and a Notice of Succession of Total
Gas & Electricity (PA) Inc.’s Rate
Schedule No. 2.
Filed Date: 5/26/2005.
Accession Number: 20050531–0127.
Comment Date: 5 p.m. Eastern Time
on Thursday, June 16, 2005.
Docket Numbers: ER05–644–002.
Applicants: PSEG Energy Resources &
Trade LLC and PSEG Fossil Fossil LLC.
Description: PSEG Energy Resources
& Trade LLC submits Substitute Original
Sheet No. 1, et al., to FERC Electric
Tariff, Original Volume 1 in compliance
with FERC’s Order issued 4/25/05 under
ER05–644.
Filed Date: 5/25/2005.
Accession Number: 20050531–0128.
Comment Date: 5 p.m. Eastern Time
on Wednesday, June 15, 2005.
Docket Numbers: ER05–1018–000.
VerDate jul<14>2003
20:54 Jun 06, 2005
Jkt 205001
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator, Inc.
submits a Large Generator
Interconnection Agreement among the
PPM Energy, Inc., itself, and Northern
States Power Company dba Xcel Energy
under ER05–1018.
Filed Date: 5/25/2005.
Accession Number: 20050526–0217.
Comment Date: 5 p.m. Eastern Time
on Wednesday, June 15, 2005.
Docket Numbers: ER05–1019–000.
Applicants: Nevada Power Company.
Description: Nevada Power Company
submits a Notice of Cancellation of an
Agreement for Long-Term Firm Point-toPoint Transmission Service Between
Nevada Power Company and Duke
Energy Trading and Marketing—Service
Agreement No. 97.
Filed Date: 5/26/2005.
Accession Number: 20050531–0123.
Comment Date: 5 p.m. Eastern Time
on Thursday, June 16, 2005.
Docket Numbers: ER05–1020–000.
Applicants: WASP Energy, LLC.
Description: WASP Energy, LLC’s
petition for acceptance of initial rate
schedule (FERC Electric Rate Schedule
1), waivers and blanket authority under
ER05–1020.
Filed Date: 5/26/2005.
Accession Number: 20050531–0122.
Comment Date: 5 p.m. Eastern Time
on Thursday, June 16, 2005.
Docket Numbers: ER05–1021–000.
Applicants: Pacific Gas & Electric
Company.
Description: Pacific Gas and Electric
Company submits Agreements between
Pacific Gas and Electric Company and
the City and County of San Francisco
PUC for the interconnection of the San
Francisco Airport Electric Reliability
Project under ER05–1021.
Filed Date: 5/26/2005.
Accession Number: 20050531–0134.
Comment Date: 5 p.m. Eastern Time
on Thursday, June 16, 2005.
Docket Numbers: ER05–1022–000.
Applicants: ISO New England Inc.
and New England Power Pool.
Description: ISO New England, Inc.
and New England Power Pool submits
proposed market rule changes to modify
the existing methodology for allocating
surplus Transmission Congestion
Revenue and to conform certain market
monitoring definitions used in Market
Rule 1 to the terminology that has been
adopted as part of the RTO process
under ER05–1022.
Filed Date: 5/25/2005.
Accession Number: 20050531–0120.
Comment Date: 5 p.m. Eastern Time
on Wednesday, June 15, 2005.
PO 00000
Frm 00088
Fmt 4703
Sfmt 4703
Docket Numbers: ER05–1023–000.
Applicants: TransAlta Centralia
Generation L.L.C.
Description: TransAlta Centralia
Generation, L.L.C. submits FERC Electric
Rate Schedule 2 for Reactive Supply
and Voltage Control from Generation
Sources Service that it provides to
Bonneville Power Administration from
its Big Hanaford generating plant under
ER05–1023.
Filed Date: 5/26/2005.
Accession Number: 20050531–0124.
Comment Date: 5 p.m. Eastern Time
on Thursday, June 16, 2005.
Docket Numbers: ER05–1024–000.
Applicants: PJM Interconnection,
L.L.C.
Description: PJM Interconnection,
L.L.C. submits an executed
interconnection service agreement with
Eastern Landfill Gas, LLC and Baltimore
Gas and Electric Company under ER05–
1024.
Filed Date: 5/25/2005.
Accession Number: 20050531–0130.
Comment Date: 5 p.m. Eastern Time
on Wednesday, June 15, 2005.
Docket Numbers: ER05–1025–000.
Applicants: California Independent
System Operator Corporation.
Description: California Independent
System Operator Corporation submits
Amendment No. 70 to its ISO Tariff
under ER05–1025.
Filed Date: 5/25/2005.
Accession Number: 20050531–0131.
Comment Date: 5 p.m. Eastern Time
on Wednesday, June 15, 2005.
Docket Numbers: ER05–1026–000.
Applicants: American Electric Power
Services Corporation.
Description: American Electric Power
Service Corporation on behalf of the
AEP Eastern Operating Companies
submits a letter agreement, dated 4/28/
05, to the Amended & Restated Cost
Allocation Agreement with Buckeye
Power, Inc under ER05–1026.
Filed Date: 5/26/2005.
Accession Number: 20050531–0129.
Comment Date: 5 p.m. Eastern Time
on Thursday, June 16, 2005.
Docket Numbers: ER98–1150–005;
EL05–87–001.
Applicants: Tucson Electric Power
Company.
Description: Tucson Electric Power Co
submits the second of two filings in
compliance with FERC’s 4/14/05 Order,
an updated generation market power
analysis under ER98–1150 et al.
Filed Date: 5/25/2005.
Accession Number: 20050531–0125.
Comment Date: 5 p.m. Eastern Time
on Wednesday, June 15, 2005.
Docket Numbers: ER99–2251–003;
ER99–2252–004; ER98–2491–009; ER97–
E:\FR\FM\07JNN1.SGM
07JNN1
Agencies
[Federal Register Volume 70, Number 108 (Tuesday, June 7, 2005)]
[Notices]
[Pages 33141-33142]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-2881]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. IC05-510-000; FERC-510]
Commission Information Collection Activities, Proposed
Collection; Comment Request; Extension
May 6, 2005.
AGENCY: Federal Energy Regulatory Commission, DoE.
ACTION: Notice of proposed information collection and request for
comments.
-----------------------------------------------------------------------
SUMMARY: In compliance with the requirements of section 3506(c)(2)(a)
of the Paperwork Reduction Act of 1995 (Pub. L. 104-13), the Federal
Energy Regulatory Commission (Commission) is soliciting public comment
on the specific aspects of the information collection described below.
DATES: Comments on the collection of information are due August 5,
2005.
ADDRESSES: Copies of sample filings of the proposed collection of
information can be obtained from the Commission's Web site (https://
www.ferc.gov/docs-filings/elibrary.asp) or to the Federal Energy
Regulatory Commission, Attn: Michael Miller, Office of the Executive
Director Officer, ED-33, 888 First Street NE., Washington, DC 20426.
Comments may be filed either in paper format or electronically. Those
parties filing electronically do not need to make a paper filing. For
paper filing, the original and 14 copies of such comments should be
submitted to the Office of the Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE., Washington, DC 20426 and refer to
Docket No. IC05-510-000.
Documents filed electronically via the Internet must be prepared in
WordPerfect, MS Word, Portable Document Format, or ASCII format. To
file the document, access the Commission's Web site at https://
www.ferc.gov and click on ``Make an E-filing'', and then follow the
instructions for each screen. First time users will have to establish a
user name and password. The Commission will send an automatic
acknowledgement to the sender's e-mail address upon receipt of
comments.
All comments may be viewed, printed or downloaded remotely via the
Internet through FERC's homepage using the eLibrary link. For user
assistance, contact FERCOnlineSupport@ferc.gov or toll-free at (866)
208-3676; or for TTY, contact (202) 502-8659.
FOR FURTHER INFORMATION CONTACT: Michael Miller may be reached by
telephone at (202) 502-8415, by fax at (202) 273-0873, and by e-mail at
michael.miller@ferc.gov.
SUPPLEMENTARY INFORMATION: The information collected under the
requirements of FERC-510 ``Application for Surrender of Hydropower
License'' (OMB No. 1902-0068) is used by the Commission to implement
the statutory provisions of sections 4(e) and 6 and 13 of the Federal
Power Act (FPA) 16 U.S.C. sections 797(e), 799 and 806. Section 4(e)
gives the Commission authority to issue licenses for the purposes of
constructing, operating and maintaining dams, water conduits,
reservoirs, powerhouses, transmissions lines or other power project
works necessary or convenient for developing and improving navigation,
transmissions and utilization of power over which Congress has
jurisdiction. Section 6 gives the Commission the authority to prescribe
the conditions of licenses including the revocation or surrender of the
license. Section 13 defines the Commission's authority to delegate time
periods for when a license must be terminated if project construction
has not begun. Surrender of a license may be desired by a licensee when
a licensed project is retired or not constructed or natural
catastrophes have damaged or destroyed the project facilities. The
information collected under the designation FERC-510 is in the form of
a written application for a surrender of a hydropower license. The
information is used by Commission staff to determine the broad impact
of such a surrender. The Commission will issue a notice soliciting
comments from the public and other agencies and conduct a careful
review of the prepared application before issuing an order for
Surrender of a License. The order is the result of an analysis of the
information produced, i.e., economic, environmental concerns, etc.,
which are examined to determine if the application for surrender is
warranted. The order implements the existing regulations and is
inclusive for surrender of all types of hydropower licenses issued by
FERC and its predecessor, the Federal Power Commission. The Commission
implements these mandatory filing requirements in the Code of Federal
Regulations (CFR) under 18 CFR 6.1-6.4.
Action: The Commission is requesting a three-year extension of the
current expiration date, with no changes to the existing collection of
data.
Burden Statement: Public reporting burden for this collection is
estimated as:
------------------------------------------------------------------------
Number of Number of Average burden Total annual
respondents responses per hours per burden hours
annually (1) respondent (2) response (3) (1)x(2)x(3)
------------------------------------------------------------------------
8 1 10 80
------------------------------------------------------------------------
Estimated cost burden to respondents is $4,175. (80 hours/2080
hours per year times $108,558 per year average per employee = $4,175).
The cost per respondent is $522.00.
The reporting burden includes the total time, effort, or financial
resources expended to generate, maintain, retain, disclose, or provide
the information including: (1) Reviewing instructions; (2) developing,
acquiring, installing, and utilizing technology and systems for the
purposes of collecting, validating, verifying, processing, maintaining,
disclosing and providing information; (3) adjusting the existing ways
to comply with any previously applicable instructions and requirements;
(4) training personnel to respond to a collection of information; (5)
searching data sources; (6) completing and reviewing the collection of
information; and (7) transmitting, or otherwise disclosing the
information.
The estimate of cost for respondents is based upon salaries for
professional and clerical support, as well as direct and indirect
overhead costs. Direct costs include all costs directly attributable to
providing this information, such as administrative costs and the cost
for information technology. Indirect or overhead costs are costs
incurred by an organization in support of its mission. These costs
apply to activities which benefit the whole organization rather
[[Page 33142]]
than any one particular function or activity.
Comments are invited on: (1) Whether the proposed collection of
information is necessary for the proper performance of the functions of
the Commission, including whether the information will have practical
utility; (2) the accuracy of the agency's estimate of the burden of the
proposed collection of information, including the validity of the
methodology and assumptions used; (3) ways to enhance the quality,
utility and clarity of the information to be collected; and (4) ways to
minimize the burden of the collection of information on those who are
to respond, including the use of appropriate automated, electronic,
mechanical, or other technological collection techniques or other forms
of information technology e.g. permitting electronic submission of
responses.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-2881 Filed 6-6-05; 8:45 am]
BILLING CODE 6717-01-P