Notice of Application Accepted for Filing and Soliciting Comments, Protests, and Motions To Intervene, 32320-32321 [E5-2778]
Download as PDF
32320
Federal Register / Vol. 70, No. 105 / Thursday, June 2, 2005 / Notices
• Label one copy of the comments for
the attention of Gas Branch 3, DG2E;
and
• Reference Docket No. PF05–6–000
on the original and both copies.
Please note that the Commission
encourages electronic filing of
comments. See 18 Code of Federal
Regulations 385.2001(a)(1)(iii) and the
instructions on the Commission’s
Internet Web site at https://www.ferc.gov
under the ‘‘eFiling’’ link and the link to
the User’s Guide. Prepare your
submission in the same manner as you
would if filing on paper and save it to
a file on your hard drive. Before you can
file comments you will need to create an
account by clicking on ‘‘Login to File’’
and then ‘‘New User Account.’’ You will
be asked to select the type of filing you
are making. This filing is considered a
‘‘Comment on Filing.’’
When Transco submits its application
for authorization to construct and
operate the Leidy to Long Island
Expansion Project, the Commission will
publish a Notice of Application in the
Federal Register and will establish a
deadline for interested persons to
intervene in the proceeding. Because the
Commission’s Pre-filing Process occurs
before an application to begin a
proceeding is officially filed, petitions
to intervene during this process are
premature and will not be accepted by
the Commission.
Environmental Mailing List
If you wish to remain on the
environmental mailing list, please
return the Mailing List Retention Form
included in Appendix 2. If you do not
return this form, you will be taken off
our mailing list.
Availability of Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs
at 1–866–208 FERC (3372) or on the
FERC Internet Web site (https://
www.ferc.gov). Using the ‘‘eLibrary’’
link, select (General Search(from the
eLibrary menu, enter the selected date
range and (Docket Number((i.e., PF05–
6–000), and follow the instructions.
Searches may also be done using the
phrase (Leidy to Long Island Expansion(
in the (Text Search(field. For assistance
with access to eLibrary, the helpline can
be reached at 1–866–208–3676, TTY
(202) 502–8659, or at
FERCOnlineSupport@ ferc.gov. The
eLibrary link on the FERC Internet Web
site also provides access to the texts of
formal documents issued by the
Commission, such as orders, notices,
and rule makings.
VerDate jul<14>2003
16:54 Jun 01, 2005
Jkt 205001
In addition, the FERC now offers a
free service called eSubscription that
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. To register for this service,
go to https://www.ferc.gov/
esubscribenow.htm.
Public meetings or site visits will be
posted on the Commission’s calendar
located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information. Finally,
Transco has established an Internet Web
site for its project at https://
www.williams.com/northeast
expansion. The website includes a
project overview, contact information,
regulatory overview, and construction
procedures.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–2781 Filed 6–1–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application Accepted for
Filing and Soliciting Comments,
Protests, and Motions To Intervene
May 25, 2005.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 12575–000.
c. Date filed: March 1, 2005.
d. Applicant: South Fork Irrigation
District and Hot Springs Valley
Irrigation District.
e. Name and Location of Project: The
proposed West Valley Pumped Storage
Project would be located in Modoc and
Lassen Counties in California and
would use the Bureau of Land
Management’s Moon Lake Dam.
f. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
g. Applicant contact: Mr. Donald R.
Pope, 2037 E. Phillips Place, Littleton,
CO 80122–3228, (303) 905–4954.
h. FERC Contact: Tom Papsidero,
(202) 502–6002.
i. Deadline for filing comments,
protests, and motions to intervene: 60
days from the issuance date of this
notice.
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
All documents (original and eight
copies) should be filed with Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper; see 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Please include the project number (P–
12575–000) on any comments or
motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
j. Description of Project: The proposed
pumped storage project would use the
existing 16-foot-high, 1,100-foot-long
earthen Moon Lake Dam and the Moon
Lake Reservoir, having a surface area of
3,000 acres, a storage capacity of 35,000
acre-feet, and normal water surface
elevation of 5,500 feet msl (which
would serve as the upper reservoir). The
proposed project would consist of: (1) A
new 90-foot-high, 650-foot-long concrete
dam; (2) a new reservoir having a
surface area of 184 acres, a storage
capacity of 8,280 acre-feet, and normal
water surface elevation of 4,950 feet msl
(this proposed reservoir would serve as
the lower reservoir and would be
connected by tunnel to the upper
reservoir); (3) a new powerhouse within
the tunnel, containing four generating
units with a total installed capacity of
264 MW; (4) a new 5-mile-long, 203–KV
transmission line; and (5) appurtenant
facilities. The proposed project would
have an annual generation of 542,880
MWh.
k. Location of Applications: A copy of
the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
E:\FR\FM\02JNN1.SGM
02JNN1
Federal Register / Vol. 70, No. 105 / Thursday, June 2, 2005 / Notices
reproduction at the address in item g
above.
l. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
m. Competing Preliminary Permit—
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
particular application. A competing
preliminary permit application must
conform with 18 CFR 4.30(b) and 4.36.
m. Competing Development
Application—Any qualified
development applicant desiring to file a
competing development application
must submit to the Commission, on or
before a specified comment date for the
particular application, either a
competing development application or a
notice of intent to file such an
application. Submission of a timely
notice of intent to file a development
application allows an interested person
to file the competing application no
later than 120 days after the specified
comment date for the particular
application. A competing license
application must conform with 18 CFR
4.30(b) and 4.36.
n. Notice of Intent—A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
o. Proposed Scope of Studies Under
Permit—A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
p. Comments, Protests, or Motions to
Intervene—Anyone may submit
VerDate jul<14>2003
16:54 Jun 01, 2005
Jkt 205001
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper; See 18 CFR
385.2001 (a)(1)(iii) and the instructions
on the Commission’s Web site under ‘‘efiling’’ link. The Commission strongly
encourages electronic filing.
q. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT
TO FILE COMPETING APPLICATION’’,
‘‘COMPETING APPLICATION’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
Any of the above-named documents
must be filed by providing the original
and the number of copies provided by
the Commission’s regulations to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. An additional
copy must be sent to Director, Division
of Hydropower Administration and
Compliance, Federal Energy Regulatory
Commission, at the above-mentioned
address. A copy of any notice of intent,
competing application or motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
r. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–2778 Filed 6–1–05; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
32321
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application Accepted for
Filing and Soliciting Comments,
Protests, and Motions To Intervene
May 25, 2005
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 12583–000.
c. Date filed: April 4, 2005.
d. Applicant: City of Brawley,
California.
e. Name and Location of Proposed
Project: The proposed Colorado River
Aqueduct Desalination and Salton Sea
Water Supply Project would be located
on the Colorado River Aqueduct
Wasteway No.1, and Salton Sea, in
Riverside and Imperial Counties,
California. The Colorado River
Aqueduct is owned by the Metropolitan
Water District of Southern California,
Wasteway No. 1 and is administered by
the U.S. Bureau of Reclamation. The
Salton Sea is managed by the Salton Sea
Authority.
f. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
g. Applicant contact: Mr. Michael J.
Clinton, Brawley FERC Associates, LLC,
8635 W. Sahara Ave., #588, Las Vegas,
NV 89117, (702) 255–1536.
h. FERC Contact: Tom Papsidero,
(202) 502–6002.
i. Deadline for filing comments,
protests, and motions to intervene: 60
days from the issuance date of this
notice.
All documents (original and eight
copies) should be filed with Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper; see 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Please include the project number (P–
12583–000) on any comments or
motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
E:\FR\FM\02JNN1.SGM
02JNN1
Agencies
[Federal Register Volume 70, Number 105 (Thursday, June 2, 2005)]
[Notices]
[Pages 32320-32321]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-2778]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Accepted for Filing and Soliciting
Comments, Protests, and Motions To Intervene
May 25, 2005.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Preliminary Permit.
b. Project No.: 12575-000.
c. Date filed: March 1, 2005.
d. Applicant: South Fork Irrigation District and Hot Springs Valley
Irrigation District.
e. Name and Location of Project: The proposed West Valley Pumped
Storage Project would be located in Modoc and Lassen Counties in
California and would use the Bureau of Land Management's Moon Lake Dam.
f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
g. Applicant contact: Mr. Donald R. Pope, 2037 E. Phillips Place,
Littleton, CO 80122-3228, (303) 905-4954.
h. FERC Contact: Tom Papsidero, (202) 502-6002.
i. Deadline for filing comments, protests, and motions to
intervene: 60 days from the issuance date of this notice.
All documents (original and eight copies) should be filed with
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. Comments, protests and
interventions may be filed electronically via the Internet in lieu of
paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the
Commission's Web site under the ``e-Filing'' link. The Commission
strongly encourages electronic filings. Please include the project
number (P-12575-000) on any comments or motions filed.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
j. Description of Project: The proposed pumped storage project
would use the existing 16-foot-high, 1,100-foot-long earthen Moon Lake
Dam and the Moon Lake Reservoir, having a surface area of 3,000 acres,
a storage capacity of 35,000 acre-feet, and normal water surface
elevation of 5,500 feet msl (which would serve as the upper reservoir).
The proposed project would consist of: (1) A new 90-foot-high, 650-
foot-long concrete dam; (2) a new reservoir having a surface area of
184 acres, a storage capacity of 8,280 acre-feet, and normal water
surface elevation of 4,950 feet msl (this proposed reservoir would
serve as the lower reservoir and would be connected by tunnel to the
upper reservoir); (3) a new powerhouse within the tunnel, containing
four generating units with a total installed capacity of 264 MW; (4) a
new 5-mile-long, 203-KV transmission line; and (5) appurtenant
facilities. The proposed project would have an annual generation of
542,880 MWh.
k. Location of Applications: A copy of the application is available
for inspection and reproduction at the Commission in the Public
Reference Room or may be viewed on the Commission's Web site at https://
www.ferc.gov using the ``eLibrary'' link. Enter the docket number
excluding the last three digits in the docket number field to access
the document. For assistance, call toll-free 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is
also available for inspection and
[[Page 32321]]
reproduction at the address in item g above.
l. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
m. Competing Preliminary Permit--Anyone desiring to file a
competing application for preliminary permit for a proposed project
must submit the competing application itself, or a notice of intent to
file such an application, to the Commission on or before the specified
comment date for the particular application (see 18 CFR 4.36).
Submission of a timely notice of intent allows an interested person to
file the competing preliminary permit application no later than 30 days
after the specified comment date for the particular application. A
competing preliminary permit application must conform with 18 CFR
4.30(b) and 4.36.
m. Competing Development Application--Any qualified development
applicant desiring to file a competing development application must
submit to the Commission, on or before a specified comment date for the
particular application, either a competing development application or a
notice of intent to file such an application. Submission of a timely
notice of intent to file a development application allows an interested
person to file the competing application no later than 120 days after
the specified comment date for the particular application. A competing
license application must conform with 18 CFR 4.30(b) and 4.36.
n. Notice of Intent--A notice of intent must specify the exact
name, business address, and telephone number of the prospective
applicant, and must include an unequivocal statement of intent to
submit, if such an application may be filed, either a preliminary
permit application or a development application (specify which type of
application). A notice of intent must be served on the applicant(s)
named in this public notice.
o. Proposed Scope of Studies Under Permit--A preliminary permit, if
issued, does not authorize construction. The term of the proposed
preliminary permit would be 36 months. The work proposed under the
preliminary permit would include economic analysis, preparation of
preliminary engineering plans, and a study of environmental impacts.
Based on the results of these studies, the Applicant would decide
whether to proceed with the preparation of a development application to
construct and operate the project.
p. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper; See 18 CFR 385.2001 (a)(1)(iii) and
the instructions on the Commission's Web site under ``e-filing'' link.
The Commission strongly encourages electronic filing.
q. Filing and Service of Responsive Documents--Any filings must
bear in all capital letters the title ``COMMENTS'', ``NOTICE OF INTENT
TO FILE COMPETING APPLICATION'', ``COMPETING APPLICATION'',
``PROTEST'', or ``MOTION TO INTERVENE'', as applicable, and the Project
Number of the particular application to which the filing refers. Any of
the above-named documents must be filed by providing the original and
the number of copies provided by the Commission's regulations to: The
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. An additional copy must be sent to Director,
Division of Hydropower Administration and Compliance, Federal Energy
Regulatory Commission, at the above-mentioned address. A copy of any
notice of intent, competing application or motion to intervene must
also be served upon each representative of the Applicant specified in
the particular application.
r. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-2778 Filed 6-1-05; 8:45 am]
BILLING CODE 6717-01-P