Notice of Filings, 30431-30432 [E5-2670]
Download as PDF
Federal Register / Vol. 70, No. 101 / Thursday, May 26, 2005 / Notices
commentors will be placed on the
Commission’s environmental mailing
list, will receive copies of the
environmental documents, and will be
notified of meetings associated with the
Commission’s environmental review
process. Environmental commentors
will not be required to serve copies of
filed documents on all other parties.
The Commission’s rules require that
persons filing comments in opposition
to the project provide copies of their
protests only to the applicant. However,
the non-party commentors will not
receive copies of all documents filed by
other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See, 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Comment Date: June 10, 2005.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–2659 Filed 5–25–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Filings
May 20, 2005.
Take notice that the Commission
received the following electric rate
filings.
Docket Numbers: ER05–6–023; EL04–
135–025; EL02–111–043; EL03–212–039.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator, Inc et al
submits joint revisions to the Joint
Operating Agreement with PJM
Interconnection, LLC under ER05–6 et
al.
Filed Date: 05/17/2005.
Accession Number: 20050519–0228.
Comment Date: 5 p.m. eastern time on
Tuesday, June 7, 2005.
Docket Numbers: ER05–651–001.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool
Inc submits revised version of the
interconnection agreement under ER05–
651.
Filed Date: 05/17/2005.
Accession Number: 20050519–0229.
VerDate jul<14>2003
19:11 May 25, 2005
Jkt 205001
Comment Date: 5 p.m. eastern time on
Tuesday, June 7, 2005.
Docket Numbers: ER05–977–000.
Applicants: Union Power Partners
L.P.
Description: Union Power Partners, LP
submits a Rate Schedule which specifies
its rates for providing cost-based
reactive support and voltage control
from Generation Sources Service etc
under ER05–977.
Filed Date: 05/17/2005.
Accession Number: 20050518–0166.
Comment Date: 5 p.m. eastern time on
Tuesday, June 7, 2005.
Docket Numbers: ER05–978–000.
Applicants: Virginia Electric Power
Company.
Description: Virginia Electric & Power
Co submits the Batesville Balancing
Authority Area Services Agreement with
J Aron & Co under ER05–978.
Filed Date: 05/17/2005.
Accession Number: 20050518–0162.
Comment Date: 5 p.m. eastern time on
Tuesday, June 7, 2005.
Docket Numbers: ER05–979–000.
Applicants: Access Energy
Cooperative.
Description: Access Energy Coop
submits its informational 2005 rate
redetermination filing as required under
its Contract for Wheeling of Electric
Power with Northeast Missouri Electric
Power Coop under ER05–979.
Filed Date: 05/17/2005.
Accession Number: 20050519–0272.
Comment Date: 5 p.m. eastern time on
Tuesday, June 7, 2005.
Docket Numbers: ER01–1403–003;
ER01–2968–004; ER01–845–003.
Applicants: FirstEnergy Operating
Companies.
Description: FirstEnergy Service Co
submits modifications to the market
based-rate power sales tariff etc under
ER01–1403 et al.
Filed Date: 05/16/2005.
Accession Number: 20050518–0164.
Comment Date: 5 p.m. eastern time on
Monday, June 6, 2005.
Docket Numbers: ER03–1079–004;
ER02–47–004; ER95–216–005; ER03–
725–004; ER02–309–004; ER02–1016–
002; ER99–2322–004; ER01–905–004;
ER00–1851–004; EL05–83–000.
Applicants: Aquila, Inc.
Description: Aquila, Inc, Aquila Long
Term, Inc et al submits a compliance
filing, pursuant to FERC’s 4/14/05 Order
under ER03–1079 et al.
Filed Date: 05/13/2005.
Accession Number: 20050518–0107.
Comment Date: 5 p.m. eastern time on
Friday, June 3, 2005.
Docket Numbers: ER05–667–001.
Applicants: Midwest Independent
Transmission System Operator, Inc.
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
30431
Description: Dakota Wind Harvest, Inc
and FPL Energy, LLC submit responses
to the April 28, 2005 Staff data request
relating to matters concerning the Large
Generator Interconnection Agreement,
etc. under ER05–667.
Filed Date: 05/13/2005.
Accession Number: 20050518–0108.
Comment Date: 5 p.m. eastern time on
Friday, June 3, 2005.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding
(ER05–
–000 docket numbers),
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
line to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For Assistance
with any FERC Online service, please email FERCOnlineSupport@ferc.gov or
E:\FR\FM\26MYN1.SGM
26MYN1
30432
Federal Register / Vol. 70, No. 101 / Thursday, May 26, 2005 / Notices
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–2670 Filed 5–25–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Monte TerHaar at (202) 502–6035 or at
monte.terhaar@ferc.gov.
Comments may be filed electronically
via the Internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the eFiling link. The Commission strongly
encourages electronic filings.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–2665 Filed 5–25–05; 8:45 am]
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
[Project Nos. 11810–004, 5044–008, and
2935–015]
DEPARTMENT OF ENERGY
City of Augusta, Avondale Mills Inc.,
Enterprise Mill LLC; Notice of
Availability of Draft Environmental
Assessment
May 20, 2005.
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission (Commission or FERC)
regulations contained in the Code of
Federal Regulations (CFR) (18 CFR part
380 [FERC Order No. 486, 52 FR
47897]), the Office of Energy Projects
staff (staff) reviewed the applications for
an Original Major License for the
Augusta Canal Project, a New Major
License for the Sibley Mill Project, and
a Subsequent Minor License for the
Enterprise Mill Project. Staff prepared a
single environmental assessment (EA)
for all three projects, which are located
on the Canal, adjacent to the Savannah
River, Richmond County, Augusta, GA.
The EA contains staff’s analysis of the
potential environmental effects of the
projects and concludes that licensing
the projects, with staff’s recommended
measures, would not constitute a major
federal action significantly affecting the
quality of the human environment.
A copy of the EA is available for
review at the Commission or may be
viewed on the Commission’s Web site at
https://www.ferc.gov, using the ‘‘eLibrary’’ link. Enter the docket number,
excluding the last three digits, to access
the document. For assistance, contact
FERC Online Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY,
contact (202) 502–8659.
Any comments should be filed within
45 days from the date of this notice and
should be addressed to Magalie R. Salas,
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. Please affix
Augusta Canal Project, P–11810; Sibley
Mill Project, P–5044; Enterprise Mill
Project, P–2935 to all comments. For
further information, please contact
VerDate jul<14>2003
19:11 May 25, 2005
Jkt 205001
Federal Energy Regulatory
Commission
[Docket Nos. CP04–223–000, CP04–293–
000, and CP04–358–000]
KeySpan LNG, L.P., Algonquin Gas
Transmission, L.L.C.; Notice of
Availability of the Final Environmental
Impact Statement for the Proposed
Keyspan LNG Facility Upgrade Project
May 20, 2005.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared a final
Environmental Impact Statement (EIS)
on the liquefied natural gas (LNG)
import terminal and natural gas pipeline
facilities proposed by KeySpan LNG,
L.P. (KeySpan LNG) and Algonquin Gas
Transmission, L.L.C. (Algonquin),
respectively, in the above-referenced
dockets (collectively referred to as the
KeySpan LNG Facility Upgrade Project).
The final EIS was prepared to satisfy
the requirements of the National
Environmental Policy Act (NEPA). The
staff concludes that If KeySpan LNG is
able to modify its facility so that current
federal safety standards are met, and if
the project is constructed and operated
in accordance with KeySpan LNG’s and
Algonquin’s proposed mitigation and
our recommended mitigation measures,
we believe that the proposed project
would have limited adverse
environmental impact. The final EIS
also evaluates alternatives to the
proposal, including system alternatives,
alternative sites for the LNG import
terminal, and pipeline alternatives.
The final EIS addresses the potential
environmental effects of the
construction and operation of the
following LNG and natural gas pipeline
facilities in Providence, Rhode Island:
• A ship unloading facility with a
single berth capable of receiving LNG
ships with cargo capacities of 71,500 to
145,000 cubic meters;
• Two 16-inch-diameter liquid
unloading arms and a 24-inch-diameter
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
liquid unloading line from the arms to
the LNG storage tank;
• Two vapor return blowers, a 12inch-diameter vapor arm, and an 8-inchdiameter vapor return line;
• Four boil-off-gas compressors and a
boil-off gas condenser;
• A two-stage LNG pumping system;
• An indirect fired vaporizer system
with a capacity of 375 million cubic feet
per day (MMcfd);
• Operations control buildings;
• Ancillary utilities and LNG
facilities;
• A 1.44-mile-long 24-inch-diameter
natural gas pipeline;
• A receipt point meter station and
30-inch-diameter pig launcher; and
• A 24-inch-diameter tap valve and
30-inch-diameter pig receiver at the
point where the new pipeline would tie
into Algonquin’s existing G–12 Lateral
pipeline system.
The purpose of KeySpan LNG’s
proposed upgrade is to convert the
existing KeySpan LNG storage facility to
an LNG terminal capable of receiving
marine deliveries, increase the facility’s
existing vaporization capacity from 150
MMcfd to 525 MMcfd, augment the
supply of LNG to fill the region’s LNG
storage facilities to meet peak day
needs, and provide 375 MMcfd of new,
firm, reliable baseload supply of natural
gas to Rhode Island and the New
England region.
The final EIS has been placed in the
public files of the FERC and is available
for distribution and public inspection
at: Federal Energy Regulatory
Commission, Public Reference Room,
888 First Street NE., Room 2A,
Washington, DC 20426, (202) 502–8371.
A limited number of copies are
available from the Public Reference
Room identified above. In addition,
copies of the final EIS have been mailed
to federal, state, and local agencies;
public interest groups; individuals and
affected landowners who requested a
copy of the final EIS; libraries;
newspapers; and parties to this
proceeding.
In accordance with the Council on
Environmental Quality’s (CEQ)
regulations implementing the NEPA, no
agency decision on a proposed action
may be made until 30 days after the U.S.
Environmental Protection Agency
publishes a notice of availability of a
final EIS. However, the CEQ regulations
provide an exception to this rule when
an agency decision is subject to a formal
internal appeal process which allows
other agencies or the public to make
their views known. In such cases, the
agency decision may be made at the
same time the notice of the final EIS is
published, allowing both periods to run
E:\FR\FM\26MYN1.SGM
26MYN1
Agencies
[Federal Register Volume 70, Number 101 (Thursday, May 26, 2005)]
[Notices]
[Pages 30431-30432]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-2670]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Filings
May 20, 2005.
Take notice that the Commission received the following electric
rate filings.
Docket Numbers: ER05-6-023; EL04-135-025; EL02-111-043; EL03-212-
039.
Applicants: Midwest Independent Transmission System Operator, Inc.
Description: Midwest Independent Transmission System Operator, Inc
et al submits joint revisions to the Joint Operating Agreement with PJM
Interconnection, LLC under ER05-6 et al.
Filed Date: 05/17/2005.
Accession Number: 20050519-0228.
Comment Date: 5 p.m. eastern time on Tuesday, June 7, 2005.
Docket Numbers: ER05-651-001.
Applicants: Southwest Power Pool, Inc.
Description: Southwest Power Pool Inc submits revised version of
the interconnection agreement under ER05-651.
Filed Date: 05/17/2005.
Accession Number: 20050519-0229.
Comment Date: 5 p.m. eastern time on Tuesday, June 7, 2005.
Docket Numbers: ER05-977-000.
Applicants: Union Power Partners L.P.
Description: Union Power Partners, LP submits a Rate Schedule which
specifies its rates for providing cost-based reactive support and
voltage control from Generation Sources Service etc under ER05-977.
Filed Date: 05/17/2005.
Accession Number: 20050518-0166.
Comment Date: 5 p.m. eastern time on Tuesday, June 7, 2005.
Docket Numbers: ER05-978-000.
Applicants: Virginia Electric Power Company.
Description: Virginia Electric & Power Co submits the Batesville
Balancing Authority Area Services Agreement with J Aron & Co under
ER05-978.
Filed Date: 05/17/2005.
Accession Number: 20050518-0162.
Comment Date: 5 p.m. eastern time on Tuesday, June 7, 2005.
Docket Numbers: ER05-979-000.
Applicants: Access Energy Cooperative.
Description: Access Energy Coop submits its informational 2005 rate
redetermination filing as required under its Contract for Wheeling of
Electric Power with Northeast Missouri Electric Power Coop under ER05-
979.
Filed Date: 05/17/2005.
Accession Number: 20050519-0272.
Comment Date: 5 p.m. eastern time on Tuesday, June 7, 2005.
Docket Numbers: ER01-1403-003; ER01-2968-004; ER01-845-003.
Applicants: FirstEnergy Operating Companies.
Description: FirstEnergy Service Co submits modifications to the
market based-rate power sales tariff etc under ER01-1403 et al.
Filed Date: 05/16/2005.
Accession Number: 20050518-0164.
Comment Date: 5 p.m. eastern time on Monday, June 6, 2005.
Docket Numbers: ER03-1079-004; ER02-47-004; ER95-216-005; ER03-725-
004; ER02-309-004; ER02-1016-002; ER99-2322-004; ER01-905-004; ER00-
1851-004; EL05-83-000.
Applicants: Aquila, Inc.
Description: Aquila, Inc, Aquila Long Term, Inc et al submits a
compliance filing, pursuant to FERC's 4/14/05 Order under ER03-1079 et
al.
Filed Date: 05/13/2005.
Accession Number: 20050518-0107.
Comment Date: 5 p.m. eastern time on Friday, June 3, 2005.
Docket Numbers: ER05-667-001.
Applicants: Midwest Independent Transmission System Operator, Inc.
Description: Dakota Wind Harvest, Inc and FPL Energy, LLC submit
responses to the April 28, 2005 Staff data request relating to matters
concerning the Large Generator Interconnection Agreement, etc. under
ER05-667.
Filed Date: 05/13/2005.
Accession Number: 20050518-0108.
Comment Date: 5 p.m. eastern time on Friday, June 3, 2005.
Any person desiring to intervene or to protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214) on or before 5 p.m. eastern time on the specified comment
date. It is not necessary to separately intervene again in a subdocket
related to a compliance filing if you have previously intervened in the
same docket. Protests will be considered by the Commission in
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Anyone filing a motion to
intervene or protest must serve a copy of that document on the
Applicant. In reference to filings initiating a new proceeding (ER05- -
000 docket numbers), interventions or protests submitted on or before
the comment deadline need not be served on persons other than the
Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://
www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling line to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426.
The filings in the above proceedings are accessible in the
Commission's eLibrary system by clicking on the appropriate link in the
above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the Web site that enables subscribers to receive email notification
when a document is added to a subscribed docket(s). For Assistance with
any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov or
[[Page 30432]]
call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-2670 Filed 5-25-05; 8:45 am]
BILLING CODE 6717-01-P