Enbridge Pipelines (KPC); Notice of Proposed Changes In FERC Gas Tariff, 28297 [E5-2457]
Download as PDF
Federal Register / Vol. 70, No. 94 / Tuesday, May 17, 2005 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP05–331–000]
Enbridge Pipelines (UTOS) LLC; Notice
of Proposed Changes in FERC Gas
Tariff
May 10, 2005.
Take notice that on May 5, 2005,
Enbridge Pipelines UTOS L.L.C. (UTOS)
tendered for filing as part of its FERC
Gas Tariff, Fifth Revised Volume No. 1,
the following tariff sheets, to become
effective May 6, 2005:
First Revised Sheet No. 27
Original Sheet No. 31A
Original Sheet No. 31B
First Revised Sheet No. 36
Original Sheet No. 39A
Original Sheet No. 39B
Third Revised Sheet No. 100
Second Revised Sheet No. 127
First Revised Sheet No. 163
Original Sheet No. 163A
15:22 May 16, 2005
Magalie R. Salas,
Secretary.
[FR Doc. E5–2456 Filed 5–16–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
UTOS states that it is filing these tariff
sheets to amend its general terms and
conditions to provide for specific types
of discounts in its tariff, consistent with
Commission policy.
UTOS states that copies of its filing
have been mailed to all affected
customers of UTOS and interested State
commissions.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
VerDate jul<14>2003
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Jkt 205001
[Docket No. RP05–332–000]
Enbridge Pipelines (KPC); Notice of
Proposed Changes In FERC Gas Tariff
May 10, 2005.
Take notice that on May 5, 2005,
Enbridge Pipelines (KPC) tendered for
filing as part of its FERC Gas Tariff, First
Revised Volume No. 1, the following
tariff sheets, to become effective May 6,
2005:
First Revised Sheet No. 100A
Second Revised Sheet No. 125
Original Sheet No. 125A
Second Revised Sheet No. 302
Original Sheet No. 310B
Original Sheet No. 310C
First Revised Sheet No. 313
Original Sheet No. 322B
Original Sheet No. 322C
Second Revised Sheet No. 324
Original Sheet No. 333B
Original Sheet No. 333C
First Revised Sheet No. 337
Original Sheet No. 343A
Original Sheet No. 343B
Second Revised Sheet No. 346
Original Sheet No. 355B
Original Sheet No. 355C
First Revised Sheet No. 358
Original Sheet No. 366B
Original Sheet No. 366C
Frm 00029
Fmt 4703
Sfmt 4703
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E5–2457 Filed 5–16–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
KPC states that it is filing these tariff
sheets to amend its general terms and
conditions to provide for specific types
of discounts in its tariff, consistent with
Commission policy.
KPC states that copies of its filing
have been mailed to all affected
customers of KPC and interested state
commissions.
Any person desiring to intervene or to
protest this filing must file in
PO 00000
28297
[Docket No. RP05–336–000]
Garden Banks Gas Pipeline, LLC;
Notice of Proposed Changes in FERC
Gas Tariff
May 11, 2005.
Take notice that on May 9, 2005,
Garden Banks Gas Pipeline, LLC
(Garden Banks) tendered for filing as
part of its FERC Gas Tariff, Original
Volume No. 1, the following tariff
E:\FR\FM\17MYN1.SGM
17MYN1
Agencies
[Federal Register Volume 70, Number 94 (Tuesday, May 17, 2005)]
[Notices]
[Page 28297]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-2457]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP05-332-000]
Enbridge Pipelines (KPC); Notice of Proposed Changes In FERC Gas
Tariff
May 10, 2005.
Take notice that on May 5, 2005, Enbridge Pipelines (KPC) tendered
for filing as part of its FERC Gas Tariff, First Revised Volume No. 1,
the following tariff sheets, to become effective May 6, 2005:
First Revised Sheet No. 100A
Second Revised Sheet No. 125
Original Sheet No. 125A
Second Revised Sheet No. 302
Original Sheet No. 310B
Original Sheet No. 310C
First Revised Sheet No. 313
Original Sheet No. 322B
Original Sheet No. 322C
Second Revised Sheet No. 324
Original Sheet No. 333B
Original Sheet No. 333C
First Revised Sheet No. 337
Original Sheet No. 343A
Original Sheet No. 343B
Second Revised Sheet No. 346
Original Sheet No. 355B
Original Sheet No. 355C
First Revised Sheet No. 358
Original Sheet No. 366B
Original Sheet No. 366C
KPC states that it is filing these tariff sheets to amend its
general terms and conditions to provide for specific types of discounts
in its tariff, consistent with Commission policy.
KPC states that copies of its filing have been mailed to all
affected customers of KPC and interested state commissions.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed in accordance with the provisions of
Section 154.210 of the Commission's regulations (18 CFR 154.210).
Anyone filing an intervention or protest must serve a copy of that
document on the Applicant. Anyone filing an intervention or protest on
or before the intervention or protest date need not serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E5-2457 Filed 5-16-05; 8:45 am]
BILLING CODE 6717-01-P