Environmental Impacts Statements; Notice of Availability, 25567 [05-9587]
Download as PDF
Federal Register / Vol. 70, No. 92 / Friday, May 13, 2005 / Notices
ENVIRONMENTAL PROTECTION
AGENCY
EIS No. 20050186, Draft EIS, AFS, NY,
Finger Lakes National Forest Project,
Proposed Land and Resource
Management Plan, Forest Plan
Revision, Implementation, Seneca and
Schuyler Counties, NY, Comment
Period Ends: 08/15/2005, Contact: Jay
Strand 802–767–4261. Ext 522.
EIS No. 20050187, Draft EIS, SFW, MN,
Upper Mississippi National Wildlife
and Fish Refuge Comprehensive
Conservation Plan (CCP)
Implementation, MN, WI, IL and IA,
Comment Period Ends: 08/31/2005,
Contact: Don Hultman 507–452–4232.
This document is available on the
Internet at: https://www.fws.gov/
midwest/planning/uppermiss/
EIS No. 20050188, Final EIS, FTA, 00,
Permanent World Trade Center (WTC)
PATH Terminal Project,
Reconstruction of a Permanent
Terminal at the WTC Site in Lower
Manhattan, Port Authority TransHudson (PATH), Several Permits
Required for Approval, The Port
Authority of New York and New
Jersey, NY and NJ, Wait Period Ends:
06/13/2005, Contact: Bernard Cohen
212–668–1770.
EIS No. 20050189, Draft EIS, COE, PA,
The Town of Bloomsburg, Columbia
County, Pennsylvania Flood Damage
Reduction Project, Implementation,
Integrated Feasibility Report,
Susquhanna River and Fishing Creek,
Town of Bloomsburg, Columbia
County, PA, Comment Period Ends:
06/27/2005, Contact: Jeff Trulick 410–
962–6715.
EIS No. 20050190, Draft EIS, FHA, MI,
Detroit Intermodal Freight Terminal
(DIFT) Project, Proposes Improvement
to Intermodal Freight Terminals in
Wayne and Oakland Counties, MI,
Comment Period Ends: , 08/16/2005,
Contact: Abdelmoez Abdalla 517–
702–1820.
[ER–FRL–6663–3]
Amended Notices
Environmental Impacts Statements;
Notice of Availability
EIS No. 20050105, Draft EIS, AFS, MI,
Huron-Manistee National Forests,
Proposed Land and Resource
Management Plan, Implementation,
Several Counties, MI, 06/20/2005,
Contact: Jeff Pullen 231–775–2421
Revision of FR Notice Published on
03/18/2005: CEQ Comment Period
Ending 06/16/2005 has been Extended
to 06/20/2005.
EIS No. 20050118, Draft EIS, AFS, MI,
Ottawa National Forest, Proposed
Land and Resource Management Plan,
Forest Plan Revision, Implementation,
Baraga, Gogebic, Houghton, Iron,
Marquette and Ontonagan Counties,
MI, Comment Period Ends 06/27/
2005, Contact: Robert Brenner 906–
Information on Modifying the
Extending Plan of Operations (Plan),
Gold Acres Mining District, Launder
County, NV.
Summary: EPA expressed concerns
that BLM has deferred until mine
closure the designation and evaluation
of post-mining beneficial uses and
applicability of beneficial use
requirements for pit lakes and concerns
regarding the long-term mitigation and
monitoring fund. EPA is also concerned
that the Final SEIS does not address the
issues critical to establishing the
effectiveness of the fund and whether it
will be available for future mitigation
and monitoring needs should they arise.
EPA recommended additional
information on these issues be included
in the Record of Decision.
EIS No. 20050115, ERP No. FS–NRC–
E06023–AL, Generic EIS—License
Renewal of Nuclear Plants, Joseph M.
Farley Nuclear Plants, Units 1 and 2,
Supplemental 18 to NUREG–1437
(TAC NOS. MC0768 and MC0769;
Houston County, AL.
Summary: EPA continues to have
environmental concerns about the
availability of long-term offsite storages
of radioactive waste, and future surface
water withdrawals for plant operations
which could be affected by State
agreements. Radiological monitoring of
all plant effluents, and appropriate
storage of radioactive waste will be
necessary during the license renewal
period.
Dated: May 10, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 05–9586 Filed 5–12–05; 8:45 am]
BILLING CODE 6560–50–P
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/. Weekly receipt of
Environmental Impact Statements Filed
05/02/2005 Through 05/06/2005
Pursuant to 40 CFR 1506.9.
EIS No. 20050185, Final EIS, NRC, MI,
Generic—Donald C. Cook Nuclear
Plant, Units No. 1 and 2, (TAC No.
MC1221 and MC1222) License
Renewal, Supplement 20 to NUREG
1437, Berrien County, MI, Wait Period
Ends: 06/13/2005, Contact: William
Dam, 301–415–4014.
VerDate jul<14>2003
15:59 May 12, 2005
Jkt 205001
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
25567
932–1330 Revision of FR Notice
Published on 03/25/2005: CEQ
Comment Period Ending on 06/23/
2005 has been Extended to 06/27/
2005.
EIS No. 20050153, Final EIS, FHW, UT,
Southern Corridor Construction, I–15
at Reference Post 2 in St. George to
UT–9 near Hurricane, Funding, Rightof-Way Grant and U.S. Army COE
Section 404 Permit Issuance, St.
George, Washington and Hurricane,
Washington County, UT, 06/22/2005,
Wait Period Ends: 06/22/2005,
Contact: Gregory Punske 801–963–
0182.
Revision of FR Notice Published on
04/22/2005: CEQ Comment Period
Ending 05/23/2005 has been Extended
to 05/22/2005.
Dated: May 10, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 05–9587 Filed 5–12–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[OPPT–2005–0030; FRL–7715–4]
Certain New Chemicals; Receipt and
Status Information
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: Section 5 of the Toxic
Substances Control Act (TSCA) requires
any person who intends to manufacture
(defined by statute to include import) a
new chemical (i.e., a chemical not on
the TSCA Inventory) to notify EPA and
comply with the statutory provisions
pertaining to the manufacture of new
chemicals. Under sections 5(d)(2) and
5(d)(3) of TSC, EPA is required to
publish a notice of receipt of a
premanufacture notice (PMN) or an
application for a test marketing
exemption (TME), and to publish
periodic status reports on the chemicals
under review and the receipt of notices
of commencement to manufacture those
chemicals. This status report, which
covers the period from April 14, 2005 to
April 27, 3005, consists of the PMNs
pending or expired, and the notices of
commencement to manufacture a new
chemical that the Agency has received
under TSCA section 5 during this time
period.
DATES: Comments identified by the
docket identification (ID) number
OPPT–2005–0030 and the specific PMN
E:\FR\FM\13MYN1.SGM
13MYN1
Agencies
[Federal Register Volume 70, Number 92 (Friday, May 13, 2005)]
[Notices]
[Page 25567]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-9587]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6663-3]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements Filed 05/02/2005
Through 05/06/2005 Pursuant to 40 CFR 1506.9.
EIS No. 20050185, Final EIS, NRC, MI, Generic--Donald C. Cook Nuclear
Plant, Units No. 1 and 2, (TAC No. MC1221 and MC1222) License Renewal,
Supplement 20 to NUREG 1437, Berrien County, MI, Wait Period Ends: 06/
13/2005, Contact: William Dam, 301-415-4014.
EIS No. 20050186, Draft EIS, AFS, NY, Finger Lakes National Forest
Project, Proposed Land and Resource Management Plan, Forest Plan
Revision, Implementation, Seneca and Schuyler Counties, NY, Comment
Period Ends: 08/15/2005, Contact: Jay Strand 802-767-4261. Ext 522.
EIS No. 20050187, Draft EIS, SFW, MN, Upper Mississippi National
Wildlife and Fish Refuge Comprehensive Conservation Plan (CCP)
Implementation, MN, WI, IL and IA, Comment Period Ends: 08/31/2005,
Contact: Don Hultman 507-452-4232.
This document is available on the Internet at: https://www.fws.gov/
midwest/planning/uppermiss/
EIS No. 20050188, Final EIS, FTA, 00, Permanent World Trade Center
(WTC) PATH Terminal Project, Reconstruction of a Permanent Terminal at
the WTC Site in Lower Manhattan, Port Authority Trans-Hudson (PATH),
Several Permits Required for Approval, The Port Authority of New York
and New Jersey, NY and NJ, Wait Period Ends: 06/13/2005, Contact:
Bernard Cohen 212-668-1770.
EIS No. 20050189, Draft EIS, COE, PA, The Town of Bloomsburg, Columbia
County, Pennsylvania Flood Damage Reduction Project, Implementation,
Integrated Feasibility Report, Susquhanna River and Fishing Creek, Town
of Bloomsburg, Columbia County, PA, Comment Period Ends: 06/27/2005,
Contact: Jeff Trulick 410-962-6715.
EIS No. 20050190, Draft EIS, FHA, MI, Detroit Intermodal Freight
Terminal (DIFT) Project, Proposes Improvement to Intermodal Freight
Terminals in Wayne and Oakland Counties, MI, Comment Period Ends: , 08/
16/2005, Contact: Abdelmoez Abdalla 517-702-1820.
Amended Notices
EIS No. 20050105, Draft EIS, AFS, MI, Huron-Manistee National Forests,
Proposed Land and Resource Management Plan, Implementation, Several
Counties, MI, 06/20/2005, Contact: Jeff Pullen 231-775-2421 Revision of
FR Notice Published on 03/18/2005: CEQ Comment Period Ending 06/16/2005
has been Extended to 06/20/2005.
EIS No. 20050118, Draft EIS, AFS, MI, Ottawa National Forest, Proposed
Land and Resource Management Plan, Forest Plan Revision,
Implementation, Baraga, Gogebic, Houghton, Iron, Marquette and
Ontonagan Counties, MI, Comment Period Ends 06/27/2005, Contact: Robert
Brenner 906-932-1330 Revision of FR Notice Published on 03/25/2005: CEQ
Comment Period Ending on 06/23/2005 has been Extended to 06/27/2005.
EIS No. 20050153, Final EIS, FHW, UT, Southern Corridor Construction,
I-15 at Reference Post 2 in St. George to UT-9 near Hurricane, Funding,
Right-of-Way Grant and U.S. Army COE Section 404 Permit Issuance, St.
George, Washington and Hurricane, Washington County, UT, 06/22/2005,
Wait Period Ends: 06/22/2005, Contact: Gregory Punske 801-963-0182.
Revision of FR Notice Published on 04/22/2005: CEQ Comment Period
Ending 05/23/2005 has been Extended to 05/22/2005.
Dated: May 10, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 05-9587 Filed 5-12-05; 8:45 am]
BILLING CODE 6560-50-P