Granite Ridge Energy, LLC, et al.; Electric Rate and Corporate Filings, 24570-24571 [E5-2268]
Download as PDF
24570
Federal Register / Vol. 70, No. 89 / Tuesday, May 10, 2005 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Commission’s Order issued March 24,
2005, 110 FERC ¶ 61,340. Wisconsin
Electric states that the proposed filing
incorporates the change of status
reporting requirements adopted by the
Commission in Order 652, Reporting
Requirements for Changes in Status for
Public Utilities with Market-Based Rate
Authority, 110 FERC ¶ 61,097.
Wisconsin Electric states that copies
of this filing were served on all parties
to this proceeding.
Comment Date: 5 p.m. eastern time on
May 16, 2005.
7. Midwest Independent Transmission
System Operator, Inc.
[Docket No. ER05–662–001]
1. Granite Ridge Energy, LLC;
JPMorgan Chase Bank, N.A.; Merrill
Lynch Credit Products, LLC; and SPO
Partners II, L.P.
4. California Independent System
Operator Corporation
Take notice that on April 25, 2005,
the Midwest Independent Transmission
System Operator, Inc. (Midwest ISO)
amended its March 1, 2005 filing in
Docket No. ER05–662–000 to provide an
exhibit. Midwest ISO requests an
effective date of February 23, 2005.
Midwest ISO states that a copy of this
filing was served on all parties on the
service list maintained by the Secretary
in this proceeding.
Comment Date: 5 p.m. eastern time on
May 16, 2005.
[Docket Nos. ER03–1102–008 and EL05–14–
001]
8. ATPower & Energy, LLC
[Docket No. EC05–75–000]
Take notice that on April 25, 2005,
the California lndependent System
Operator Corporation (CAISO)
submitted a filing in compliance with
the Commission order issued March 24,
2005 in Docket No. ER03–1102–003, et
al., 110 FERC ¶ 61,333.
The CAISO states that this filing has
been served upon all parties on the
official service lists for the captioned
dockets. In addition, the CAISO has
posted this filing on the CAISO Home
Page.
Comment Date: 5 p.m. eastern time on
May 16, 2005.
[Docket No. ER05–859–000]
5. Devon Power LLC; Middletown
Power LLC; and Montville Power
[Docket No. ER05–862–000]
[Docket No. EC05–75–000, et al.]
Granite Ridge Energy, LLC, et al.;
Electric Rate and Corporate Filings
May 2, 2005.
The following filings have been made
with the Commission. The filings are
listed in ascending order within each
docket classification.
Take notice that on April 27, 2005,
Granite Ridge Energy, LLC (Granite
Ridge), JPMorgan Chase Bank, N.A.
(JPMCB), Merrill Lynch Credit Products,
LLC (MLCP), and SPO Partners II, L.P.
(SPO) filed an application pursuant to
section 203 of the Federal Power Act,
requesting the Commission to authorize
the indirect disposition of jurisdictional
facilities that may result from the
transfer of indirect equity interests in
Granite Ridge to and from JPMCB,
MLCP, SPO and Castlerigg Partners, L.P.
Comment Date: May 18, 2005.
2. Brooklyn Navy Yard Cogeneration
Partners, L.P.; BMC Acquisition LLC: B–
41 Acquisition LLC; YC Acquisition
LLC; and York Research Corporation
[Docket No. EC05–76–000]
Take notice that on April 28, 2005,
BMC Acquisition LLC; B–41 Acquisition
LLC; YC Acquisition LLC (collectively,
Buyers); Brooklyn Navy Yard
Cogeneration Partners, L.P. (BNYCP);
and York Research Corporation
(collectively, with Buyers and BNYCP,
Applicants), tendered for filing with the
Federal Energy Regulatory Commission,
pursuant to section 203 of the Federal
Power Act and Part 33 of the
Commission’s regulations, an
application for authorization that would
allow the Buyers to acquire and exercise
an option to purchase upstream
ownership interests in BNYCP. Pursuant
to 18 CFR 33.9 (2004), the Applicants
seek privileged treatment for Exhibits
C–2 and C–4 to the application.
Comment Date: 5 p.m. eastern time on
May 18, 2005.
3. Wisconsin Electric Power Company
[Docket No. ER98–855–006]
Take notice that on April 25, 2005,
Wisconsin Electric Power Company
(Wisconsin Electric) submitted a
compliance filing pursuant to the
VerDate jul<14>2003
16:17 May 09, 2005
Jkt 205001
[Docket No. ER04–23–013]
Take notice that on April 20, 2005,
Devon Power LLC, Middletown Power
LLC and Montville Power, (collectively
NRG) tendered an errata to their filing
submitted March 1, 2005, in Docket No.
ER04–23–010.
Comment Date: 5 p.m. eastern time on
May 11, 2005.
6. Dartmouth PPA Holdings LLC and
Dartmouth Power Associates Limited
Partnership
Take notice that on April 25, 2005,
ATPower & Energy, LLC (ATPower &
Energy) petitioned the Commission for
acceptance of ATPower & Energy Rate
Schedule FERC No. 1; the granting of
certain blanket approvals, including the
authority to sell electricity at marketbased rates; and the waiver of certain
Commission regulations.
Comment Date: 5 p.m. eastern time on
May 16, 2005.
9. Midwest Independent Transmission
System Operator, Inc.
Take notice that on April 25, 2005,
the Midwest Independent Transmission
System Operator, Inc. (Midwest ISO)
submitted a Letter Agreement among
PSEG Lawrenceburg Energy Company
LLC, Cinergy Services, Inc., as agent for
The Cincinnati Gas & Electric Company
and the Midwest ISO.
Midwest ISO states that a copy of this
filing was served on PSEG
Lawrenceburg Energy Company LLC
and Cinergy Services, Inc.
Comment Date: 5 p.m. eastern time on
May 16, 2005.
[Docket Nos. ER05–598–001 and ER05–599–
001]
10. Wisconsin Electric Power Company
Take notice that on April 25, 2005,
Dartmouth PPA Holdings, LLC, and
Dartmouth Power Associates Limited
Partnership submitted a compliance
filing pursuant to the Commission’s
order issued April 14, 2005 in Docket
Nos. ER05–598–000 and ER05–599–000,
111 FERC ¶ 61, 039, to incorporate the
change of status reporting requirements
adopted by the Commission in Order
652, Reporting Requirements for
Changes in Status for Public Utilities
with Market-Based Rate Authority, 110
FERC ¶ 61,097.
Comment Date: 5 p.m. eastern time on
May 16, 2005.
Take notice that on April 25, 2005,
Wisconsin Electric Power Company
(Wisconsin Electric) submitted revisions
to its Market Based Power Sales and
Resale Transmission Tariff, FERC
Electric Tariff, Original Volume No. 8.
Wisconsin Electric states that the
proposed amendments are minor
revisions to correct dates and
typographical errors on two tariff sheets.
Wisconsin Electric states that copies
of this filing were served on all parties
listed In Attachment C to the filing.
Comment Date: 5 p.m. eastern time on
May 16, 2005.
PO 00000
Frm 00073
Fmt 4703
Sfmt 4703
[Docket No. ER05–863–000]
E:\FR\FM\10MYN1.SGM
10MYN1
Federal Register / Vol. 70, No. 89 / Tuesday, May 10, 2005 / Notices
11. Sheboygan Power, LLC
DEPARTMENT OF ENERGY
[Docket No. ER05–869–000]
Federal Energy Regulatory
Commission
Take notice that on April 22, 2005,
Alliant Energy Corporate Services, Inc.,
on behalf of Sheboygan Power, LLC
(SPLLC), submitted for filing with the
Commission SPLLC’s Rate Schedule No.
1 for Short-Term Sales of Test Power to
permit SPLLC to sell wholesale test
electric capacity and energy to
Wisconsin Power and Light Company
during the testing of SPLLC’s electric
generating facility. Alliant requests an
effective date of April 28, 2005.
Comment Date: 5 p.m. eastern time on
May 16, 2005.
Standard Paragraph
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all parties to this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible online at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–2268 Filed 5–9–05; 8:45 am]
[Docket No. ER95–1528–011, et al.]
Wisconsin Public Service Corporation,
et al.; Electric Rate and Corporate
Filings
April 29, 2005.
The following filings have been made
with the Commission. The filings are
listed in ascending order within each
docket classification.
1. Sheboygan Power, LLC and
Wisconsin Power and Light Company
[Docket No. EC05–73–000]
Take notice that on April 26, 2005,
Alliant Energy Corporate Services, Inc.,
(AECS) on behalf of Sheboygan Power,
LLC (SPLLC), and Wisconsin Power and
Light Company (WPL), (collectively,
Applicants) filed an application
requesting the Commission to authorize
SPLLC’s transfer of control over limited
FERC-jurisdictional generator
interconnection facilities to WPL (the
transfer). AECS states that the transfer
will arise in the context of SPLLC’s
development and lease to WPL of a new,
approximately 300 MW generating
facility in Wisconsin pursuant to
Wisconsin’s ‘‘Leased Generation Law’’,
subject to state regulatory oversight and
approval.
Comment Date: 5 p.m. eastern time on
May 17, 2005.
2. Oklahoma Municipal Power
Authority v. American Electric Power
Service Corp.
[Docket No. EL05–38–002
Take notice that, on April 25, 2005,
American Electric Power Service
Corporation (AEP) submitted an
unexecuted Network Integration
Transmission Service Agreement with
Oklahoma Municipal Power Authority
pursuant to the Commission’s order
issued March 4, 2005 in Oklahoma
Municipal Power Authority v. American
Electric Power Service Corp., 110 FERC
¶ 61,228 (2005).
AEP states that copies of the filing
were served on parties on the official
service list in the above-captioned
proceeding.
Comment Date: 5 p.m. eastern time on
May 16, 2005.
BILLING CODE 6717–01–P
VerDate jul<14>2003
16:17 May 09, 2005
Jkt 205001
PO 00000
Frm 00074
Fmt 4703
Sfmt 4703
24571
3. Wisconsin Public Service
Corporation, WPS Power Development,
Inc., and WPS Energy Services, Inc.
(Docket Nos. ER95–1528–011 and
ER96–1088–036); Combined Locks
Energy Center, LLC (ER01–2659–005);
WPS Empire State, Inc. (ER02–2199–
003); WPS Beaver Falls Generation,
LLC (ER03–54–003); WPS Niagara
Generation, LLC (ER03–55–003); WPS
Syracuse Generation, LLC (ER03–56–
003); Mid-American Power, LLC (ER96–
1858–016); Quest Energy, LLC (ER03–
674–003); Sunbury Generation, LLC
(ER99–3420–005) WPS Canada
Generation, Inc. and WPS New England
Generation, Inc. (ER99–1936–004); WPS
Westwood Generation, LLC (ER01–
1114–004); Advantage Energy, Inc.
(ER97–2758–011); and Upper Peninsula
Power Company (ER05–89–00)
Take notice that on April 25, 2005,
WPS Resources Corporation (WPSR), on
behalf of its subsidiaries listed in the
caption above, tendered for filing tariff
sheets (Tariff Sheets) in compliance
with the Commission’s March 25, 2005
order in Wisconsin Public Service
Corporation, et al., 110 FERC ¶ 61,353
(2005).
WPSR states that a copy of the filing
was served upon all parties to the
Commission’s official service lists in the
above-captioned dockets and the Public
Service Commission of Wisconsin.
Comment Date: 5 p.m. eastern time on
May 16, 2005.
4. Northeast Utilities Service Company;
Select Energy, Inc.; Select Energy New
York, Inc; and Northeast Generation
Company
[ER99–4463–005, ER99–14–011, and ER02–
556–006]
Take notice that on April 25, 2005,
Northeast Utilities Service Company, on
behalf of The Connecticut Light and
Power Company, Western
Massachusetts Electric Company,
Holyoke Water Power Company,
Holyoke Power and Electric Company,
and Public Service of New Hampshire
(the NU Operating Companies); Select
Energy, Inc.; Select Energy New York,
Inc.; and Northeast Generation
Company jointly submitted a
compliance filing pursuant to the
Commission’s order issued March 24,
2005 in Docket No. ER96–496–010, et
al., 110 FERC ¶ 61,237.
Comment Date: 5 p.m. eastern time on
May 13, 2005.
5. Direct Energy Services, LLC
[Docket No. ER05–876–000]
Take notice that on April 25, 2005,
Direct Energy Services, LLC (Seller)
petitioned the Commission for an order:
E:\FR\FM\10MYN1.SGM
10MYN1
Agencies
[Federal Register Volume 70, Number 89 (Tuesday, May 10, 2005)]
[Notices]
[Pages 24570-24571]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-2268]
[[Page 24570]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EC05-75-000, et al.]
Granite Ridge Energy, LLC, et al.; Electric Rate and Corporate
Filings
May 2, 2005.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. Granite Ridge Energy, LLC; JPMorgan Chase Bank, N.A.; Merrill Lynch
Credit Products, LLC; and SPO Partners II, L.P.
[Docket No. EC05-75-000]
Take notice that on April 27, 2005, Granite Ridge Energy, LLC
(Granite Ridge), JPMorgan Chase Bank, N.A. (JPMCB), Merrill Lynch
Credit Products, LLC (MLCP), and SPO Partners II, L.P. (SPO) filed an
application pursuant to section 203 of the Federal Power Act,
requesting the Commission to authorize the indirect disposition of
jurisdictional facilities that may result from the transfer of indirect
equity interests in Granite Ridge to and from JPMCB, MLCP, SPO and
Castlerigg Partners, L.P.
Comment Date: May 18, 2005.
2. Brooklyn Navy Yard Cogeneration Partners, L.P.; BMC Acquisition LLC:
B-41 Acquisition LLC; YC Acquisition LLC; and York Research Corporation
[Docket No. EC05-76-000]
Take notice that on April 28, 2005, BMC Acquisition LLC; B-41
Acquisition LLC; YC Acquisition LLC (collectively, Buyers); Brooklyn
Navy Yard Cogeneration Partners, L.P. (BNYCP); and York Research
Corporation (collectively, with Buyers and BNYCP, Applicants), tendered
for filing with the Federal Energy Regulatory Commission, pursuant to
section 203 of the Federal Power Act and Part 33 of the Commission's
regulations, an application for authorization that would allow the
Buyers to acquire and exercise an option to purchase upstream ownership
interests in BNYCP. Pursuant to 18 CFR 33.9 (2004), the Applicants seek
privileged treatment for Exhibits C-2 and C-4 to the application.
Comment Date: 5 p.m. eastern time on May 18, 2005.
3. Wisconsin Electric Power Company
[Docket No. ER98-855-006]
Take notice that on April 25, 2005, Wisconsin Electric Power
Company (Wisconsin Electric) submitted a compliance filing pursuant to
the Commission's Order issued March 24, 2005, 110 FERC ] 61,340.
Wisconsin Electric states that the proposed filing incorporates the
change of status reporting requirements adopted by the Commission in
Order 652, Reporting Requirements for Changes in Status for Public
Utilities with Market-Based Rate Authority, 110 FERC ] 61,097.
Wisconsin Electric states that copies of this filing were served on
all parties to this proceeding.
Comment Date: 5 p.m. eastern time on May 16, 2005.
4. California Independent System Operator Corporation
[Docket Nos. ER03-1102-008 and EL05-14-001]
Take notice that on April 25, 2005, the California lndependent
System Operator Corporation (CAISO) submitted a filing in compliance
with the Commission order issued March 24, 2005 in Docket No. ER03-
1102-003, et al., 110 FERC ] 61,333.
The CAISO states that this filing has been served upon all parties
on the official service lists for the captioned dockets. In addition,
the CAISO has posted this filing on the CAISO Home Page.
Comment Date: 5 p.m. eastern time on May 16, 2005.
5. Devon Power LLC; Middletown Power LLC; and Montville Power
[Docket No. ER04-23-013]
Take notice that on April 20, 2005, Devon Power LLC, Middletown
Power LLC and Montville Power, (collectively NRG) tendered an errata to
their filing submitted March 1, 2005, in Docket No. ER04-23-010.
Comment Date: 5 p.m. eastern time on May 11, 2005.
6. Dartmouth PPA Holdings LLC and Dartmouth Power Associates Limited
Partnership
[Docket Nos. ER05-598-001 and ER05-599-001]
Take notice that on April 25, 2005, Dartmouth PPA Holdings, LLC,
and Dartmouth Power Associates Limited Partnership submitted a
compliance filing pursuant to the Commission's order issued April 14,
2005 in Docket Nos. ER05-598-000 and ER05-599-000, 111 FERC ] 61, 039,
to incorporate the change of status reporting requirements adopted by
the Commission in Order 652, Reporting Requirements for Changes in
Status for Public Utilities with Market-Based Rate Authority, 110 FERC
] 61,097.
Comment Date: 5 p.m. eastern time on May 16, 2005.
7. Midwest Independent Transmission System Operator, Inc.
[Docket No. ER05-662-001]
Take notice that on April 25, 2005, the Midwest Independent
Transmission System Operator, Inc. (Midwest ISO) amended its March 1,
2005 filing in Docket No. ER05-662-000 to provide an exhibit. Midwest
ISO requests an effective date of February 23, 2005.
Midwest ISO states that a copy of this filing was served on all
parties on the service list maintained by the Secretary in this
proceeding.
Comment Date: 5 p.m. eastern time on May 16, 2005.
8. ATPower & Energy, LLC
[Docket No. ER05-859-000]
Take notice that on April 25, 2005, ATPower & Energy, LLC (ATPower
& Energy) petitioned the Commission for acceptance of ATPower & Energy
Rate Schedule FERC No. 1; the granting of certain blanket approvals,
including the authority to sell electricity at market-based rates; and
the waiver of certain Commission regulations.
Comment Date: 5 p.m. eastern time on May 16, 2005.
9. Midwest Independent Transmission System Operator, Inc.
[Docket No. ER05-862-000]
Take notice that on April 25, 2005, the Midwest Independent
Transmission System Operator, Inc. (Midwest ISO) submitted a Letter
Agreement among PSEG Lawrenceburg Energy Company LLC, Cinergy Services,
Inc., as agent for The Cincinnati Gas & Electric Company and the
Midwest ISO.
Midwest ISO states that a copy of this filing was served on PSEG
Lawrenceburg Energy Company LLC and Cinergy Services, Inc.
Comment Date: 5 p.m. eastern time on May 16, 2005.
10. Wisconsin Electric Power Company
[Docket No. ER05-863-000]
Take notice that on April 25, 2005, Wisconsin Electric Power
Company (Wisconsin Electric) submitted revisions to its Market Based
Power Sales and Resale Transmission Tariff, FERC Electric Tariff,
Original Volume No. 8. Wisconsin Electric states that the proposed
amendments are minor revisions to correct dates and typographical
errors on two tariff sheets.
Wisconsin Electric states that copies of this filing were served on
all parties listed In Attachment C to the filing.
Comment Date: 5 p.m. eastern time on May 16, 2005.
[[Page 24571]]
11. Sheboygan Power, LLC
[Docket No. ER05-869-000]
Take notice that on April 22, 2005, Alliant Energy Corporate
Services, Inc., on behalf of Sheboygan Power, LLC (SPLLC), submitted
for filing with the Commission SPLLC's Rate Schedule No. 1 for Short-
Term Sales of Test Power to permit SPLLC to sell wholesale test
electric capacity and energy to Wisconsin Power and Light Company
during the testing of SPLLC's electric generating facility. Alliant
requests an effective date of April 28, 2005.
Comment Date: 5 p.m. eastern time on May 16, 2005.
Standard Paragraph
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant and all parties to this proceeding.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible online at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-2268 Filed 5-9-05; 8:45 am]
BILLING CODE 6717-01-P