Download as PDF 24570 Federal Register / Vol. 70, No. 89 / Tuesday, May 10, 2005 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Commission’s Order issued March 24, 2005, 110 FERC ¶ 61,340. Wisconsin Electric states that the proposed filing incorporates the change of status reporting requirements adopted by the Commission in Order 652, Reporting Requirements for Changes in Status for Public Utilities with Market-Based Rate Authority, 110 FERC ¶ 61,097. Wisconsin Electric states that copies of this filing were served on all parties to this proceeding. Comment Date: 5 p.m. eastern time on May 16, 2005. 7. Midwest Independent Transmission System Operator, Inc. [Docket No. ER05–662–001] 1. Granite Ridge Energy, LLC; JPMorgan Chase Bank, N.A.; Merrill Lynch Credit Products, LLC; and SPO Partners II, L.P. 4. California Independent System Operator Corporation Take notice that on April 25, 2005, the Midwest Independent Transmission System Operator, Inc. (Midwest ISO) amended its March 1, 2005 filing in Docket No. ER05–662–000 to provide an exhibit. Midwest ISO requests an effective date of February 23, 2005. Midwest ISO states that a copy of this filing was served on all parties on the service list maintained by the Secretary in this proceeding. Comment Date: 5 p.m. eastern time on May 16, 2005. [Docket Nos. ER03–1102–008 and EL05–14– 001] 8. ATPower & Energy, LLC [Docket No. EC05–75–000] Take notice that on April 25, 2005, the California lndependent System Operator Corporation (CAISO) submitted a filing in compliance with the Commission order issued March 24, 2005 in Docket No. ER03–1102–003, et al., 110 FERC ¶ 61,333. The CAISO states that this filing has been served upon all parties on the official service lists for the captioned dockets. In addition, the CAISO has posted this filing on the CAISO Home Page. Comment Date: 5 p.m. eastern time on May 16, 2005. [Docket No. ER05–859–000] 5. Devon Power LLC; Middletown Power LLC; and Montville Power [Docket No. ER05–862–000] [Docket No. EC05–75–000, et al.] Granite Ridge Energy, LLC, et al.; Electric Rate and Corporate Filings May 2, 2005. The following filings have been made with the Commission. The filings are listed in ascending order within each docket classification. Take notice that on April 27, 2005, Granite Ridge Energy, LLC (Granite Ridge), JPMorgan Chase Bank, N.A. (JPMCB), Merrill Lynch Credit Products, LLC (MLCP), and SPO Partners II, L.P. (SPO) filed an application pursuant to section 203 of the Federal Power Act, requesting the Commission to authorize the indirect disposition of jurisdictional facilities that may result from the transfer of indirect equity interests in Granite Ridge to and from JPMCB, MLCP, SPO and Castlerigg Partners, L.P. Comment Date: May 18, 2005. 2. Brooklyn Navy Yard Cogeneration Partners, L.P.; BMC Acquisition LLC: B– 41 Acquisition LLC; YC Acquisition LLC; and York Research Corporation [Docket No. EC05–76–000] Take notice that on April 28, 2005, BMC Acquisition LLC; B–41 Acquisition LLC; YC Acquisition LLC (collectively, Buyers); Brooklyn Navy Yard Cogeneration Partners, L.P. (BNYCP); and York Research Corporation (collectively, with Buyers and BNYCP, Applicants), tendered for filing with the Federal Energy Regulatory Commission, pursuant to section 203 of the Federal Power Act and Part 33 of the Commission’s regulations, an application for authorization that would allow the Buyers to acquire and exercise an option to purchase upstream ownership interests in BNYCP. Pursuant to 18 CFR 33.9 (2004), the Applicants seek privileged treatment for Exhibits C–2 and C–4 to the application. Comment Date: 5 p.m. eastern time on May 18, 2005. 3. Wisconsin Electric Power Company [Docket No. ER98–855–006] Take notice that on April 25, 2005, Wisconsin Electric Power Company (Wisconsin Electric) submitted a compliance filing pursuant to the VerDate jul<14>2003 16:17 May 09, 2005 Jkt 205001 [Docket No. ER04–23–013] Take notice that on April 20, 2005, Devon Power LLC, Middletown Power LLC and Montville Power, (collectively NRG) tendered an errata to their filing submitted March 1, 2005, in Docket No. ER04–23–010. Comment Date: 5 p.m. eastern time on May 11, 2005. 6. Dartmouth PPA Holdings LLC and Dartmouth Power Associates Limited Partnership Take notice that on April 25, 2005, ATPower & Energy, LLC (ATPower & Energy) petitioned the Commission for acceptance of ATPower & Energy Rate Schedule FERC No. 1; the granting of certain blanket approvals, including the authority to sell electricity at marketbased rates; and the waiver of certain Commission regulations. Comment Date: 5 p.m. eastern time on May 16, 2005. 9. Midwest Independent Transmission System Operator, Inc. Take notice that on April 25, 2005, the Midwest Independent Transmission System Operator, Inc. (Midwest ISO) submitted a Letter Agreement among PSEG Lawrenceburg Energy Company LLC, Cinergy Services, Inc., as agent for The Cincinnati Gas & Electric Company and the Midwest ISO. Midwest ISO states that a copy of this filing was served on PSEG Lawrenceburg Energy Company LLC and Cinergy Services, Inc. Comment Date: 5 p.m. eastern time on May 16, 2005. [Docket Nos. ER05–598–001 and ER05–599– 001] 10. Wisconsin Electric Power Company Take notice that on April 25, 2005, Dartmouth PPA Holdings, LLC, and Dartmouth Power Associates Limited Partnership submitted a compliance filing pursuant to the Commission’s order issued April 14, 2005 in Docket Nos. ER05–598–000 and ER05–599–000, 111 FERC ¶ 61, 039, to incorporate the change of status reporting requirements adopted by the Commission in Order 652, Reporting Requirements for Changes in Status for Public Utilities with Market-Based Rate Authority, 110 FERC ¶ 61,097. Comment Date: 5 p.m. eastern time on May 16, 2005. Take notice that on April 25, 2005, Wisconsin Electric Power Company (Wisconsin Electric) submitted revisions to its Market Based Power Sales and Resale Transmission Tariff, FERC Electric Tariff, Original Volume No. 8. Wisconsin Electric states that the proposed amendments are minor revisions to correct dates and typographical errors on two tariff sheets. Wisconsin Electric states that copies of this filing were served on all parties listed In Attachment C to the filing. Comment Date: 5 p.m. eastern time on May 16, 2005. PO 00000 Frm 00073 Fmt 4703 Sfmt 4703 [Docket No. ER05–863–000] E:\FR\FM\10MYN1.SGM 10MYN1 Federal Register / Vol. 70, No. 89 / Tuesday, May 10, 2005 / Notices 11. Sheboygan Power, LLC DEPARTMENT OF ENERGY [Docket No. ER05–869–000] Federal Energy Regulatory Commission Take notice that on April 22, 2005, Alliant Energy Corporate Services, Inc., on behalf of Sheboygan Power, LLC (SPLLC), submitted for filing with the Commission SPLLC’s Rate Schedule No. 1 for Short-Term Sales of Test Power to permit SPLLC to sell wholesale test electric capacity and energy to Wisconsin Power and Light Company during the testing of SPLLC’s electric generating facility. Alliant requests an effective date of April 28, 2005. Comment Date: 5 p.m. eastern time on May 16, 2005. Standard Paragraph Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all parties to this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible online at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Linda Mitry, Deputy Secretary. [FR Doc. E5–2268 Filed 5–9–05; 8:45 am] [Docket No. ER95–1528–011, et al.] Wisconsin Public Service Corporation, et al.; Electric Rate and Corporate Filings April 29, 2005. The following filings have been made with the Commission. The filings are listed in ascending order within each docket classification. 1. Sheboygan Power, LLC and Wisconsin Power and Light Company [Docket No. EC05–73–000] Take notice that on April 26, 2005, Alliant Energy Corporate Services, Inc., (AECS) on behalf of Sheboygan Power, LLC (SPLLC), and Wisconsin Power and Light Company (WPL), (collectively, Applicants) filed an application requesting the Commission to authorize SPLLC’s transfer of control over limited FERC-jurisdictional generator interconnection facilities to WPL (the transfer). AECS states that the transfer will arise in the context of SPLLC’s development and lease to WPL of a new, approximately 300 MW generating facility in Wisconsin pursuant to Wisconsin’s ‘‘Leased Generation Law’’, subject to state regulatory oversight and approval. Comment Date: 5 p.m. eastern time on May 17, 2005. 2. Oklahoma Municipal Power Authority v. American Electric Power Service Corp. [Docket No. EL05–38–002 Take notice that, on April 25, 2005, American Electric Power Service Corporation (AEP) submitted an unexecuted Network Integration Transmission Service Agreement with Oklahoma Municipal Power Authority pursuant to the Commission’s order issued March 4, 2005 in Oklahoma Municipal Power Authority v. American Electric Power Service Corp., 110 FERC ¶ 61,228 (2005). AEP states that copies of the filing were served on parties on the official service list in the above-captioned proceeding. Comment Date: 5 p.m. eastern time on May 16, 2005. BILLING CODE 6717–01–P VerDate jul<14>2003 16:17 May 09, 2005 Jkt 205001 PO 00000 Frm 00074 Fmt 4703 Sfmt 4703 24571 3. Wisconsin Public Service Corporation, WPS Power Development, Inc., and WPS Energy Services, Inc. (Docket Nos. ER95–1528–011 and ER96–1088–036); Combined Locks Energy Center, LLC (ER01–2659–005); WPS Empire State, Inc. (ER02–2199– 003); WPS Beaver Falls Generation, LLC (ER03–54–003); WPS Niagara Generation, LLC (ER03–55–003); WPS Syracuse Generation, LLC (ER03–56– 003); Mid-American Power, LLC (ER96– 1858–016); Quest Energy, LLC (ER03– 674–003); Sunbury Generation, LLC (ER99–3420–005) WPS Canada Generation, Inc. and WPS New England Generation, Inc. (ER99–1936–004); WPS Westwood Generation, LLC (ER01– 1114–004); Advantage Energy, Inc. (ER97–2758–011); and Upper Peninsula Power Company (ER05–89–00) Take notice that on April 25, 2005, WPS Resources Corporation (WPSR), on behalf of its subsidiaries listed in the caption above, tendered for filing tariff sheets (Tariff Sheets) in compliance with the Commission’s March 25, 2005 order in Wisconsin Public Service Corporation, et al., 110 FERC ¶ 61,353 (2005). WPSR states that a copy of the filing was served upon all parties to the Commission’s official service lists in the above-captioned dockets and the Public Service Commission of Wisconsin. Comment Date: 5 p.m. eastern time on May 16, 2005. 4. Northeast Utilities Service Company; Select Energy, Inc.; Select Energy New York, Inc; and Northeast Generation Company [ER99–4463–005, ER99–14–011, and ER02– 556–006] Take notice that on April 25, 2005, Northeast Utilities Service Company, on behalf of The Connecticut Light and Power Company, Western Massachusetts Electric Company, Holyoke Water Power Company, Holyoke Power and Electric Company, and Public Service of New Hampshire (the NU Operating Companies); Select Energy, Inc.; Select Energy New York, Inc.; and Northeast Generation Company jointly submitted a compliance filing pursuant to the Commission’s order issued March 24, 2005 in Docket No. ER96–496–010, et al., 110 FERC ¶ 61,237. Comment Date: 5 p.m. eastern time on May 13, 2005. 5. Direct Energy Services, LLC [Docket No. ER05–876–000] Take notice that on April 25, 2005, Direct Energy Services, LLC (Seller) petitioned the Commission for an order: E:\FR\FM\10MYN1.SGM 10MYN1

Agencies

[Federal Register Volume 70, Number 89 (Tuesday, May 10, 2005)]
[Notices]
[Pages 24570-24571]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-2268]



[[Page 24570]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EC05-75-000, et al.]


Granite Ridge Energy, LLC, et al.; Electric Rate and Corporate 
Filings

May 2, 2005.
    The following filings have been made with the Commission. The 
filings are listed in ascending order within each docket 
classification.

1. Granite Ridge Energy, LLC; JPMorgan Chase Bank, N.A.; Merrill Lynch 
Credit Products, LLC; and SPO Partners II, L.P.

[Docket No. EC05-75-000]

    Take notice that on April 27, 2005, Granite Ridge Energy, LLC 
(Granite Ridge), JPMorgan Chase Bank, N.A. (JPMCB), Merrill Lynch 
Credit Products, LLC (MLCP), and SPO Partners II, L.P. (SPO) filed an 
application pursuant to section 203 of the Federal Power Act, 
requesting the Commission to authorize the indirect disposition of 
jurisdictional facilities that may result from the transfer of indirect 
equity interests in Granite Ridge to and from JPMCB, MLCP, SPO and 
Castlerigg Partners, L.P.
    Comment Date: May 18, 2005.

2. Brooklyn Navy Yard Cogeneration Partners, L.P.; BMC Acquisition LLC: 
B-41 Acquisition LLC; YC Acquisition LLC; and York Research Corporation

[Docket No. EC05-76-000]

    Take notice that on April 28, 2005, BMC Acquisition LLC; B-41 
Acquisition LLC; YC Acquisition LLC (collectively, Buyers); Brooklyn 
Navy Yard Cogeneration Partners, L.P. (BNYCP); and York Research 
Corporation (collectively, with Buyers and BNYCP, Applicants), tendered 
for filing with the Federal Energy Regulatory Commission, pursuant to 
section 203 of the Federal Power Act and Part 33 of the Commission's 
regulations, an application for authorization that would allow the 
Buyers to acquire and exercise an option to purchase upstream ownership 
interests in BNYCP. Pursuant to 18 CFR 33.9 (2004), the Applicants seek 
privileged treatment for Exhibits C-2 and C-4 to the application.
    Comment Date: 5 p.m. eastern time on May 18, 2005.

3. Wisconsin Electric Power Company

[Docket No. ER98-855-006]

    Take notice that on April 25, 2005, Wisconsin Electric Power 
Company (Wisconsin Electric) submitted a compliance filing pursuant to 
the Commission's Order issued March 24, 2005, 110 FERC ] 61,340. 
Wisconsin Electric states that the proposed filing incorporates the 
change of status reporting requirements adopted by the Commission in 
Order 652, Reporting Requirements for Changes in Status for Public 
Utilities with Market-Based Rate Authority, 110 FERC ] 61,097.
    Wisconsin Electric states that copies of this filing were served on 
all parties to this proceeding.
    Comment Date: 5 p.m. eastern time on May 16, 2005.

4. California Independent System Operator Corporation

[Docket Nos. ER03-1102-008 and EL05-14-001]

    Take notice that on April 25, 2005, the California lndependent 
System Operator Corporation (CAISO) submitted a filing in compliance 
with the Commission order issued March 24, 2005 in Docket No. ER03-
1102-003, et al., 110 FERC ] 61,333.
    The CAISO states that this filing has been served upon all parties 
on the official service lists for the captioned dockets. In addition, 
the CAISO has posted this filing on the CAISO Home Page.
    Comment Date: 5 p.m. eastern time on May 16, 2005.

5. Devon Power LLC; Middletown Power LLC; and Montville Power

[Docket No. ER04-23-013]

    Take notice that on April 20, 2005, Devon Power LLC, Middletown 
Power LLC and Montville Power, (collectively NRG) tendered an errata to 
their filing submitted March 1, 2005, in Docket No. ER04-23-010.
    Comment Date: 5 p.m. eastern time on May 11, 2005.

6. Dartmouth PPA Holdings LLC and Dartmouth Power Associates Limited 
Partnership

[Docket Nos. ER05-598-001 and ER05-599-001]

    Take notice that on April 25, 2005, Dartmouth PPA Holdings, LLC, 
and Dartmouth Power Associates Limited Partnership submitted a 
compliance filing pursuant to the Commission's order issued April 14, 
2005 in Docket Nos. ER05-598-000 and ER05-599-000, 111 FERC ] 61, 039, 
to incorporate the change of status reporting requirements adopted by 
the Commission in Order 652, Reporting Requirements for Changes in 
Status for Public Utilities with Market-Based Rate Authority, 110 FERC 
] 61,097.
    Comment Date: 5 p.m. eastern time on May 16, 2005.

7. Midwest Independent Transmission System Operator, Inc.

[Docket No. ER05-662-001]

    Take notice that on April 25, 2005, the Midwest Independent 
Transmission System Operator, Inc. (Midwest ISO) amended its March 1, 
2005 filing in Docket No. ER05-662-000 to provide an exhibit. Midwest 
ISO requests an effective date of February 23, 2005.
    Midwest ISO states that a copy of this filing was served on all 
parties on the service list maintained by the Secretary in this 
proceeding.
    Comment Date: 5 p.m. eastern time on May 16, 2005.

8. ATPower & Energy, LLC

[Docket No. ER05-859-000]

    Take notice that on April 25, 2005, ATPower & Energy, LLC (ATPower 
& Energy) petitioned the Commission for acceptance of ATPower & Energy 
Rate Schedule FERC No. 1; the granting of certain blanket approvals, 
including the authority to sell electricity at market-based rates; and 
the waiver of certain Commission regulations.
    Comment Date: 5 p.m. eastern time on May 16, 2005.

9. Midwest Independent Transmission System Operator, Inc.

[Docket No. ER05-862-000]

    Take notice that on April 25, 2005, the Midwest Independent 
Transmission System Operator, Inc. (Midwest ISO) submitted a Letter 
Agreement among PSEG Lawrenceburg Energy Company LLC, Cinergy Services, 
Inc., as agent for The Cincinnati Gas & Electric Company and the 
Midwest ISO.
    Midwest ISO states that a copy of this filing was served on PSEG 
Lawrenceburg Energy Company LLC and Cinergy Services, Inc.
    Comment Date: 5 p.m. eastern time on May 16, 2005.

10. Wisconsin Electric Power Company

[Docket No. ER05-863-000]

    Take notice that on April 25, 2005, Wisconsin Electric Power 
Company (Wisconsin Electric) submitted revisions to its Market Based 
Power Sales and Resale Transmission Tariff, FERC Electric Tariff, 
Original Volume No. 8. Wisconsin Electric states that the proposed 
amendments are minor revisions to correct dates and typographical 
errors on two tariff sheets.
    Wisconsin Electric states that copies of this filing were served on 
all parties listed In Attachment C to the filing.
    Comment Date: 5 p.m. eastern time on May 16, 2005.

[[Page 24571]]

11. Sheboygan Power, LLC

[Docket No. ER05-869-000]

    Take notice that on April 22, 2005, Alliant Energy Corporate 
Services, Inc., on behalf of Sheboygan Power, LLC (SPLLC), submitted 
for filing with the Commission SPLLC's Rate Schedule No. 1 for Short-
Term Sales of Test Power to permit SPLLC to sell wholesale test 
electric capacity and energy to Wisconsin Power and Light Company 
during the testing of SPLLC's electric generating facility. Alliant 
requests an effective date of April 28, 2005.
    Comment Date: 5 p.m. eastern time on May 16, 2005.

Standard Paragraph

    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Applicant and all parties to this proceeding.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible online at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Linda Mitry,
Deputy Secretary.
[FR Doc. E5-2268 Filed 5-9-05; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.