Environmental Impact Statements and Regulations; Availability of EPA Comments, 24038 [05-9120]
Download as PDF
24038
Federal Register / Vol. 70, No. 87 / Friday, May 6, 2005 / Notices
Contact: Mike Hanneman 928–526–
0866
EIS No. 20050178, Final EIS, FHW, LA,
I–49 South Lafayette Regional Airport
to LA–88 Route US–90 Project,
Upgrading Existing US–90 from the
Lafayette Regional Airport to LA–88,
Funding, Iberia, Lafayette and St.
Martin Parishes, LA, Wait Period
Ends: 06/13/2005, Contact: William C.
Farr 225–757–7615
EIS No. 20050179, Draft Supplement
EIS, AFS, MT, Gallatin National
Forest, Updated Information, Main
Boulder Fuels Reduction Project,
Implementation, Gallatin National
Forest, Big Timber Ranger District, Big
Timber, Sweethgrass and Park
Counties, MT, Comment Period Ends:
06/20/2005, Contact: Barbara Ping
406–522–2558
EIS No. 20050180, Draft Supplement
EIS, AFS, ID, Mission Brush Project,
Additional Information, Proposes
Vegetation, Wildlife Habitat,
Recreation and Aquatic Improvement
Treatments, Idaho Panhandle
National Forests, Bonners Ferry
Ranger District, Bounty County, ID,
Comment Period Ends: 06/20/2005,
Contact: Doug Nisherk 208–267–5561
EIS No. 20050181, Draft EIS, FHW, MO,
MO–34 Corridor Improvements, from
intersection of U.S. Routes 60/21 in
Carter County to the intersection of
Routes 34/72 in Cape Girardeau
County, Funding, U.S. Army COE
Section 404 Permit, Carter, Bollinger,
Reynolds, Wayne, and Cape Girardeau
Counties, MO, Comment Period Ends:
06/24/2005, Contact: Peggy Casey
573–636–7104
EIS No. 20050182, Draft EIS, FRC, CO,
Piceance Basin Expansion Project,
Construction and Operation of a New
Interstate Natural Gas Pipeline
System, Wamsutter Compressor
Station to Interconnections
Greasewood Compressor Station, Rio
Blanco County CO and Sweetwater
County, WY, Comment Period Ends:
06/20/2005, Contact: Joyce Turner
202–502–8008
EIS No. 20050183, Final EIS, NOA, HI,
Seabird Interaction Mitigation
Methods, To Reduce Interaction with
Seabird in Hawaii-Based Longline
Fishery and Pelagic Squid Fishery
Management, to Establish an Effective
Management Framework for Pelagic
Squid Fisheries, Fishery Management
Plan, Pelagic Fisheries of the Western
Pacific Region, Exclusive Economic
Zone of the U.S. and High Sea, HI,
Wait Period Ends: 06/06/2005,
Contact: Alvin Katekaru 808–973–
2937
EIS No. 20050184, Final EIS, NOA, AK,
Essential Fish Habitat Identification
VerDate jul<14>2003
18:03 May 05, 2005
Jkt 205001
and Conservation, Implementation,
North Pacific Fishery Management
Council, Magnuson-Stevens Fishery
Conservation and Management Act,
AK, Wait Period Ends: 06/06/2005,
Contact: James W. Balsiger 907586–
7636
Amended Notices
EIS No. 20050174, DRAFT EIS, FHW,
CO, I–25 Valley Highway Project,
Transportation Improvement from
Logan to U.S. 6, Denver County, CO,
Comment Period Ends: June 14, 2005,
Contact: Chris Horn (720) 963–3017.
Revision of Federal Register Notice
Published on 4/29/2005: Correction to
the County from Douglas to Denver.
Dated: May 3, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 05–9119 Filed 5–5–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6663–2]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act, as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7167.
An explanation of the ratings assigned
to draft environmental impact
statements (EISs) was published in
Federal Register dated April 1, 2005 (70
FR 16815).
Draft EISs
EIS No. 20050075, ERP No. D–FRC–
C03015–00, Crown Landing Liquefied
Natural Gas Terminal, Construct and
Operate in Gloucester County, NJ and
New Castle County, DE; and Logan
Lateral Project, Construct and Operate
a New Natural Gas Pipeline and
Ancillary Facilities in Gloucester
County, NJ and Delaware, PA
Summary: EPA expressed concerns
that the Draft EIS did not include
detailed mitigation plans, a discussion
of Clean Air Act general conformity
requirements, and did not thoroughly
analyze the cumulative effects on
navigation and the environment. Rating
EC2.
EIS No. 20050093, ERP No. D–NOA–
K39091–CA, Monterey Accelerated
PO 00000
Frm 00078
Fmt 4703
Sfmt 4703
Research Systems (MARS) Cabled
Observatory, Proposes to Install and
Operate an Advanced Undersea
Cabled Observatory, Monterey Bay,
Pacific Ocean Offshore of Moss
Landing, Monterey County, CA
Summary: EPA had no objections to
the project as proposed. Rating LO.
Final EISs
EIS No. 20050123, ERP No. FB–NOA–
E91007–00, South Atlantic Shrimp
Fishery Management Plan,
Amendment 6, Propose to Amend the
Bycatch Reduction Device (BRD)
Testing Protocol System, South
Atlantic Region
Summary: EPA had no objection to
the project as proposed.
EIS No. 20050115, ERP No. FS–NRC–
E06023–AL, Generic EIS—License
Renewal of Nuclear Plants, Joseph M.
Farley Nuclear Plants, Units 1 and 2,
Supplemental 18 to NUREG–1437
(TAC NOS. MC0768 and MC0769;
Houston County, AL
Summary: EPA continues to have
environmental concerns about the
availability of long-term offsite storage
of radioactive waste, and future surface
water withdrawals for plant operations
which could be affected by State
agreements. Radiological monitoring of
all plant effluents, and appropriate
storage of radioactive waste will be
necessary during the license renewal
period.
Dated: May 2, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 05–9120 Filed 5–5–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[OPPT–2005–0029; FRL–7714–2]
Strategic Approach to International
Chemicals Management (SAICM),
Meeting of Western Europe and Other
Governments (WEOG); Notice of
Public Meeting
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: This notice is to announce
that EPA and the State Department will
be hosting stakeholder meetings to
inform U.S. Government viewpoints for
an upcoming Western Europe and Other
Governments (WEOG) meeting on the
Strategic Approach to International
Chemicals Management (SAICM) and a
number of inter-sessional working
E:\FR\FM\06MYN1.SGM
06MYN1
Agencies
[Federal Register Volume 70, Number 87 (Friday, May 6, 2005)]
[Notices]
[Page 24038]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-9120]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6663-2]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
Section 102(2)(c) of the National Environmental Policy Act, as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7167.
An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in Federal Register dated April
1, 2005 (70 FR 16815).
Draft EISs
EIS No. 20050075, ERP No. D-FRC-C03015-00, Crown Landing Liquefied
Natural Gas Terminal, Construct and Operate in Gloucester County, NJ
and New Castle County, DE; and Logan Lateral Project, Construct and
Operate a New Natural Gas Pipeline and Ancillary Facilities in
Gloucester County, NJ and Delaware, PA
Summary: EPA expressed concerns that the Draft EIS did not include
detailed mitigation plans, a discussion of Clean Air Act general
conformity requirements, and did not thoroughly analyze the cumulative
effects on navigation and the environment. Rating EC2.
EIS No. 20050093, ERP No. D-NOA-K39091-CA, Monterey Accelerated
Research Systems (MARS) Cabled Observatory, Proposes to Install and
Operate an Advanced Undersea Cabled Observatory, Monterey Bay, Pacific
Ocean Offshore of Moss Landing, Monterey County, CA
Summary: EPA had no objections to the project as proposed. Rating
LO.
Final EISs
EIS No. 20050123, ERP No. FB-NOA-E91007-00, South Atlantic Shrimp
Fishery Management Plan, Amendment 6, Propose to Amend the Bycatch
Reduction Device (BRD) Testing Protocol System, South Atlantic Region
Summary: EPA had no objection to the project as proposed.
EIS No. 20050115, ERP No. FS-NRC-E06023-AL, Generic EIS--License
Renewal of Nuclear Plants, Joseph M. Farley Nuclear Plants, Units 1 and
2, Supplemental 18 to NUREG-1437 (TAC NOS. MC0768 and MC0769; Houston
County, AL
Summary: EPA continues to have environmental concerns about the
availability of long-term offsite storage of radioactive waste, and
future surface water withdrawals for plant operations which could be
affected by State agreements. Radiological monitoring of all plant
effluents, and appropriate storage of radioactive waste will be
necessary during the license renewal period.
Dated: May 2, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 05-9120 Filed 5-5-05; 8:45 am]