Garden Banks Gas Pipeline, LLC; Notice of Proposed Changes in FERC, Gas Tariff, 23147 [E5-2157]
Download as PDF
Federal Register / Vol. 70, No. 85 / Wednesday, May 4, 2005 / Notices
agreement in compliance with the
Commission’s recent order in this
proceeding.
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed in
accordance with the provisions of
Section 154.210 of the Commission’s
regulations (18 CFR 154.210). Anyone
filing a protest must serve a copy of that
document on all the parties to the
proceeding.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–2155 Filed 5–3–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP05–279–000]
Garden Banks Gas Pipeline, LLC;
Notice of Proposed Changes in FERC,
Gas Tariff
April 27, 2005.
Take notice that on April 22, 2005,
Garden Banks Gas Pipeline, LLC (GBGP)
tendered for filing as part of its FERC
Gas Tariff, Original Volume No. 1, the
following tariff sheets to become
effective May 22, 2005:
Third Revised Sheet No. 0
Fourth Revised Sheet No. 14
Fourth Revised Sheet No. 24
VerDate jul<14>2003
21:08 May 03, 2005
Jkt 205001
Third Revised Sheet No. 33
Seventh Revised Sheet No. 59
Fourth Revised Sheet No. 86
Third Revised Sheet No. 216
Third Revised Sheet No. 227
Third Revised Sheet No. 238
Third Revised Sheet No. 278
Third Revised Sheet No. 288
Third Revised Sheet No. 295
Third Revised Sheet No. 297
Fourth Revised Sheet No. 302
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–2157 Filed 5–3–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
GBGP states that the above-referenced
tariff sheets are being filed in
accordance with section 154.204 of the
Commission’s regulations in order to
make minor conforming changes to its
Tariff to reflect revisions to its contact
information, including address,
telephone, and facsimile numbers.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov or call
PO 00000
Frm 00060
Fmt 4703
Sfmt 4703
23147
Federal Energy Regulatory
Commission
[Docket No. RP05–278–000]
Guardian Pipeline, L.L.C.; Notice of
Proposed Changes in FERC Gas Tariff
April 27, 2005.
Take notice that on April 22, 2005,
Guardian Pipeline, L.L.C. (Guardian)
tendered for filing to become part of
Guardian’s FERC Gas Tariff, Original
Volume No. 1, the following tariff sheets
to become effective June 1, 2005:
Fourth Revised Sheet No. 0 (Title Page)
Sixth Revised Sheet No. 6
Second Revised Sheet No. 80
First Revised Sheet No. 81
Second Revised Sheet No. 82
First Revised Sheet No. 83
Fourth Revised Sheet No. 105
Second Revised Sheet No. 150
Second Revised Sheet No. 153
First Revised Sheet No. 370
Second Revised Sheet No. 371
First Revised Sheet No. 375
Original Sheet No. 376
Sheet Nos. 377–379
Third Revised Sheet No. 380
Third Revised Sheet No. 393
First Revised Sheet No. 394
First Revised Sheet No. 395
Second Revised Sheet No. 396
Guardian states that it is filing revised
tariff sheets for the purpose of: (1)
Revising Rate Schedule PAL and its
associated form of service agreement, (2)
relocating the scheduling priority of
PAL service from the General Terms and
Conditions to Rate Schedule PAL; and
(3) making minor housekeeping
changes.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
E:\FR\FM\04MYN1.SGM
04MYN1
Agencies
[Federal Register Volume 70, Number 85 (Wednesday, May 4, 2005)]
[Notices]
[Page 23147]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-2157]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP05-279-000]
Garden Banks Gas Pipeline, LLC; Notice of Proposed Changes in
FERC, Gas Tariff
April 27, 2005.
Take notice that on April 22, 2005, Garden Banks Gas Pipeline, LLC
(GBGP) tendered for filing as part of its FERC Gas Tariff, Original
Volume No. 1, the following tariff sheets to become effective May 22,
2005:
Third Revised Sheet No. 0
Fourth Revised Sheet No. 14
Fourth Revised Sheet No. 24
Third Revised Sheet No. 33
Seventh Revised Sheet No. 59
Fourth Revised Sheet No. 86
Third Revised Sheet No. 216
Third Revised Sheet No. 227
Third Revised Sheet No. 238
Third Revised Sheet No. 278
Third Revised Sheet No. 288
Third Revised Sheet No. 295
Third Revised Sheet No. 297
Fourth Revised Sheet No. 302
GBGP states that the above-referenced tariff sheets are being filed
in accordance with section 154.204 of the Commission's regulations in
order to make minor conforming changes to its Tariff to reflect
revisions to its contact information, including address, telephone, and
facsimile numbers.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed in accordance with the provisions of
section 154.210 of the Commission's regulations (18 CFR 154.210).
Anyone filing an intervention or protest must serve a copy of that
document on the Applicant. Anyone filing an intervention or protest on
or before the intervention or protest date need not serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov or call (866) 208-3676 (toll free). For TTY,
call (202) 502-8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-2157 Filed 5-3-05; 8:45 am]
BILLING CODE 6717-01-P