Pinnacle West Capital Corporation, et al.; Electric Rate and Corporate Filings, 22655-22657 [E5-2076]
Download as PDF
Federal Register / Vol. 70, No. 83 / Monday, May 2, 2005 / Notices
copying at the Department of Energy’s
Freedom of Information Public Reading
Room, 1E–190, Forrestal Building, 1000
Independence Avenue, SW.,
Washington, DC 20585 between 9 a.m.
and 4 p.m., Monday–Friday, except
Federal holidays. Minutes will also be
available at the Department of Energy’s
Environmental Information Center and
Reading Room at 115 Memorial Drive,
Barkley Centre, Paducah, Kentucky
between 8 a.m. and 5 p.m., on Monday
thru Friday by writing to David Dollins,
Department of Energy, Paducah Site
Office, Post Office Box 1410, MS–103,
Paducah, Kentucky 42001 or by calling
him at (270) 441–6819.
Issued at Washington, DC, on April 27,
2005.
Rachel M. Samuel,
Deputy Advisory Committee Management
Officer.
[FR Doc. 05–8679 Filed 4–29–05; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER00–2268–012, et al.]
Pinnacle West Capital Corporation, et
al.; Electric Rate and Corporate Filings
April 25, 2005.
The following filings have been made
with the Commission. The filings are
listed in ascending order within each
docket classification.
1. Pinnacle West Capital Corporation;
Arizona Public Service Company;
Pinnacle West Energy Corporation; APS
Energy Services Company, Inc.;
GenWest, LLC
[Docket Nos. ER00–2268–012, ER99–4124–
010, ER00–3312–011, ER99–4122–013,
ER03–352–003]
Take notice that on April 20, 2005,
Pinnacle West Capital Corporation,
Arizona Public Service Company,
Pinnacle West Energy Corporation and
APS Energy Services Company, Inc.
(collectively the Pinnacle West
Companies), and GenWest LLC filed a
notice of change in status and revised
tariff sheets pursuant to the
Commission’s Order No. 652 issued
February 10, 2005 in Docket No. RM04–
14–000, Reporting Requirement for
Changes in Status for Public Utilities
With Market-Based Rate Authority, 110
FERC ¶ 61,097 (2005).
Comment Date: 5 p.m. Eastern Time
on May 5, 2005.
VerDate jul<14>2003
19:05 Apr 29, 2005
Jkt 205001
2. Pinnacle West Capital Corporation;
Arizona Public Service Company;
Pinnacle West Energy Corporation; APS
Energy Services Company, Inc.;
Arizona Public Service Company, et al.
[Docket Nos. ER00–2268–013, EL05–10–000,
ER99–4124–011, EL05–11–000, ER00–3312–
012, EL05–12–000, ER99–4122–014, EL05–
13–000, EC05–20–000]
Take notice that on April 22, 2005,
Pinnacle West Capital Corporation,
Arizona Public Service Company,
Pinnacle West Energy Corporation, and
APS Energy Services Company, Inc.
filed a response to a deficiency letter
issued April 5, 2005 in the dockets
noted above.
Comment Date: 5 p.m. Eastern Time
on May 5, 2005.
3. Mirant Americas Energy Marketing,
LP; Mirant California, LLC; Mirant
Delta, LLC; Mirant Potrero, LLC; Mirant
New England, LLC; Mirant Canal, LLC;
Mirant Kendall, LLC; Mirant Bowline,
LLC; Mirant Lovett, LLC; Mirant NYGen, LLC; Mirant Chalk Point, LLC;
Mirant Mid-Atlantic, LLC; Mirant
Peaker, LLC; Mirant Potomac River,
LLC; Mirant Zeeland, LLC; West
Georgia Generating Company, LLC;
Mirant Sugar Creek, LLC; Shady Hills
Power Company, LLC; Wrightsville
Power Facility, LLC; Mirant Energy
Trading, LLC; Mirant Oregon, LLC;
Mirant Las Vegas, LLC
[Docket Nos. ER01–1265–005, ER01–1267–
006, ER01–1270–006, ER01–1278–006,
ER01–1274–006, ER01–1268–006, ER01–
1271–006, ER01–1266–005, ER01–1272–005,
ER01–1275–005, ER01–1269–005, ER01–
1273–005, ER01–1276–005, ER01–1277–005,
ER01–1263–005, ER02–1052–004, ER02–
900–004, ER02–537–005, ER02–1028–004,
ER02–1213–004, ER02–1331–006, ER03–
160–004]
Take notice that on April 19, 2005,
the above-referenced entities,
collectively the Mirant Entities,
tendered for filing a response to a
deficiency letter issued by Director,
Division of Tariffs and Market
Development—South concerning the
Mirant Entities updated market power
analysis submitted on November 9,
2004.
Comment Date: 5 p.m. Eastern Time
on May 10, 2005.
4. Powerex Corp.
[Docket No. ER01–48–004]
Take notice that on April 20, 2005,
Powerex Corp. (Powerex) submitted its
Notice of Change in Status with respect
to events that have taken place since the
Commission approved Powerex’s most
recent market power analysis. In
addition, Powerex states that it
submitted First Revised Sheet No. 5 and
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
22655
Original Sheet No. 6 to its Second
Revised Rate Schedule No. 1 to
incorporate the change in status
reporting requirements announced by
the Commission in Order No. 652,
Reporting Requirements for Changes in
Status for Public Utilities With MarketBased Rate Authority, Docket No.
RM04–14, issued February 10, 2005, 110
FERC ¶ 61,097 (2005).
Powerex states that copies of the filing
were served upon the official service list
compiled by the Secretary in this
proceeding.
Comment Date: 5 p.m. Eastern Time
on May 11, 2005.
5. GWF Energy LLC
[Docket No. ER01–2233–004]
Take notice that, on April 21, 2005,
GWF Energy LLC submitted revisions to
its market-based tariff in compliance
with the Commission’s order issued
March 25, 2005 in Docket Nos. ER01–
2233–002 and ER01–2233–003, GWF
Energy LLC, 110 FERC ¶ 61,352 to
incorporate the change in status
reporting requirement adopted by the
Commission in Order No. 652 issued
February 10, 2005 in Docket No. RM04–
14–000, Reporting Requirement for
Changes in Status for Public Utilities
With Market-Based Rate Authority, 70
FR 8253 (Feb. 18, 2005), FERC Stats. &
Regs., Regulations Preambles ¶ 31,175
(2005).
GWF Energy LLC states that copies of
the filing were served on parties on the
official service list in the abovecaptioned proceeding.
Comment Date: 5 p.m. Eastern Time
on May 12, 2005.
6. Oregon Electric Utility Company,
Portland General Electric Company,
Portland General Term Power
Procurement Company
[Docket Nos. ER04–1206–000, ER04–1206–
001, ER04–1206–002]
Take notice that on April 8, 2005,
Oregon Electric Utility Company,
Portland General Electric Company and
Portland General Term Power
Procurement Company filed a
withdrawal of the September 8, 2004,
September 29, 2004 and January 21,
2005 filings in the above-referenced
Docket Numbers.
Comment Date: 5 p.m. Eastern Time
on May 5, 2005.
E:\FR\FM\02MYN1.SGM
02MYN1
22656
Federal Register / Vol. 70, No. 83 / Monday, May 2, 2005 / Notices
7. Midwest Independent Transmission
System Operator, Inc.; Midwest
Independent Transmission System
Operator, Inc. and PJM
Interconnection, LLC, et al.; Midwest
Independent Transmission System
Operator, Inc. and PJM
Interconnection, LLC, et al.; Ameren
Services Company, et al.
[Docket Nos. ER05–6–018, EL04–135–020,
EL02–111–038, EL03–212–34]
Take notice that on April 20, 2005, as
amended on April 22, 2005, American
Electric Power Service Corporation (on
behalf of Appalachian Power Company,
Columbus Southern Power Company,
Indiana Michigan Power Company,
Kentucky Power Company, Kingsport
Power Company, Ohio Power Company
and Wheeling Power Company),
Commonwealth Edison Company and
Commonwealth Edison Company of
Indiana, Inc., Dayton Power and Light
Company and Duquesne Light Company
(collectively Companies) submitted for
filing revisions to reflect corrections to
errors in Attachments X and R of the
PJM Interconnection, L.L.C.’s open
access transmission tariff, effective
April 1, 2005. Companies state that this
filing is also being made on behalf of the
PJM and PJM West Transmission
Owners Agreement Administrative
Committees. The Companies request an
effective date of April 1, 2005.
The Companies state that a copy of
this filing has been served on the official
service lists in these proceedings.
Comment Date: 5 p.m. Eastern Time
on May 11, 2005.
8. Milford Power Company, LLC
[Docket No. ER05–163–003]
Take notice that, on April 21, 2005,
Milford Power Company, LLC (Milford)
submitted a compliance filing pursuant
to the Commission’s order issued March
22, 2005, in Docket No. ER05–163–000,
Milford Power Company, LLC, 110 FERC
¶ 61,299.
Milford states that copies of the filing
were served on parties on the official
service list in the above-captioned
proceeding.
Comment Date: 5 p.m. Eastern Time
on May 12, 2005.
9. Sempra Generation
[Docket No. ER05–440–002]
Take notice that on April 20, 2005,
Sempra Generation (formerly, Sempra
Energy Resources) submitted revised
tariff sheets in compliance with the
Commission’s March 25, 2005 order,
110 FERC ¶ 61,344, to incorporate the
language required by Order No. 652
pertaining to notices of changes in
status.
VerDate jul<14>2003
19:05 Apr 29, 2005
Jkt 205001
Comment Date: 5 p.m. Eastern Time
on May 11, 2005.
Take notice that on April 21, 2005,
Mendota Hills LLC submitted a refund
report in compliance with the order
issued by the Commission on March 3,
2005 in Docket No. ER05–463–000.
Mendota Hills LLC states that copies
of the filing were served on parties on
the official service list in this
proceeding.
Comment Date: 5 p.m. Eastern Time
on May 12, 2005.
submitted an amendment to its April 18,
2005 filing of two local service
agreements for local network service
with Bear Swamp Power Co., LLC (Bear
Swamp Power), under ISO New England
Inc.’s Transmission, Markets and
Services Tariff (ISO New England Inc.,
FERC Electric Tariff No. 3).
NEP states that a copy of this filing
has been served upon Bear Swamp
Power, ISO New England Inc., and
regulators in the Commonwealth of
Massachusetts.
Comment Date: 5 p.m. Eastern Time
on May 11, 2005.
11. Midwest Independent Transmission
System Operator, Inc.
[Docket No. ER05–844–000]
10. Mendota Hills LLC
[Docket No. ER05–463–001]
[Docket No. ER05–636–001]
15. Pacific Gas and Electric Company
12. NorthWestern Energy
Take notice that on April 20, 2005,
Pacific Gas and Electric Company
(PG&E) submitted a filing revising its
transmission owner tariff to recover
costs associated with the California
Independent System Operator
Corporation’s CAISO’s self-supply of
station power initiative.
PG&E states that copies of this filing
have been served upon the CAISO and
the California Public Utilities
Commission.
Comment Date: 5 p.m. Eastern Time
on May 11, 2005.
[Docket No. ER05–691–001]
16. North Jersey Energy Associates, L.P.
Take notice that on April 20, 2005,
the Midwest Independent Transmission
System Operator, Inc. (Midwest ISO)
amended its February 23, 2005 filing in
Docket No. ER05–636–000 to provide an
exhibit.
Midwest ISO states that a copy of this
filing was served on all parties on the
service list maintained by the Secretary
in this proceeding.
Comment Date: 5 p.m. Eastern Time
on May 11, 2005.
Take notice that on April 21, 2005,
NorthWestern Energy submitted a
revised cover letter to its March 10,
2005 filing to correct a typographical
error with regard to the proposed
effective date of an executed Generation
Interconnection Agreement between
NorthWestern Energy (Montana) and
Exergy Development Group, LLC. The
proposed effective date is April 10,
2005.
Comment Date: 5 p.m. Eastern Time
on May 9, 2005.
13. Yoakum Electric Generating
Cooperative, Inc.
[Docket No. ER05–739–001]
Take notice that on April 20, 2005
Yoakum Electric Generating
Cooperative, Inc., (Yoakum) submitted
for filing a corrected market-based rate
tariff to correct a pagination error in its
March 29, 2005 filing. Yoakum states
that the corrected market-based rate
tariff also incorporates the change in
status reporting requirements adopted
by the Commission in Order No. 652.
Comment Date: 5 p.m. Eastern Time
on May 11, 2005.
14. New England Power Company
[Docket No. ER05–835–001]
Take notice that on April 20, 2005,
New England Power Company (NEP)
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
[Docket No. ER05–845–000]
Take notice that on April 20, 2005,
North Jersey Energy Associates, L.P.
(NJEA) submitted its rate schedule and
supporting cost data for a proposed
reactive support and voltage control
from generation sources service for its
cogeneration facility located in
Sayreville, New Jersey. NJEA requests
an effective date of June 1, 2005.
Comment Date: 5 p.m. Eastern Time
on May 11, 2005.
17. MidAmerican Energy Company
[Docket No. ER05–846–000]
Take notice that on April 20, 2005,
MidAmerican Energy Company
(MidAmerican), submits for filing a
network integration transmission
service agreement and a network
operating agreement between
MidAmerican Energy Company and the
Eldridge Electric and Water Utilities
(Eldridge). MidAmerican requests an
effective date of May 1, 2005.
MidAmerican states that it has served
a copy of the filing on Eldridge, the
Iowa Utilities Board, the Illinois
Commerce Commission and the South
Dakota Public Utilities Commission.
Comment Date: 5 p.m. Eastern Time
on May 11, 2005.
E:\FR\FM\02MYN1.SGM
02MYN1
Federal Register / Vol. 70, No. 83 / Monday, May 2, 2005 / Notices
18. Central Vermont Public Service
Corporation, Green Mountain Power
Corporation
[Docket No. ER05–847–000]
Take notice that on April 20, 2005,
Central Vermont Public Service
Corporation (Central Vermont) and
Green Mountain Power Corporation
(Green Mountain) (collectively, the
Companies), jointly tendered for filing a
revised transmission service agreement
between Central Vermont and Green
Mountain to change references in the
formula rate to the local service
schedule of each Company in the ISO
New England, Inc. Transmission,
Markets and Service Tariff. The
Companies state that the transmission
service agreement has been designated
as Central Vermont’s First Revised Rate
Schedule No. 188 and Green Mountain’s
First Revised Rate Schedule 132. The
Companies request an effective date of
February 1, 2005.
The Companies state that copies of
the filing were served upon the Vermont
Public Service Board.
Comment Date: 5 p.m. Eastern Time
on May 11, 2005.
19. ISO New England Inc. and New
England Power Company
[Docket No. ER05–848–000]
Take notice that on April 21, 2005,
ISO New England Inc. (ISO–NE) and
New England Power Company (NEP)
(collectively, the Filing Parties),
submitted an executed service
agreement for a large generator
interconnection (Agreement) with
Ridgewood Power Management, LLC.
The Filing Parties state that the
Agreement has been designated as a
service agreement under ISO–NE’s Open
Access Transmission Tariff (Section II of
the ISO–NE Transmission, Markets and
Services Tariff, FERC Electric Tariff No.
3). The Filing Parties state that the
Agreement concerns the interconnection
of Ridgewood Rhode Island Generation,
Phase 2, a six (6) MW generating
facility.
ISO–NE states that paper copies of
said filing have been served on New
England Power Company and
Ridgewood Power Management, LLC
and have been sent to the New England
state governors and regulatory agencies,
and electronic copies were sent to the
ISO’s Governance Participants.
Comment Date: 5 p.m. Eastern Time
on May 12, 2005.
20. Delta Energy Center, LLC
[Docket No. ER05–854–000]
Take notice that on April 18, 2005,
Delta Energy Center, LLC (Delta)
submitted a revised rate schedule sheet
VerDate jul<14>2003
19:05 Apr 29, 2005
Jkt 205001
22657
to Delta Energy Center, LLC Rate
Schedule FERC No. 2 for the reliability
must-run service agreement between
Delta and the California Independent
System Operator Corporation to reflect
changes to certain generation ranges and
the addition of generation ranges related
to Ramp Rates. Delta requests an
effective date of May 1, 2005.
Delta states that copies of the filing
were served upon the official service list
for Docket No. ER03–510–000.
Comment Date: 5 p.m. Eastern Time
on May 9, 2005.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
21. Detroit Edison Company
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–2076 Filed 4–29–05; 8:45 am]
[Docket No. ES04–10–001]
Take notice that on April 22, 2005,
Detroit Edison Company (Detroit
Edison) filed an application pursuant to
section 204 of the Federal Power Act.
The application requests that the
Commission amend the authorization to
issue senior notes previously granted on
January 30, 2004, in Docket No. ES04–
10–000, to permit Detroit Edison to
issue new debt securities that have been
registered with the Securities and
Exchange Commission in exchange for
an equal principal amount of
outstanding debt securities previously
issued under the prior authorization.
Detroit Edison also requests a waiver
of the Commission’s competitive
bidding and negotiated placement
requirements at 18 CFR 34.2.
Comment Date: 5 p.m. Eastern Time
on May 6, 2005.
Standard Paragraph
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all parties to this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[RCRA–2005–0008, FRL–7906–2]
Agency Information Collection
Activities: Proposed Collection;
Comment Request; RCRA Hazardous
Waste Permit Application and
Modification, Part A, EPA ICR Number
0262.11, OMB Control Number 2050–
0034
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: In compliance with the
Paperwork Reduction Act (44 U.S.C.
3501 et seq.), this document announces
that EPA is planning to submit a
continuing Information Collection
Request (ICR) to the Office of
Management and Budget (OMB). This is
a request for an existing approved
collection. This ICR is scheduled to
expire on August 31, 2005. Before
submitting the ICR to OMB for review
and approval, EPA is soliciting
comments on specific aspects of the
proposed information collection as
described below.
DATES: Comments must be submitted on
or before July 1, 2005.
ADDRESSES: Submit your comments,
referencing docket ID number RCRA–
2005–0008, to EPA online using
EDOCKET (our preferred method), by
email to RCRA-docket@epa.gov, or by
mail to: EPA Docket Center,
Environmental Protection Agency,
RCRA Docket, mail code 5305T, 1200
Pennsylvania Ave., NW., Washington,
DC 20460.
FOR FURTHER INFORMATION CONTACT:
Jenny Stephenson, Office of Solid Waste
(5303W), Environmental Protection
Agency, 1200 Pennsylvania Ave., NW.,
E:\FR\FM\02MYN1.SGM
02MYN1
Agencies
[Federal Register Volume 70, Number 83 (Monday, May 2, 2005)]
[Notices]
[Pages 22655-22657]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-2076]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER00-2268-012, et al.]
Pinnacle West Capital Corporation, et al.; Electric Rate and
Corporate Filings
April 25, 2005.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. Pinnacle West Capital Corporation; Arizona Public Service Company;
Pinnacle West Energy Corporation; APS Energy Services Company, Inc.;
GenWest, LLC
[Docket Nos. ER00-2268-012, ER99-4124-010, ER00-3312-011, ER99-4122-
013, ER03-352-003]
Take notice that on April 20, 2005, Pinnacle West Capital
Corporation, Arizona Public Service Company, Pinnacle West Energy
Corporation and APS Energy Services Company, Inc. (collectively the
Pinnacle West Companies), and GenWest LLC filed a notice of change in
status and revised tariff sheets pursuant to the Commission's Order No.
652 issued February 10, 2005 in Docket No. RM04-14-000, Reporting
Requirement for Changes in Status for Public Utilities With Market-
Based Rate Authority, 110 FERC ] 61,097 (2005).
Comment Date: 5 p.m. Eastern Time on May 5, 2005.
2. Pinnacle West Capital Corporation; Arizona Public Service Company;
Pinnacle West Energy Corporation; APS Energy Services Company, Inc.;
Arizona Public Service Company, et al.
[Docket Nos. ER00-2268-013, EL05-10-000, ER99-4124-011, EL05-11-000,
ER00-3312-012, EL05-12-000, ER99-4122-014, EL05-13-000, EC05-20-000]
Take notice that on April 22, 2005, Pinnacle West Capital
Corporation, Arizona Public Service Company, Pinnacle West Energy
Corporation, and APS Energy Services Company, Inc. filed a response to
a deficiency letter issued April 5, 2005 in the dockets noted above.
Comment Date: 5 p.m. Eastern Time on May 5, 2005.
3. Mirant Americas Energy Marketing, LP; Mirant California, LLC; Mirant
Delta, LLC; Mirant Potrero, LLC; Mirant New England, LLC; Mirant Canal,
LLC; Mirant Kendall, LLC; Mirant Bowline, LLC; Mirant Lovett, LLC;
Mirant NY-Gen, LLC; Mirant Chalk Point, LLC; Mirant Mid-Atlantic, LLC;
Mirant Peaker, LLC; Mirant Potomac River, LLC; Mirant Zeeland, LLC;
West Georgia Generating Company, LLC; Mirant Sugar Creek, LLC; Shady
Hills Power Company, LLC; Wrightsville Power Facility, LLC; Mirant
Energy Trading, LLC; Mirant Oregon, LLC; Mirant Las Vegas, LLC
[Docket Nos. ER01-1265-005, ER01-1267-006, ER01-1270-006, ER01-1278-
006, ER01-1274-006, ER01-1268-006, ER01-1271-006, ER01-1266-005, ER01-
1272-005, ER01-1275-005, ER01-1269-005, ER01-1273-005, ER01-1276-005,
ER01-1277-005, ER01-1263-005, ER02-1052-004, ER02-900-004, ER02-537-
005, ER02-1028-004, ER02-1213-004, ER02-1331-006, ER03-160-004]
Take notice that on April 19, 2005, the above-referenced entities,
collectively the Mirant Entities, tendered for filing a response to a
deficiency letter issued by Director, Division of Tariffs and Market
Development--South concerning the Mirant Entities updated market power
analysis submitted on November 9, 2004.
Comment Date: 5 p.m. Eastern Time on May 10, 2005.
4. Powerex Corp.
[Docket No. ER01-48-004]
Take notice that on April 20, 2005, Powerex Corp. (Powerex)
submitted its Notice of Change in Status with respect to events that
have taken place since the Commission approved Powerex's most recent
market power analysis. In addition, Powerex states that it submitted
First Revised Sheet No. 5 and Original Sheet No. 6 to its Second
Revised Rate Schedule No. 1 to incorporate the change in status
reporting requirements announced by the Commission in Order No. 652,
Reporting Requirements for Changes in Status for Public Utilities With
Market-Based Rate Authority, Docket No. RM04-14, issued February 10,
2005, 110 FERC ] 61,097 (2005).
Powerex states that copies of the filing were served upon the
official service list compiled by the Secretary in this proceeding.
Comment Date: 5 p.m. Eastern Time on May 11, 2005.
5. GWF Energy LLC
[Docket No. ER01-2233-004]
Take notice that, on April 21, 2005, GWF Energy LLC submitted
revisions to its market-based tariff in compliance with the
Commission's order issued March 25, 2005 in Docket Nos. ER01-2233-002
and ER01-2233-003, GWF Energy LLC, 110 FERC ] 61,352 to incorporate the
change in status reporting requirement adopted by the Commission in
Order No. 652 issued February 10, 2005 in Docket No. RM04-14-000,
Reporting Requirement for Changes in Status for Public Utilities With
Market-Based Rate Authority, 70 FR 8253 (Feb. 18, 2005), FERC Stats. &
Regs., Regulations Preambles ] 31,175 (2005).
GWF Energy LLC states that copies of the filing were served on
parties on the official service list in the above-captioned proceeding.
Comment Date: 5 p.m. Eastern Time on May 12, 2005.
6. Oregon Electric Utility Company, Portland General Electric Company,
Portland General Term Power Procurement Company
[Docket Nos. ER04-1206-000, ER04-1206-001, ER04-1206-002]
Take notice that on April 8, 2005, Oregon Electric Utility Company,
Portland General Electric Company and Portland General Term Power
Procurement Company filed a withdrawal of the September 8, 2004,
September 29, 2004 and January 21, 2005 filings in the above-referenced
Docket Numbers.
Comment Date: 5 p.m. Eastern Time on May 5, 2005.
[[Page 22656]]
7. Midwest Independent Transmission System Operator, Inc.; Midwest
Independent Transmission System Operator, Inc. and PJM Interconnection,
LLC, et al.; Midwest Independent Transmission System Operator, Inc. and
PJM Interconnection, LLC, et al.; Ameren Services Company, et al.
[Docket Nos. ER05-6-018, EL04-135-020, EL02-111-038, EL03-212-34]
Take notice that on April 20, 2005, as amended on April 22, 2005,
American Electric Power Service Corporation (on behalf of Appalachian
Power Company, Columbus Southern Power Company, Indiana Michigan Power
Company, Kentucky Power Company, Kingsport Power Company, Ohio Power
Company and Wheeling Power Company), Commonwealth Edison Company and
Commonwealth Edison Company of Indiana, Inc., Dayton Power and Light
Company and Duquesne Light Company (collectively Companies) submitted
for filing revisions to reflect corrections to errors in Attachments X
and R of the PJM Interconnection, L.L.C.'s open access transmission
tariff, effective April 1, 2005. Companies state that this filing is
also being made on behalf of the PJM and PJM West Transmission Owners
Agreement Administrative Committees. The Companies request an effective
date of April 1, 2005.
The Companies state that a copy of this filing has been served on
the official service lists in these proceedings.
Comment Date: 5 p.m. Eastern Time on May 11, 2005.
8. Milford Power Company, LLC
[Docket No. ER05-163-003]
Take notice that, on April 21, 2005, Milford Power Company, LLC
(Milford) submitted a compliance filing pursuant to the Commission's
order issued March 22, 2005, in Docket No. ER05-163-000, Milford Power
Company, LLC, 110 FERC ] 61,299.
Milford states that copies of the filing were served on parties on
the official service list in the above-captioned proceeding.
Comment Date: 5 p.m. Eastern Time on May 12, 2005.
9. Sempra Generation
[Docket No. ER05-440-002]
Take notice that on April 20, 2005, Sempra Generation (formerly,
Sempra Energy Resources) submitted revised tariff sheets in compliance
with the Commission's March 25, 2005 order, 110 FERC ] 61,344, to
incorporate the language required by Order No. 652 pertaining to
notices of changes in status.
Comment Date: 5 p.m. Eastern Time on May 11, 2005.
10. Mendota Hills LLC
[Docket No. ER05-463-001]
Take notice that on April 21, 2005, Mendota Hills LLC submitted a
refund report in compliance with the order issued by the Commission on
March 3, 2005 in Docket No. ER05-463-000.
Mendota Hills LLC states that copies of the filing were served on
parties on the official service list in this proceeding.
Comment Date: 5 p.m. Eastern Time on May 12, 2005.
11. Midwest Independent Transmission System Operator, Inc.
[Docket No. ER05-636-001]
Take notice that on April 20, 2005, the Midwest Independent
Transmission System Operator, Inc. (Midwest ISO) amended its February
23, 2005 filing in Docket No. ER05-636-000 to provide an exhibit.
Midwest ISO states that a copy of this filing was served on all
parties on the service list maintained by the Secretary in this
proceeding.
Comment Date: 5 p.m. Eastern Time on May 11, 2005.
12. NorthWestern Energy
[Docket No. ER05-691-001]
Take notice that on April 21, 2005, NorthWestern Energy submitted a
revised cover letter to its March 10, 2005 filing to correct a
typographical error with regard to the proposed effective date of an
executed Generation Interconnection Agreement between NorthWestern
Energy (Montana) and Exergy Development Group, LLC. The proposed
effective date is April 10, 2005.
Comment Date: 5 p.m. Eastern Time on May 9, 2005.
13. Yoakum Electric Generating Cooperative, Inc.
[Docket No. ER05-739-001]
Take notice that on April 20, 2005 Yoakum Electric Generating
Cooperative, Inc., (Yoakum) submitted for filing a corrected market-
based rate tariff to correct a pagination error in its March 29, 2005
filing. Yoakum states that the corrected market-based rate tariff also
incorporates the change in status reporting requirements adopted by the
Commission in Order No. 652.
Comment Date: 5 p.m. Eastern Time on May 11, 2005.
14. New England Power Company
[Docket No. ER05-835-001]
Take notice that on April 20, 2005, New England Power Company (NEP)
submitted an amendment to its April 18, 2005 filing of two local
service agreements for local network service with Bear Swamp Power Co.,
LLC (Bear Swamp Power), under ISO New England Inc.'s Transmission,
Markets and Services Tariff (ISO New England Inc., FERC Electric Tariff
No. 3).
NEP states that a copy of this filing has been served upon Bear
Swamp Power, ISO New England Inc., and regulators in the Commonwealth
of Massachusetts.
Comment Date: 5 p.m. Eastern Time on May 11, 2005.
15. Pacific Gas and Electric Company
[Docket No. ER05-844-000]
Take notice that on April 20, 2005, Pacific Gas and Electric
Company (PG&E) submitted a filing revising its transmission owner
tariff to recover costs associated with the California Independent
System Operator Corporation's CAISO's self-supply of station power
initiative.
PG&E states that copies of this filing have been served upon the
CAISO and the California Public Utilities Commission.
Comment Date: 5 p.m. Eastern Time on May 11, 2005.
16. North Jersey Energy Associates, L.P.
[Docket No. ER05-845-000]
Take notice that on April 20, 2005, North Jersey Energy Associates,
L.P. (NJEA) submitted its rate schedule and supporting cost data for a
proposed reactive support and voltage control from generation sources
service for its cogeneration facility located in Sayreville, New
Jersey. NJEA requests an effective date of June 1, 2005.
Comment Date: 5 p.m. Eastern Time on May 11, 2005.
17. MidAmerican Energy Company
[Docket No. ER05-846-000]
Take notice that on April 20, 2005, MidAmerican Energy Company
(MidAmerican), submits for filing a network integration transmission
service agreement and a network operating agreement between MidAmerican
Energy Company and the Eldridge Electric and Water Utilities
(Eldridge). MidAmerican requests an effective date of May 1, 2005.
MidAmerican states that it has served a copy of the filing on
Eldridge, the Iowa Utilities Board, the Illinois Commerce Commission
and the South Dakota Public Utilities Commission.
Comment Date: 5 p.m. Eastern Time on May 11, 2005.
[[Page 22657]]
18. Central Vermont Public Service Corporation, Green Mountain Power
Corporation
[Docket No. ER05-847-000]
Take notice that on April 20, 2005, Central Vermont Public Service
Corporation (Central Vermont) and Green Mountain Power Corporation
(Green Mountain) (collectively, the Companies), jointly tendered for
filing a revised transmission service agreement between Central Vermont
and Green Mountain to change references in the formula rate to the
local service schedule of each Company in the ISO New England, Inc.
Transmission, Markets and Service Tariff. The Companies state that the
transmission service agreement has been designated as Central Vermont's
First Revised Rate Schedule No. 188 and Green Mountain's First Revised
Rate Schedule 132. The Companies request an effective date of February
1, 2005.
The Companies state that copies of the filing were served upon the
Vermont Public Service Board.
Comment Date: 5 p.m. Eastern Time on May 11, 2005.
19. ISO New England Inc. and New England Power Company
[Docket No. ER05-848-000]
Take notice that on April 21, 2005, ISO New England Inc. (ISO-NE)
and New England Power Company (NEP) (collectively, the Filing Parties),
submitted an executed service agreement for a large generator
interconnection (Agreement) with Ridgewood Power Management, LLC. The
Filing Parties state that the Agreement has been designated as a
service agreement under ISO-NE's Open Access Transmission Tariff
(Section II of the ISO-NE Transmission, Markets and Services Tariff,
FERC Electric Tariff No. 3). The Filing Parties state that the
Agreement concerns the interconnection of Ridgewood Rhode Island
Generation, Phase 2, a six (6) MW generating facility.
ISO-NE states that paper copies of said filing have been served on
New England Power Company and Ridgewood Power Management, LLC and have
been sent to the New England state governors and regulatory agencies,
and electronic copies were sent to the ISO's Governance Participants.
Comment Date: 5 p.m. Eastern Time on May 12, 2005.
20. Delta Energy Center, LLC
[Docket No. ER05-854-000]
Take notice that on April 18, 2005, Delta Energy Center, LLC
(Delta) submitted a revised rate schedule sheet to Delta Energy Center,
LLC Rate Schedule FERC No. 2 for the reliability must-run service
agreement between Delta and the California Independent System Operator
Corporation to reflect changes to certain generation ranges and the
addition of generation ranges related to Ramp Rates. Delta requests an
effective date of May 1, 2005.
Delta states that copies of the filing were served upon the
official service list for Docket No. ER03-510-000.
Comment Date: 5 p.m. Eastern Time on May 9, 2005.
21. Detroit Edison Company
[Docket No. ES04-10-001]
Take notice that on April 22, 2005, Detroit Edison Company (Detroit
Edison) filed an application pursuant to section 204 of the Federal
Power Act. The application requests that the Commission amend the
authorization to issue senior notes previously granted on January 30,
2004, in Docket No. ES04-10-000, to permit Detroit Edison to issue new
debt securities that have been registered with the Securities and
Exchange Commission in exchange for an equal principal amount of
outstanding debt securities previously issued under the prior
authorization.
Detroit Edison also requests a waiver of the Commission's
competitive bidding and negotiated placement requirements at 18 CFR
34.2.
Comment Date: 5 p.m. Eastern Time on May 6, 2005.
Standard Paragraph
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant and all parties to this proceeding.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-2076 Filed 4-29-05; 8:45 am]
BILLING CODE 6717-01-P