Environmental Impact Statements; Notice of Availability, 22308-22309 [05-8613]

Download as PDF 22308 Federal Register / Vol. 70, No. 82 / Friday, April 29, 2005 / Notices beneficial uses of dredged materials (i.e., wetlands restoration in Dorchester County, MD). EPA expressed environmental concerns over the remaining three alternatives (i.e., the proposed multiple new Confined Disposal Facilities in the Patapsco River, the Poplar Island Environmental Restoration Project expansion and the Large Island Restoration Middle Bay). EPA recommended that continued use of Open Water Placement in Virginia include the already designated NorfolkOcean Disposal Site given its available capacity. Rating EC1 EIS No. 20050053, ERP No. D–CGD– E03013–00, Compass Port and Deepwater Port License Application, To Construct a Liquefied Natural Gas (LNG) Receiving, Storage and Regasification Facility, Proposed Offshore Pipeline and Fabrication Site, NPDES Permit, U.S. Army COE Section 10 and 404 Permits, Mobile County, AL and San Patricio and Nueces County, TX. Summary: EPA expressed objections to the open loop re-gasification system due to immediate and cumulative adverse impacts to eastern Gulf waters and habitat. EPA requested additional information that is necessary for the federal Prevention of Significant Deterioration and National Pollutant Discharge Elimination System permits required for this Deep Water Port. Rating EC2.Final EISs EIS No. 20050071, ERP No. F–FHW– F40394–MI, I–94/Rehabilitation Project, Transportation Improvements to a 6.7 mile portion of I–94 from east I–96 west and to Conner Avenue on the east end, Funding and NPDES Permit, City of Detroit, Wayne County, MI. Summary: EPA has no objections to the preferred alternative. EIS No. 20050085, ERP No. F–FRC– K05060–CA, Stanislaus Rivers Projects, Relicensing of Hydroelectric Projects: Spring Gap-Stanislaus FERC No. 2130; Beardsley/Donnells FERC No. 2005; Tulloch FERC No. 2067; and Donnells-Curtis Transmission Line FERC No. 2118, Tuolumne and Calaveras Counties, CA. Summary: EPA has no objections to the project as proposed. In response to comments from EPA, FERC clarified and provided additional information on impacts to water and air quality, efforts to involve tribal governments, and evaluation of environmental justice issues. Dated: April 26, 2005. Ken Mittelholtz, Environmental Protection Specialist, Office of Federal Activities. [FR Doc. 05–8612 Filed 4–28–05; 8:45 am] BILLING CODE 6560–50–P Rating EO2 EIS No. 20050082, ERP No. D–FRC– J03001–CO, Entrega Pipeline Project, Construction and Operation New Interstate Natural Gas Pipeline System, Right-of-Way Grant Issue by BLM, Meeker Hub and Cheyenne Hub, Rio Blanco and Weld Counties, CO, and Sweetwater County, WY. Summary: EPA expressed concerns regarding the environmental impacts of additional natural gas development in the Piceance and Uinta basins to wildlife, water and air quality. EPA also recommended that other connected actions to the project and other projects that will be induced by the new pipeline be reviewed in the EIS. Rating EC2 EIS No. 20050091, ERP No. D–FRC– G03026–00, Golden Pass Liquefied Natural Gas (LNG) Import Terminal and Natural Gas Pipeline Facilities, Construction and Operation, Jefferson, Orange, Newton Counties, TX and Calcasieu Parish, LA. Summary: EPA expressed environmental concerns and requested VerDate jul<14>2003 additional information regarding alternatives, invasive species, air quality impacts and Clean Air Act conformity. 16:04 Apr 28, 2005 Jkt 205001 ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6662–8] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements filed April 18, 2005 through April 22, 2005 pursuant to 40 CFR 1506.9. EIS No. 20050165, Draft EIS, NPS, AK, Denali National Park and Preserve Revised Draft Backcountry Management Plan, General Management Plan Amendment, Implementation, AK, Comment Period Ends: June 30, 2005, Contact: Anne D. Castelina (202) 208–6381. EIS No. 20050166, Draft EIS, AFS, CA, Brown Project, Proposal to Improve Forest Health by Reducing Overcrowded Forest Stand PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 Conditions, Trinity River Management Unit, Shasta-Trinity National Forest, Weaverville Ranger District, Trinity County, CA, Comment Period Ends: June 13, 2005, Contact: J. Sharon Heywood (530) 226–2500. EIS No. 20050167, Final EIS, AFS, WV, Fernow Experimental Forest, To Continue Long-Term Research and Initiate New Research, Involving Removal of Trees, Prescribed Burning, Stem Injection of Selected of Trees, Control Invasive Plant Species, Northeastern Research Station, Parson, Tucker County, WV, Comment Period Ends: May 31, 2005, Contact: Mary Beth Adams (304) 478– 2000. EIS No. 20050168, Draft EIS, BLM, AK, East Alaska Draft Resource Management Plan (RMP), Provide a Single Comprehensive Land Use Plan, Glennallen Field Office District, AK, Comment Period Ends: July 28, 2005, Contact: Bruce Rogers (907) 822–3217. EIS No. 20050169, Final EIS, BLM, MT, Dillon Resource Management Plan, Provide Direction for Managing Public Lands within the Dillon Field Office, Implementation, Beaverhead and Madison Counties, MT, Wait Period Ends: May 31, 2005, Contact: Renee Johnson (406) 683–8016. EIS No. 20050170, Final EIS, DOE, CA, Site-wide Continued Operation of Lawrence Livermore National Laboratory (LLNL) and Stockpile Stewardship and Management, Implementation, Alameda and San Joaquin Counties, CA, Wait Period Ends: May 31, 2005, Contact: Tom Grim (925) 422–0704. EIS No. 20050171, Final EIS, AFS, NV, Jarbidge Canyon Project, Road Management Plan Implementation, Water Projects Construction along Charleston-Jarbidge Road and South Canyon Road Reconstruction, Humbolt-Toiyabe National Forest, Jarbidge Ranger District, Elko County, NV, Wait Period Ends: May 31, 2005, Contact: James Winfrey (775) 778– 6129. EIS No. 20050172, Final EIS, NRC, AR, Generic-License Renewal of Nuclear Plants, Arkansas Nuclear One, Unit 2 (Tac. Nos. MB 8405) Supplement 19 to NUREG–1437, Operating License Renewal, Pope County, AR, Wait Period Ends: May 31, 2005, Contact: Thomas Kenyon (301) 415–1120. EIS No. 20050173, Draft EIS, NRC, MS, Grand Gulf Early Site Permit, Construction and Operation, Issuance of an Early Site Permit (ESP), NUREG–1817, Claiborne County, MS, Comment Period Ends: July 14, 2005, E:\FR\FM\29APN1.SGM 29APN1 Federal Register / Vol. 70, No. 82 / Friday, April 29, 2005 / Notices Contact: James Wilson (301) 415– 1108. EIS No. 20050174, Draft EIS, FHW, CO, I–25 Valley Highway Project, Transportation Improvement from Logan to U.S. 6, Douglas County, CO, Comment Period Ends: June 14, 2005, Contact: Chris Horn (720) 963–3017. Amended Notices EIS No. 20050096, Draft EIS, NRC, IL, Early Site Permit (ESP) at the Exelon ESP Site, Application for ESP on One Additional Nuclear Unit, within the Clinton Power Station (CPS), NUREG– 1815, DeWitt County, IL, Comment Period Ends: May 25, 2005, Contact: Thomas Kenyon (301) 415–1120. Revision of FR Notice Published on 3/ 11/2005: CEQ Comment Period Ending on 4/25/2005 has been Extended to 5/25/2005. EIS No. 20050137, Draft EIS, AFS, VT, Green Mountain National Forest, Propose Revised Land and Resource Management Plan, Implementation Forest Plan Revision, Addison, Bennington, Rutland, Washington, Windham and Windsor Counties, VT, Comment Period Ends: July 5, 2005, Contact: Jay Strand (802) 767–4261. Revision of FR Notice Published on 4/ 01/05: CEQ Comment Period Ending 6/ 30/2005 has been Extended to 7/05/ 2005. Dated: April 26, 2005. Ken Mittelholtz, Environmental Protection Specialist, Office of Federal Activities. [FR Doc. 05–8613 Filed 4–28–05; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [OPPT–2005–0027; FRL–7713–5] Certain New Chemicals; Receipt and Status Information Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: SUMMARY: Section 5 of the Toxic Substances Control Act (TSCA) requires any person who intends to manufacture (defined by statute to include import) a new chemical (i.e., a chemical not on the TSCA Inventory) to notify EPA and comply with the statutory provisions pertaining to the manufacture of new chemicals. Under sections 5(d)(2) and 5(d)(3) of TSC, EPA is required to publish a notice of receipt of a premanufacture notice (PMN) or an application for a test marketing exemption (TME), and to publish VerDate jul<14>2003 16:04 Apr 28, 2005 Jkt 205001 periodic status reports on the chemicals under review and the receipt of notices of commencement to manufacture those chemicals. This status report, which covers the period from April 6, 2005 to April 13, 2005, consists of the PMNs pending or expired, and the notices of commencement to manufacture a new chemical that the Agency has received under TSCA section 5 during this time period. DATES: Comments identified by the docket identification (ID) number OPPT–2005–0027 and the specific PMN number or TME number, must be received on or before May 31, 2005. ADDRESSES: Comments may be submitted electronically, by mail, or through hand delivery/courier. Follow the detailed instructions as provided in Unit I. of the SUPPLEMENTARY INFORMATION. FOR FURTHER INFORMATION CONTACT: Colby Lintner, Regulatory Coordinator, Environmental Assistance Division, Office of Pollution Prevention and Toxics (7408M), Environmental Protection Agency, 1200 Pennsylvania Ave., NW., Washington, DC 20460– 0001; telephone number: (202) 554– 1404; e-mail address: TSCAHotline@epa.gov. SUPPLEMENTARY INFORMATION: I. General Information A. Does this Action Apply to Me? This action is directed to the public in general. As such, the Agency has not attempted to describe the specific entities that this action may apply to. Although others may be affected, this action applies directly to the submitter of the premanufacture notices addressed in the action. If you have any questions regarding the applicability of this action to a particular entity, consult the person listed under FOR FURTHER INFORMATION CONTACT. B. How Can I Get Copies of this Document and Other Related Information? 1. Docket. EPA has established an official public docket for this action under docket ID number OPPT–2005– 0027. The official public docket consists of the documents specifically referenced in this action, any public comments received, and other information related to this action. Although a part of the official docket, the public docket does not include Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. The official public docket is the collection of materials that is available for public viewing at the EPA Docket PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 22309 Center, Rm. B102-Reading Room, EPA West, 1301 Constitution Ave., NW., Washington, DC. The EPA Docket Center is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays. The EPA Docket Center Reading Room telephone number is (202) 566–1744 and the telephone number for the OPPT Docket, which is located in EPA Docket Center, is (202) 566–0280. 2. Electronic access. You may access this Federal Register document electronically through the EPA Internet under the ‘‘Federal Register’’ listings at https://www.epa.gov/fedrgstr/. An electronic version of the public docket is available through EPA’s electronic public docket and comment system, EPA Dockets. You may use EPA Dockets at https://www.epa.gov/edocket/ to submit or view public comments, access the index listing of the contents of the official public docket, and to access those documents in the public docket that are available electronically. Although not all docket materials may be available electronically, you may still access any of the publicly available docket materials through the docket facility identified in Unit I.B.1. Once in the system, select ‘‘search,’’ then key in the appropriate docket ID number. Certain types of information will not be placed in the EPA Dockets. Information claimed as CBI and other information whose disclosure is restricted by statute, which is not included in the official public docket, will not be available for public viewing in EPA’s electronic public docket. EPA’s policy is that copyrighted material will not be placed in EPA’s electronic public docket but will be available only in printed, paper form in the official public docket. To the extent feasible, publicly available docket materials will be made available in EPA’s electronic public docket. When a document is selected from the index list in EPA Dockets, the system will identify whether the document is available for viewing in EPA’s electronic public docket. Although not all docket materials may be available electronically, you may still access any of the publicly available docket materials through the docket facility identified in Unit I.B.1. EPA intends to work towards providing electronic access to all of the publicly available docket materials through EPA’s electronic public docket. For public commenters, it is important to note that EPA’s policy is that public comments, whether submitted electronically or in paper, will be made available for public viewing in EPA’s electronic public docket as EPA receives them and E:\FR\FM\29APN1.SGM 29APN1

Agencies

[Federal Register Volume 70, Number 82 (Friday, April 29, 2005)]
[Notices]
[Pages 22308-22309]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-8613]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6662-8]


Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements filed April 18, 2005 
through April 22, 2005 pursuant to 40 CFR 1506.9.

EIS No. 20050165, Draft EIS, NPS, AK, Denali National Park and Preserve 
Revised Draft Backcountry Management Plan, General Management Plan 
Amendment, Implementation, AK, Comment Period Ends: June 30, 2005, 
Contact: Anne D. Castelina (202) 208-6381.
EIS No. 20050166, Draft EIS, AFS, CA, Brown Project, Proposal to 
Improve Forest Health by Reducing Overcrowded Forest Stand Conditions, 
Trinity River Management Unit, Shasta-Trinity National Forest, 
Weaverville Ranger District, Trinity County, CA, Comment Period Ends: 
June 13, 2005, Contact: J. Sharon Heywood (530) 226-2500.
EIS No. 20050167, Final EIS, AFS, WV, Fernow Experimental Forest, To 
Continue Long-Term Research and Initiate New Research, Involving 
Removal of Trees, Prescribed Burning, Stem Injection of Selected of 
Trees, Control Invasive Plant Species, Northeastern Research Station, 
Parson, Tucker County, WV, Comment Period Ends: May 31, 2005, Contact: 
Mary Beth Adams (304) 478-2000.
EIS No. 20050168, Draft EIS, BLM, AK, East Alaska Draft Resource 
Management Plan (RMP), Provide a Single Comprehensive Land Use Plan, 
Glennallen Field Office District, AK, Comment Period Ends: July 28, 
2005, Contact: Bruce Rogers (907) 822-3217.
EIS No. 20050169, Final EIS, BLM, MT, Dillon Resource Management Plan, 
Provide Direction for Managing Public Lands within the Dillon Field 
Office, Implementation, Beaverhead and Madison Counties, MT, Wait 
Period Ends: May 31, 2005, Contact: Renee Johnson (406) 683-8016.
EIS No. 20050170, Final EIS, DOE, CA, Site-wide Continued Operation of 
Lawrence Livermore National Laboratory (LLNL) and Stockpile Stewardship 
and Management, Implementation, Alameda and San Joaquin Counties, CA, 
Wait Period Ends: May 31, 2005, Contact: Tom Grim (925) 422-0704.
EIS No. 20050171, Final EIS, AFS, NV, Jarbidge Canyon Project, Road 
Management Plan Implementation, Water Projects Construction along 
Charleston-Jarbidge Road and South Canyon Road Reconstruction, Humbolt-
Toiyabe National Forest, Jarbidge Ranger District, Elko County, NV, 
Wait Period Ends: May 31, 2005, Contact: James Winfrey (775) 778-6129.
EIS No. 20050172, Final EIS, NRC, AR, Generic-License Renewal of 
Nuclear Plants, Arkansas Nuclear One, Unit 2 (Tac. Nos. MB 8405) 
Supplement 19 to NUREG-1437, Operating License Renewal, Pope County, 
AR, Wait Period Ends: May 31, 2005, Contact: Thomas Kenyon (301) 415-
1120.
EIS No. 20050173, Draft EIS, NRC, MS, Grand Gulf Early Site Permit, 
Construction and Operation, Issuance of an Early Site Permit (ESP), 
NUREG-1817, Claiborne County, MS, Comment Period Ends: July 14, 2005,

[[Page 22309]]

Contact: James Wilson (301) 415-1108.
EIS No. 20050174, Draft EIS, FHW, CO, I-25 Valley Highway Project, 
Transportation Improvement from Logan to U.S. 6, Douglas County, CO, 
Comment Period Ends: June 14, 2005, Contact: Chris Horn (720) 963-3017.

Amended Notices

EIS No. 20050096, Draft EIS, NRC, IL, Early Site Permit (ESP) at the 
Exelon ESP Site, Application for ESP on One Additional Nuclear Unit, 
within the Clinton Power Station (CPS), NUREG-1815, DeWitt County, IL, 
Comment Period Ends: May 25, 2005, Contact: Thomas Kenyon (301) 415-
1120. Revision of FR Notice Published on 3/11/2005: CEQ Comment Period 
Ending on 4/25/2005 has been Extended to 5/25/2005.
EIS No. 20050137, Draft EIS, AFS, VT, Green Mountain National Forest, 
Propose Revised Land and Resource Management Plan, Implementation 
Forest Plan Revision, Addison, Bennington, Rutland, Washington, Windham 
and Windsor Counties, VT, Comment Period Ends: July 5, 2005, Contact: 
Jay Strand (802) 767-4261.

    Revision of FR Notice Published on 4/01/05: CEQ Comment Period 
Ending 6/30/2005 has been Extended to 7/05/2005.

    Dated: April 26, 2005.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. 05-8613 Filed 4-28-05; 8:45 am]