Transcontinental Gas Pipe Line Corporation; Notice of Proposed Changes In FERC Gas Tariff, 22017 [E5-2048]
Download as PDF
Federal Register / Vol. 70, No. 81 / Thursday, April 28, 2005 / Notices
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP05-276-000]
Magalie R. Salas,
Secretary.
[FR Doc. E5–2048 Filed 4–27–05; 8:45 am]
Transcontinental Gas Pipe Line
Corporation; Notice of Proposed
Changes In FERC Gas Tariff
BILLING CODE 6717–01–P
April 22, 2005.
Take notice that on April 20, 2005,
Transcontinental Gas Pipe Line
Corporation (Transco) tendered for
filing as part of its FERC Gas Tariff,
Third Revised Volume No. 1, Fourth
Revised Sheet No. 135F to be effective
March 31, 2005.
Transco states that the purpose of the
instant filing is to revise section 8.2 of
Rate Schedule WSS-Open Access by
deleting Public Service Electric & Gas
(PSE&G) from the list of buyers as a
result of a permanent release of WSSOA service effective March 31, 2005.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
VerDate jul<14>2003
16:00 Apr 27, 2005
Jkt 205001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL05–87–000]
Tucson Electric Power Company;
Notice of Institution of Proceeding and
Refund Effective Date
April 19, 2005.
On April 14, 2005, the Commission
issued an order initiating a proceeding
in Docket No. EL05–87–000 under
section 206 of the Federal Power Act
concerning the justness and
reasonableness of Tucson Electric Power
Company’s market-based rates in the
Tucson control area. Tucson Electric
Power Company 111 FERC ¶61,037
(2005).
The refund effective date in Docket
No. EL05–87–000, established pursuant
to section 206 of the Federal Power Act,
will be 60 days following publication of
this notice in the Federal Register.
Magalie R. Salas,
Secretary.
[FR Doc. E5–2032 Filed 4–27–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
22017
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
[Docket No. RP05–275–000]
Magalie R. Salas,
Secretary.
[FR Doc. E5–2018 Filed 4–27–05; 8:45 am]
Williston Basin Interstate Pipeline
Company; Notice of Tariff Filing
BILLING CODE 6717–01–P
April 21, 2005.
DEPARTMENT OF ENERGY
Take notice that on April 15, 2005,
Williston Basin Interstate Pipeline
Company (Williston Basin) tendered for
filing as part of its FERC Gas Tariff,
Second Revised Volume No. 1, Fifth
Revised Sheet No. 293, to become
effective May 15, 2005.
Williston Basin states that it is
proposing to revise its tariff language to
define the timeline governing situations
where no acceptable third party bids for
released capacity are received during
the right of first refusal process.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Docket No. RP05–273–000]
Williston Basin Interstate Pipeline
Company Notice of Proposed Changes
in FERC Gas Tariff
April 21, 2005.
Take notice that on April 15, 2005,
Williston Basin Interstate Pipeline
Company (Williston Basin) tendered for
filing as part of its FERC Gas Tariff,
Second Revised Volume No. 1, the
E:\FR\FM\28APN1.SGM
28APN1
Agencies
[Federal Register Volume 70, Number 81 (Thursday, April 28, 2005)]
[Notices]
[Page 22017]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-2048]
[[Page 22017]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP05-276-000]
Transcontinental Gas Pipe Line Corporation; Notice of Proposed
Changes In FERC Gas Tariff
April 22, 2005.
Take notice that on April 20, 2005, Transcontinental Gas Pipe Line
Corporation (Transco) tendered for filing as part of its FERC Gas
Tariff, Third Revised Volume No. 1, Fourth Revised Sheet No. 135F to be
effective March 31, 2005.
Transco states that the purpose of the instant filing is to revise
section 8.2 of Rate Schedule WSS-Open Access by deleting Public Service
Electric & Gas (PSE&G) from the list of buyers as a result of a
permanent release of WSS-OA service effective March 31, 2005.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed in accordance with the provisions of
Section 154.210 of the Commission's regulations (18 CFR 154.210).
Anyone filing an intervention or protest must serve a copy of that
document on the Applicant. Anyone filing an intervention or protest on
or before the intervention or protest date need not serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E5-2048 Filed 4-27-05; 8:45 am]
BILLING CODE 6717-01-P