Transcontinental Gas Pipe Line Corporation; Notice of Proposed Changes In FERC Gas Tariff, 22017 [E5-2048]

Download as PDF Federal Register / Vol. 70, No. 81 / Thursday, April 28, 2005 / Notices Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP05-276-000] Magalie R. Salas, Secretary. [FR Doc. E5–2048 Filed 4–27–05; 8:45 am] Transcontinental Gas Pipe Line Corporation; Notice of Proposed Changes In FERC Gas Tariff BILLING CODE 6717–01–P April 22, 2005. Take notice that on April 20, 2005, Transcontinental Gas Pipe Line Corporation (Transco) tendered for filing as part of its FERC Gas Tariff, Third Revised Volume No. 1, Fourth Revised Sheet No. 135F to be effective March 31, 2005. Transco states that the purpose of the instant filing is to revise section 8.2 of Rate Schedule WSS-Open Access by deleting Public Service Electric & Gas (PSE&G) from the list of buyers as a result of a permanent release of WSSOA service effective March 31, 2005. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC VerDate jul<14>2003 16:00 Apr 27, 2005 Jkt 205001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL05–87–000] Tucson Electric Power Company; Notice of Institution of Proceeding and Refund Effective Date April 19, 2005. On April 14, 2005, the Commission issued an order initiating a proceeding in Docket No. EL05–87–000 under section 206 of the Federal Power Act concerning the justness and reasonableness of Tucson Electric Power Company’s market-based rates in the Tucson control area. Tucson Electric Power Company 111 FERC ¶61,037 (2005). The refund effective date in Docket No. EL05–87–000, established pursuant to section 206 of the Federal Power Act, will be 60 days following publication of this notice in the Federal Register. Magalie R. Salas, Secretary. [FR Doc. E5–2032 Filed 4–27–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission 22017 the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. [Docket No. RP05–275–000] Magalie R. Salas, Secretary. [FR Doc. E5–2018 Filed 4–27–05; 8:45 am] Williston Basin Interstate Pipeline Company; Notice of Tariff Filing BILLING CODE 6717–01–P April 21, 2005. DEPARTMENT OF ENERGY Take notice that on April 15, 2005, Williston Basin Interstate Pipeline Company (Williston Basin) tendered for filing as part of its FERC Gas Tariff, Second Revised Volume No. 1, Fifth Revised Sheet No. 293, to become effective May 15, 2005. Williston Basin states that it is proposing to revise its tariff language to define the timeline governing situations where no acceptable third party bids for released capacity are received during the right of first refusal process. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 Federal Energy Regulatory Commission [Docket No. RP05–273–000] Williston Basin Interstate Pipeline Company Notice of Proposed Changes in FERC Gas Tariff April 21, 2005. Take notice that on April 15, 2005, Williston Basin Interstate Pipeline Company (Williston Basin) tendered for filing as part of its FERC Gas Tariff, Second Revised Volume No. 1, the E:\FR\FM\28APN1.SGM 28APN1

Agencies

[Federal Register Volume 70, Number 81 (Thursday, April 28, 2005)]
[Notices]
[Page 22017]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-2048]



[[Page 22017]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RP05-276-000]


Transcontinental Gas Pipe Line Corporation; Notice of Proposed 
Changes In FERC Gas Tariff

April 22, 2005.
    Take notice that on April 20, 2005, Transcontinental Gas Pipe Line 
Corporation (Transco) tendered for filing as part of its FERC Gas 
Tariff, Third Revised Volume No. 1, Fourth Revised Sheet No. 135F to be 
effective March 31, 2005.
    Transco states that the purpose of the instant filing is to revise 
section 8.2 of Rate Schedule WSS-Open Access by deleting Public Service 
Electric & Gas (PSE&G) from the list of buyers as a result of a 
permanent release of WSS-OA service effective March 31, 2005.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed in accordance with the provisions of 
Section 154.210 of the Commission's regulations (18 CFR 154.210). 
Anyone filing an intervention or protest must serve a copy of that 
document on the Applicant. Anyone filing an intervention or protest on 
or before the intervention or protest date need not serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Magalie R. Salas,
Secretary.
[FR Doc. E5-2048 Filed 4-27-05; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.