PPL Montana, LLC, et al.; Electric Rate and Corporate Filings, 22026-22027 [E5-2045]
Download as PDF
22026
Federal Register / Vol. 70, No. 81 / Thursday, April 28, 2005 / Notices
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–2039 Filed 4–27–05; 8:45 am]
BILLING CODE 6717–01–P
reporting requirement be incorporated
in the market-based rate tariff of each
entity authorized to make sales at
market-based rates.
Comment Date: 5 p.m. eastern time on
May 4, 2005.
3. Mitchell Electric Membership
Corporation
DEPARTMENT OF ENERGY
[Docket No. ER05–350–002]
Federal Energy Regulatory
Commission
Take notice that on April 15, 2005,
Mitchell Electric Membership
Corporation submitted a compliance
filing pursuant to the Commission’s
order issued March 25, 2005, Mitchell
Electric Membership Corporation, 110
FERC ¶ 61,350 (2005).
Comment Date: 5 p.m. eastern time on
May 6, 2005.
[Docket No. ER99–3491–004, et al.]
PPL Montana, LLC, et al.; Electric Rate
and Corporate Filings
April 21, 2005.
The following filings have been made
with the Commission. The filings are
listed in ascending order within each
docket classification.
1. PPL Montana, LLC, PPL Colstrip I,
LLC, PPL Colstrip II, LLC
[Docket Nos. ER99–3491–004, ER00–2184–
002, and ER00–2185–002]
Take notice that on April 15, 2005,
PPL Montana, LLC; PPL Colstrip I, LLC;
and PPL Colstrip II, LLC (collectively
the PPL MT Parties) submitted a
compliance filing pursuant to the
Commission’s deficiency letter issued
on March 25, 2005, in Docket Nos.
ER99–3491–002, et al., and pursuant to
the Commission’s order issued on
February 10, 2005, in Docket No. RM04–
14–000, Reporting Requirement for
Changes in Status for Public Utilities
With Market-Based Rate Authority,
Order No. 652, 70 FR 8253 (Feb 18,
2005). The PPL MT Parties state that the
compliance filing consists of responses
Commission Staff’s questions contained
in the March 25, 2005 deficiency letter
regarding the PPL and MT Parties’
triennial market-based rate update, and
revised tariff sheets to incorporate the
Commission’s change in status reporting
requirements.
The PPL MT Parties state that copies
of the filing were served on parties on
the official service list in Docket Nos.
ER99–3491–003, ER00–2184–001 and
ER00–2185–001.
Comment Date: 5 p.m. eastern time on
May 6, 2005.
2. Promet Energy Partners LLC
4. Wisconsin River Power Company
[Docket No. ER05–453–002]
Take notice that on April 14, 2005,
Wisconsin River Power Company
(Wisconsin River) filed revised tariff
sheets and information regarding
interlocking directorates in compliance
with the Commission’s Letter Order
issued March 25, 2005 (110 FERC
¶ 61,342).
Comment Date: 5 p.m. eastern time on
May 6, 2005.
5. Tucson Electric Power Company and
UNS Electric, Inc.
[Docket No. ER05–610–002]
Take notice that on April 19, 2005,
Tuscon Electric Power Company
(Tucson Electric) and UNS Electric, Inc.
filed substitute revised tariff sheets to its
February 18, 2005 filing in Docket Nos.
ER05–610–000 and 001 in compliance
with Standardization of Generator
Interconnection Agreements and
Procedures, 109 FERC ¶ 61,287 (2004).
Tucson Electric requests an effective
date of January 19, 2005.
Comment Date: 5 p.m. eastern time on
May 10, 2005.
[Docket No. ER05–713–001]
Take notice that on April 15, 2005,
KRK Energy submitted an amendment
to its March 17, 2005 filing in Docket
No. ER05–713–001.
Comment Date: 5 p.m. eastern time on
May 6, 2005.
7. Cokinos Power Trading Company
Take notice that on April 13, 2005,
Promet Energy Partners LLC, (Promet)
submitted for filing a revised Rate
Schedule FERC No. 1, Sheet No. 1.
Promet states that this revision was
necessary in order to comply with Order
No. 652, 110 FERC ¶ 61,097, (2005),
which requires change in status
[Docket No. ER05–832–000]
16:00 Apr 27, 2005
Jkt 205001
Take notice that on April 15, 2005,
Cokinos Power Trading Company,
submitted for filing a Notice of
Cancellation of its market-based rate
authority approved by the Commission’s
order issued May 14, 2002 in Docket No.
ER02–1365–000.
PO 00000
Frm 00035
Fmt 4703
8. New England Power Company
[Docket No. ER05–835–000]
Take notice that on April 18, 2005,
New England Power Company (NEP)
submitted two local service agreements
for local network service with Bear
Swamp Power Co., LLC (Bear Swamp
Power), under ISO New England Inc.’s
Transmission, Markets and Services
Tariff (ISO New England Inc., FERC
Electric Tariff No. 3).
NEP states that a copy of this filing
has been served upon Bear Swamp
Power, ISO New England Inc., and
regulators in the Commonwealth of
Massachusetts.
Comment Date: 5 p.m. eastern time on
May 9, 2005.
9. American Electric Power Service
Corporation
[Docket No. ER05–836–000 ]
Take notice that on April 18, 2005,
American Electric Power Service
Corporation (AEP), on behalf of its
affiliate Public Service Company of
Oklahoma, submitted for filing a letter
agreement that provides for AEP to
begin engineering, equipment
procurement and construction work on
the network upgrades required on the
AEP transmission system as a result of
interconnecting the wind power project
being developed by Blue Canyon
Windpower II, LLC to the Western
Farmers Electric Cooperative
transmission system. AEP requests an
effective date of April 4, 2005.
AEP states that a copy of the filing
was served upon Blue Canyon
Windpower II, LLC.
Comment Date: 5 p.m. eastern time on
May 9, 2005.
10. American Electric Power Service
Corporation
[Docket No. ER05–837–000]
6. KRK Energy
[Docket No. ER05–331–001]
VerDate jul<14>2003
Comment Date: 5 p.m. eastern time on
May 6, 2005.
Sfmt 4703
Take notice that on April 15, 2005,
the American Electric Power Service
Corporation, on behalf of its affiliate
Ohio Power Company (AEP) tendered
for filing pursuant to section 35.15 of
the Commission’s regulations, 18 CFR
section 35.15, a notice of termination of
an amended interconnection and
operation agreement between Ohio
Power Company and Lima Energy
Company, LLC. designated as Service
Agreement No. 463 under American
Electric Power Operating Companies’
open access transmission tariff. AEP
requests an effective date of April 15
2005.
AEP states that a copy of the filing
was served upon Lima Energy
E:\FR\FM\28APN1.SGM
28APN1
Federal Register / Vol. 70, No. 81 / Thursday, April 28, 2005 / Notices
Company, LLC and upon the Public
Utilities Commission of Ohio.
Comment Date: 5 p.m. eastern time on
May 6, 2005.
11. California Independent System
Operator Corporation
[Docket No. ER05–838–000]
Take notice that on April 18, 2005,
the California Independent System
Operator Corporation (ISO), tendered for
filing an amendment (Amendment No.
5) to revise the metered subsystem
agreement between the ISO and Silicon
Valley Power (SVP) for acceptance by
the Commission. The ISO states that the
purpose of Amendment No. 5 is to add
information regarding metering at the
proposed new SVP Switching Station.
The ISO requests privileged treatment,
pursuant to 18 CFR 388.112, with regard
to portions of the filing of Amendment
No. 5. The ISO requests an effective date
of April 19, 2005.
The ISO states that the non-privileged
elements of this filing have been served
on SVP, the California Public Utilities
Commission, and all entities on the
official service lists for Docket Nos.
ER02–2321–000, ER04–185–000, ER04–
940–000, ER05–81–000, ER05–449–000.
Comment Date: 5 p.m. eastern time on
May 9, 2005.
12. Oregon Trail Electric Consumers
Cooperative, Inc.
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all parties to this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–2045 Filed 4–27–05; 8:45 am]
Magalie R. Salas,
Secretary.
[FR Doc. E5–2021 Filed 4–27–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Take notice that on April 8, 2005,
Oregon Trail Electric Consumers
Cooperative, Inc. (Oregon Trail)
submitted an application pursuant to
section 204 of the Federal Power Act
seeking authorization to: (1) make longterm borrowings under a loan agreement
with the National Rural Utilities
Cooperative Finance Corporation (CFC)
in an amount not to exceed $10 million;
and (2) make no more than $5 million
of short-term borrowings under a line of
credit with CFC.
Oregon Trail also requests a waiver of
the Commission’s competitive bidding
and negotiated placement requirements
at 18 CFR 34.2.
Comment Date: 5 p.m. eastern time on
May 12, 2005.
Standard Paragraph
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
16:00 Apr 27, 2005
the pump-turbine, motor-generator, and
auxiliary equipment components. These
changes would increase the project’s
maximum hydraulic capacity at peak
generation by 20 to 25 percent, and
increase the firm peak generating
capacity by 202 megawatts.
In the environmental assessment (EA),
Commission staff has analyzed the
probable environmental effects of the
proposed work and has concluded that
approval, with appropriate
environmental measures, would not
constitute a major federal action
significantly affecting the quality of the
human environment.
A copy of the EA is attached to a
Commission order titled ‘‘Order
Amending License,’’ which was issued
April 20, 2005, and is available for
review at the Commission’s Public
Reference Room. A copy of the EA may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘elibrary’’ link. Enter the docket
number (P–2725) in the docket number
field to access the document. For
assistance, call (202) 502–8222, or (202)
502–8659 (for TTY).
BILLING CODE 6717–01–P
[Docket No. ES05–27–000]
VerDate jul<14>2003
22027
Jkt 205001
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Declaration of Intention and
Soliciting Comments, Protests, and/or
Motions To Intervene
[Project No. 2725–068 Georgia]
Oglethorpe Power Corporation,
Georgia Power Company; Notice of
Availability of Environmental
Assessment
April 21, 2005.
In accordance with the National
Environmental Policy Act of 1969, as
amended, and the Federal Energy
Regulatory Commission’s (Commission)
regulations (18 CFR part 380),
Commission staff have reviewed an
application for amendment of license
for the Rocky Mountain Pumped Storage
Project, filed January 24, 2005, to
increase the project’s authorized
generating capacity. The project is
located on Heath Creek, near the City of
Rome, in Floyd County, Georgia.
The project licensees, Oglethorpe
Power Corporation and Georgia Power
Company, propose to increase the
project’s generating capacity through
replacing the project’s existing pumpturbine runners and possibly modifying
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
April 20, 2005.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Declaration of
Intention.
b. Docket No: DI05–2–000.
c. Date Filed: April 8, 2005.
d. Applicant: Rick Hubberd.
e. Name of Project: Buttermilk Falls
Micro Hydroelectric Project.
f. Location: The proposed Buttermilk
Falls Micro Hydroelectric Project will be
located on Falls Brook, tributary to
Neversink River, near the town of
Cuddebackville, Orange County, New
York.
g. Filed Pursuant to: Section 23(b)(1)
of the Federal Power Act, 16 U.S.C.
817(b).
h. Applicant Contact: Mr. Rick
Hibberd, 544 Oakland Valley Road,
Cuddebackville, NY 12729, telephone
E:\FR\FM\28APN1.SGM
28APN1
Agencies
[Federal Register Volume 70, Number 81 (Thursday, April 28, 2005)]
[Notices]
[Pages 22026-22027]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-2045]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER99-3491-004, et al.]
PPL Montana, LLC, et al.; Electric Rate and Corporate Filings
April 21, 2005.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. PPL Montana, LLC, PPL Colstrip I, LLC, PPL Colstrip II, LLC
[Docket Nos. ER99-3491-004, ER00-2184-002, and ER00-2185-002]
Take notice that on April 15, 2005, PPL Montana, LLC; PPL Colstrip
I, LLC; and PPL Colstrip II, LLC (collectively the PPL MT Parties)
submitted a compliance filing pursuant to the Commission's deficiency
letter issued on March 25, 2005, in Docket Nos. ER99-3491-002, et al.,
and pursuant to the Commission's order issued on February 10, 2005, in
Docket No. RM04-14-000, Reporting Requirement for Changes in Status for
Public Utilities With Market-Based Rate Authority, Order No. 652, 70 FR
8253 (Feb 18, 2005). The PPL MT Parties state that the compliance
filing consists of responses Commission Staff's questions contained in
the March 25, 2005 deficiency letter regarding the PPL and MT Parties'
triennial market-based rate update, and revised tariff sheets to
incorporate the Commission's change in status reporting requirements.
The PPL MT Parties state that copies of the filing were served on
parties on the official service list in Docket Nos. ER99-3491-003,
ER00-2184-001 and ER00-2185-001.
Comment Date: 5 p.m. eastern time on May 6, 2005.
2. Promet Energy Partners LLC
[Docket No. ER05-331-001]
Take notice that on April 13, 2005, Promet Energy Partners LLC,
(Promet) submitted for filing a revised Rate Schedule FERC No. 1, Sheet
No. 1. Promet states that this revision was necessary in order to
comply with Order No. 652, 110 FERC ] 61,097, (2005), which requires
change in status reporting requirement be incorporated in the market-
based rate tariff of each entity authorized to make sales at market-
based rates.
Comment Date: 5 p.m. eastern time on May 4, 2005.
3. Mitchell Electric Membership Corporation
[Docket No. ER05-350-002]
Take notice that on April 15, 2005, Mitchell Electric Membership
Corporation submitted a compliance filing pursuant to the Commission's
order issued March 25, 2005, Mitchell Electric Membership Corporation,
110 FERC ] 61,350 (2005).
Comment Date: 5 p.m. eastern time on May 6, 2005.
4. Wisconsin River Power Company
[Docket No. ER05-453-002]
Take notice that on April 14, 2005, Wisconsin River Power Company
(Wisconsin River) filed revised tariff sheets and information regarding
interlocking directorates in compliance with the Commission's Letter
Order issued March 25, 2005 (110 FERC ] 61,342).
Comment Date: 5 p.m. eastern time on May 6, 2005.
5. Tucson Electric Power Company and UNS Electric, Inc.
[Docket No. ER05-610-002]
Take notice that on April 19, 2005, Tuscon Electric Power Company
(Tucson Electric) and UNS Electric, Inc. filed substitute revised
tariff sheets to its February 18, 2005 filing in Docket Nos. ER05-610-
000 and 001 in compliance with Standardization of Generator
Interconnection Agreements and Procedures, 109 FERC ] 61,287 (2004).
Tucson Electric requests an effective date of January 19, 2005.
Comment Date: 5 p.m. eastern time on May 10, 2005.
6. KRK Energy
[Docket No. ER05-713-001]
Take notice that on April 15, 2005, KRK Energy submitted an
amendment to its March 17, 2005 filing in Docket No. ER05-713-001.
Comment Date: 5 p.m. eastern time on May 6, 2005.
7. Cokinos Power Trading Company
[Docket No. ER05-832-000]
Take notice that on April 15, 2005, Cokinos Power Trading Company,
submitted for filing a Notice of Cancellation of its market-based rate
authority approved by the Commission's order issued May 14, 2002 in
Docket No. ER02-1365-000.
Comment Date: 5 p.m. eastern time on May 6, 2005.
8. New England Power Company
[Docket No. ER05-835-000]
Take notice that on April 18, 2005, New England Power Company (NEP)
submitted two local service agreements for local network service with
Bear Swamp Power Co., LLC (Bear Swamp Power), under ISO New England
Inc.'s Transmission, Markets and Services Tariff (ISO New England Inc.,
FERC Electric Tariff No. 3).
NEP states that a copy of this filing has been served upon Bear
Swamp Power, ISO New England Inc., and regulators in the Commonwealth
of Massachusetts.
Comment Date: 5 p.m. eastern time on May 9, 2005.
9. American Electric Power Service Corporation
[Docket No. ER05-836-000 ]
Take notice that on April 18, 2005, American Electric Power Service
Corporation (AEP), on behalf of its affiliate Public Service Company of
Oklahoma, submitted for filing a letter agreement that provides for AEP
to begin engineering, equipment procurement and construction work on
the network upgrades required on the AEP transmission system as a
result of interconnecting the wind power project being developed by
Blue Canyon Windpower II, LLC to the Western Farmers Electric
Cooperative transmission system. AEP requests an effective date of
April 4, 2005.
AEP states that a copy of the filing was served upon Blue Canyon
Windpower II, LLC.
Comment Date: 5 p.m. eastern time on May 9, 2005.
10. American Electric Power Service Corporation
[Docket No. ER05-837-000]
Take notice that on April 15, 2005, the American Electric Power
Service Corporation, on behalf of its affiliate Ohio Power Company
(AEP) tendered for filing pursuant to section 35.15 of the Commission's
regulations, 18 CFR section 35.15, a notice of termination of an
amended interconnection and operation agreement between Ohio Power
Company and Lima Energy Company, LLC. designated as Service Agreement
No. 463 under American Electric Power Operating Companies' open access
transmission tariff. AEP requests an effective date of April 15 2005.
AEP states that a copy of the filing was served upon Lima Energy
[[Page 22027]]
Company, LLC and upon the Public Utilities Commission of Ohio.
Comment Date: 5 p.m. eastern time on May 6, 2005.
11. California Independent System Operator Corporation
[Docket No. ER05-838-000]
Take notice that on April 18, 2005, the California Independent
System Operator Corporation (ISO), tendered for filing an amendment
(Amendment No. 5) to revise the metered subsystem agreement between the
ISO and Silicon Valley Power (SVP) for acceptance by the Commission.
The ISO states that the purpose of Amendment No. 5 is to add
information regarding metering at the proposed new SVP Switching
Station. The ISO requests privileged treatment, pursuant to 18 CFR
388.112, with regard to portions of the filing of Amendment No. 5. The
ISO requests an effective date of April 19, 2005.
The ISO states that the non-privileged elements of this filing have
been served on SVP, the California Public Utilities Commission, and all
entities on the official service lists for Docket Nos. ER02-2321-000,
ER04-185-000, ER04-940-000, ER05-81-000, ER05-449-000.
Comment Date: 5 p.m. eastern time on May 9, 2005.
12. Oregon Trail Electric Consumers Cooperative, Inc.
[Docket No. ES05-27-000]
Take notice that on April 8, 2005, Oregon Trail Electric Consumers
Cooperative, Inc. (Oregon Trail) submitted an application pursuant to
section 204 of the Federal Power Act seeking authorization to: (1) make
long-term borrowings under a loan agreement with the National Rural
Utilities Cooperative Finance Corporation (CFC) in an amount not to
exceed $10 million; and (2) make no more than $5 million of short-term
borrowings under a line of credit with CFC.
Oregon Trail also requests a waiver of the Commission's competitive
bidding and negotiated placement requirements at 18 CFR 34.2.
Comment Date: 5 p.m. eastern time on May 12, 2005.
Standard Paragraph
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant and all parties to this proceeding.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-2045 Filed 4-27-05; 8:45 am]
BILLING CODE 6717-01-P