Federal Register / Vol. 70, No. 81 / Thursday, April 28, 2005 / Notices
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all parties to this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E5–2035 Filed 4–27–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER01–1527–006, et al.]
Sierra Pacific Power Company, et al.;
Electric Rate and Corporate Filings
April 20, 2005.
The following filings have been made
with the Commission. The filings are
listed in ascending order within each
docket classification.
1. Sierra Pacific Power Company;
Nevada Power Company
[Docket Nos. ER01–1527–006 and ER01–
1529–006]
Take notice that on March 3, 2005,
Sierra Pacific Power Company and
Nevada Power Company (collectively,
Sierra) submitted a response to recent
Commission staff inquiries regarding
Sierra’s triennial market power study
filed October 28, 2004, as supplemented
on November 12, 2004.
Comment Date: 5 p.m. eastern time on
May 2, 2005.
VerDate jul<14>2003
16:00 Apr 27, 2005
Jkt 205001
2. Somerset Windpower, LLC
[Docket Nos. ER01–2139–006 and ER05–661–
001]
Take notice that, on April 15, 2005,
Somerset Windpower, LLC (Somerset)
filed a supplement to its February 28,
2005 filing in Docket Nos. ER01–2139–
005 and ER05–661–000.
Somerset states that copies of the
filing were served on parties on the
official service list for Docket Nos.
ER01–2139 and ER05–661 and on the
Florida Public Service Commission.
Comment Date: 5 p.m. eastern time on
April 22, 2005.
3. Midwest Independent Transmission
System Operator, Inc.
[Docket Nos. ER04–691–035 and EL04–104–
033]
Take notice that on April 14, 2005 the
Midwest Independent Transmission
System Operator, Inc. (Midwest ISO)
submitted its errata filing to its April 6,
2005 filing in Docket Nos. ER04–691–
034 and EL04–104–032. The Midwest
ISO requests an effective date of April
1, 2005 for the tariff sheets submitted as
part of this filing.
The Midwest ISO states that it has
electronically served a copy of this
filing, with attachments, upon all
Midwest ISO Members, Member
representatives of Transmission Owners
and Non-Transmission Owners, the
Midwest ISO Advisory Committee
participants, as well as all State
commissions within the region. In
addition, the Midwest ISO states that
the filing has been electronically posted
on the Midwest ISO’s Web site at
https://www.midwestiso.org under the
heading ‘‘Filings to FERC’’ for other
interested parties in this matter. The
Midwest ISO indicates that it will
provide hard copies to any interested
parties upon request.
Comment Date: 5 p.m. eastern time on
May 5, 2005.
4. Georgia Power Company
[Docket Nos. ER05–282–001 and ER04–939–
002]
Take notice that on April 14, 2005,
Georgia Power Company (Georgia
Power) resubmitted the Control Area
Compact by and among Georgia Power
Company, Oglethorpe Power
Corporation, and Georgia System
Operations Corporation (Control Area
Compact), accepted by the
Commission’s letter order issued
January 27, 2005 in the above captioned
dockets, to reflect a rate schedule
designation and other information in
accordance with section 35.9 of the
Commission’s regulations, 18 CFR 35.9
(2004). Georgia Power Company also
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
22023
submitted a Notice of Termination of
the Revised and Restated Coordination
Services Agreement Between and
Among Georgia Power Company,
Oglethorpe Power Corporation, and
Georgia System Operations Corporation,
which has been supplanted by the
Control Area Compact.
Comment Date: 5 p.m. eastern time on
May 5, 2005.
5. Saracen Energy LP
[Docket No. ER05–493–001]
Take notice that on April 14, 2005,
Saracen Energy LP (Saracen Energy)
submitted a compliance filing pursuant
to the Commission’s March 24, 2005
order in this proceeding, 110 FERC
¶ 61,332 (2005). Saracen Energy states
that the compliance filing consists of an
amendment to Saracen Energy’s Rate
Schedule FERC No. 1 to reflect the
change-in-status reporting requirement
adopted in Order No. 652, Reporting
Requirement for Change in Status for
Public Utilities with Market-Based Rate
Authority, 110 FERC ¶ 61,097 (2005).
Saracen Energy states that copies of
the filing were served on parties on the
official service list in the abovecaptioned proceeding.
Comment Date: 5 p.m. eastern time on
May 5, 2005.
6. Saracen Energy Power Advisors LP
[Docket No. ER05–494–001]
Take notice that on April 14, 2005,
Saracen Energy Power Advisors LP
(Saracen Power Advisors) submitted a
compliance filing pursuant to the
Commission’s March 24, 2005 order in
this proceeding, 110 FERC ¶ 61,332
(2005). Saracen states that the
compliance filing consists of an
amendment to Saracen Power
Advisors’s Rate Schedule FERC No. 1 to
reflect the change-in-status reporting
requirement adopted in Order No. 652,
Reporting Requirement for Change in
Status for Public Utilities with MarketBased Rate Authority, 110 FERC
¶ 61,097 (2005).
Saracen Power Advisors states that
copies of the filing were served on
parties on the official service list in the
above-captioned proceeding.
Comment Date: 5 p.m. eastern time on
May 5, 2005.
7. Saracen Merchant Energy LP
[Docket No. ER05–495–001]
Take notice that, on April 14, 2005,
Saracen Merchant Energy LP (Saracen
Merchant) submitted a compliance
filing pursuant to the Commission’s
March 24, 2005 order in this
proceeding, 110 FERC ¶ 61,332 (2005).
Saracen Merchant states that the
E:\FR\FM\28APN1.SGM
28APN1
22024
Federal Register / Vol. 70, No. 81 / Thursday, April 28, 2005 / Notices
compliance filing consists of an
amendment to Saracen Merchant’s Rate
Schedule FERC No. 1 to reflect the
change-in-status reporting requirement
adopted in Order No. 652, Reporting
Requirement for Change in Status for
Public Utilities with Market-Based Rate
Authority, 110 FERC ¶ 61,097 (2005).
Saracen Merchant states that copies of
the filing were served on parties on the
official service list in the proceeding.
Comment Date: 5 p.m. eastern time on
May 5, 2005.
8. Wabash Valley Power Association,
Inc.
[Docket No. ER05–814–000]
Take notice that on April 13, 2005,
Wabash Valley Power Association, Inc.
(Wabash Valley) submitted Wabash
Valley Rate Schedule Nos. 33 through
47 and a request for certain waivers of
the Commission’s regulations.
Wabash Valley states that copies of
the filing were served upon Wabash
Valley’s Members, AES Power, Inc.,
American Municipal Power-Ohio, Inc.,
Big Rivers Electric Corporation,
Cincinnati Gas and Electric Company,
Central Illinois Public Service
Company, Indiana Municipal Power
Agency, Hoosier Energy Rural Electric
Cooperative, Southern Indiana Gas and
Electric Company, PSI Energy, Inc.,
Cinergy Services, Inc., Ontario Power
Generation, Inc., Soyland Power
Cooperative, Inc., Illinois Municipal
Electric Agency, Louisville Gas and
Electric Company, Indianapolis Power &
Light Company, Northern Indiana
Public Service Company, and the State
public service commissions in Illinois,
Indiana, Michigan and Ohio.
Comment Date: 5 p.m. eastern time on
May 4, 2005.
9. PJM Interconnection, L.L.C.
[Docket No. ER05–815–000]
Take notice that on April 13, 2005,
PJM Interconnection, L.L.C. (PJM)
submitted for filing an executed
interconnection service agreement (ISA)
among PJM, PSEG Nuclear LLC, Public
Service Electric and Gas Company and
Atlantic City Electric Company, and a
notice of cancellation for an ISA that
has been superseded. PJM requests an
effective date of March 14, 1005.
PJM states that copies of this filing
were served upon the parties to the
agreement and the State regulatory
commissions within the PJM region.
Comment Date: 5 p.m. eastern time on
May 4, 2005.
VerDate jul<14>2003
16:00 Apr 27, 2005
Jkt 205001
10. CES Marketing VI, LLC , CES
Marketing VII, LLC, CES Marketing
VIII, LLC, CES Marketing IX, LLC, CES
Marketing X, LLC
Comment Date: 5 p.m. eastern time on
May 5, 2005.
[Docket Nos. ER05–816–000, ER05–817–000,
ER05–818–000, ER05–819–000, and ER05–
820–000]
[Docket No. ER05–824–000]
Take notice that on April 13, 2005,
CES Marketing VI, LLC, CES Marketing
VII, LLC, CES Marketing VIII, LLC, CES
Marketing IX, LLC and CES Marketing
X, LLC (Applicants) submitted: (1)
proposed rate schedules under which
Applicants will make wholesale sales of
electric energy, capacity, replacement
reserves, and ancillary services at
market-based rates, to reassign
transmission capacity, and to resell firm
transmission rights; (2) requests for the
grant of certain blanket approvals; (3)
and requests for the grant of certain
waivers.
Comment Date: 5 p.m. eastern time on
May 4, 2005.
11. Pastoria Energy Facility, L.L.C.
[Docket No. ER05–822–000]
Take notice that on April 14, 2005,
Pastoria Energy Facility, L.L.C.
(Pastoria) submitted: (1) Notification of
a change in the name of the company
from Pastoria Energy Center, LLC to
Pastoria Energy Facility, L.L.C.; and (2)
a revised market-based rate tariff to
provide the correct name of the
company and to incorporate the
reporting requirements adopted by the
Commission in Order No. 652,
Reporting Requirements for Changes in
Status for Public Utilities with MarketBased Rate Authority, 110 FERC
¶ 61,097 (2005).
Pastoria states that a copy of this
filing has been mailed to each person
designated on the official service list
compiled by the Secretary of this
proceeding.
Comment Date: 5 p.m. eastern time on
May 5, 2005.
12. Florida Power & Light Company
[Docket No. ER05–823–000]
Take notice that on April 14, 2005,
Florida Power & Light Company (FPL)
tendered for filing a Notice of
Cancellation of Service Agreement No.
196, an Interconnection & Operation
Agreement between FPL and Blue
Heron Energy Center, LLC (Blue Heron).
FPL states that the Cancellation of
Service Agreement No. 196 has been
mutually agreed to by FPL and Blue
Heron. FPL requests that the
cancellation be made effective March
21, 2005.
FPL states that a copy of the filing was
served upon Blue Heron.
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
13. American Electric Power Service
Corporation
Take notice that on April 14, 2004,
American Electric Power Service
Corporation (AEPSC), tendered for filing
a Interconnection and Local Delivery
Service Agreement (ILDSA) for Wabash
Valley Power Association, Inc. (Wabash
Valley) of the Indianapolis, Indiana, and
a Facilities Agreement, as an attachment
to the ILDSA, for the establishment of a
new Delivery Point (the Huntertown
Delivery Point) between Wabash Valley
and AEP. The ILDSA is being
designated and filed as Service
Agreement No. 1262 under the PJM
Interconnection, LLC (PJM’s) FERC
Open Access Transmission Tariff Sixth
Revised Volume No. 1, pursuant to
FERC Order dated February 25, 2005
under Docket Nos. ER04–1003–002 et
al. and EL05–62–000. Service
Agreement No. 1262 is needed to
eliminate from the Network Integration
Transmission Service Agreement
between AEP and Wabash Valley those
transmission related services that are
now provided by PJM. AEPSC requests
an effective date of April 1, 2005.
AEPSC states that a copy of the filing
was served upon Wabash Valley and the
Public Service Commissions affected by
the filing.
Comment Date: 5 p.m. eastern time on
May 5, 2005.
14. Midwest Independent Transmission
System Operator, Inc.
[Docket No. ER05–825–000]
Take notice that on April 15, 2005,
Midwest Independent Transmission
System Operator, Inc., (Midwest ISO)
pursuant to section 205 of the Federal
Power Act and section 35.13 of the
Commission’s regulations, 18 CFR 35.13
(2002), submitted for filing revisions to
Exhibit A and Exhibit B of the Network
Integration Transmission Service
Agreement under the Midwest ISO’s
Open Access Transmission Tariff, FERC
Electric Tariff, Second Revised Volume
No. 1, between the City of St. Louis,
Michigan and the Midwest ISO.
Midwest ISO states that a copy of this
filing has been served on all parties on
the official service list compiled by the
Secretary in this proceeding.
Comment Date: 5 p.m. eastern time on
May 6, 2005.
15. Consolidated Edison Company of
New York, Inc.
[Docket No. ER05–826–000]
Take notice that on April 15, 2005,
Consolidated Edison Company of New
E:\FR\FM\28APN1.SGM
28APN1
Federal Register / Vol. 70, No. 81 / Thursday, April 28, 2005 / Notices
York, Inc. (Con Edison) tendered for
filing amendments to Con Edison’s
Open Access Transmission Tariff, FERC
Electric Tariff, First Revised Volume No.
1. Con Edison states that the filing
proposes to revise the rate design for
unbundled retail transmission service to
customers that own on-site electric
generators. Con Edison requests an
effective date of June 14, 2005.
Comment Date: 5 p.m. eastern time on
May 6, 2005.
16. Northeast Utilities Service Company
[Docket No. ER05–827–000]
Take notice that on April 15, 2005,
Northeast Utilities Service Company
(NUSCO), on behalf of its operating
company affiliates, The Connecticut
Light and Power Company (CL&P),
Western Massachusetts Electric
Company (WMECO), Holyoke Water
Power Company (HWP), Holyoke Power
and Electric Company (HP&E), and
Public Service Company of New
Hampshire (PSNH), submitted a Notice
of Cancellation of the Memorandum of
Understanding—Pooling of Generation
and Transmission (NUG&T) between
CL&P, WMECO, HWP, and HP&E;
Notice of Cancellation of the Sharing
Agreement between PSNH and CL&P;
and Notice of Cancellation of the
Capacity Transfer Agreements between
CL&P and PSNH.
NUSCO states that copies of the filing
were served upon the NUSCO’s
jurisdictional customers, Connecticut
Department of Public Utility Control,
New Hampshire Public Utilities
Commission, and Massachusetts
Department of Telecommunications and
Energy.
Comment Date: 5 p.m. eastern time on
May 6, 2005.
NWEC states that copies of this filing
have been provided to the respective
parties and to the Public Service
Commission of Wisconsin.
Comment Date: 5 p.m. eastern time on
May 6, 2005.
18. American Transmission Company
LLC
[Docket No. ER05–829–000]
Take notice that on April 15, 2005,
American Transmission Company LLC
(ATCLLC) tendered for filing a
Distribution-Transmission
Interconnection Agreement between
ATCLLC and Lodi Utilities. ATCLLC
requests an effective date of March 31,
2005.
ATCLLC states that it has served a
copy of this filing on Lodi Utilities, the
Midwest ISO, and the Public Service
Commission of Wisconsin.
Comment Date: 5 p.m. eastern time on
May 6, 2005.
19. Xcel Energy Services Inc.
[Docket No. ER05–830–000]
Take notice that on April 15, 2005,
Xcel Energy Services Inc., on behalf of
Public Service Company of Colorado
(PSCo), submitted an Amended and
Restated Generation Interconnection
Agreement between Ridge Crest Wind
Partners, LLC and PSCo.
Comment Date: 5 p.m. eastern time on
May 6, 2005.
20. East Texas Electric Cooperative, Inc.
[Docket No. ER05–831–000]
[Docket No. ER05–828–000]
Take notice that April 15, 2005,
Northwestern Wisconsin Electric
Company, (NWEC) tendered for filing
proposed changes in its Transmission
Use Charge, Rate Schedule FERC No. 2.
NWEC states that the proposed changes
would increase revenues from
jurisdictional sales by $4,409.20 based
on the 12-month period ending April
30, 2005. NWEC also states that it is
proposing this rate schedule change to
more accurately reflect the actual cost of
transmitting energy from one utility to
another based on current cost data.
NWEC further states that the service
agreement for which this rate is
calculated calls for the Transmission
Use Charge to be reviewed annually and
revised on May 1. NWEC requests an
effective date of May 1, 2005.
Take notice that on April 13, 2005,
East Texas Electric Cooperative, Inc.
(ETEC) submitted for filing a
withdrawal of its filed rates, effective
upon ETEC’s April 13, 2005 receipt of
Rural Utilities Service guaranteed loan
funds, ETEC will no longer meet the
definition of a ‘‘public utility’’ pursuant
to section 201 of the Federal Power Act,
16 U.S.C. 824 and thus will not be
subject to regulation by the Commission
for so long as ETEC has RUS loan funds
outstanding.
ETEC states that it has provided its
three constituent members with a copy
of this filing.
Comment Date: 5 p.m. eastern time on
May 4, 2005.
21. American Transmission Company
LLC
17. Northwestern Wisconsin Electric
Company
VerDate jul<14>2003
16:00 Apr 27, 2005
Jkt 205001
[Docket No. ER05–833–000]
Take notice that on April 13, 2005,
American Transmission Company LLC
(ATCLLC) tendered for filing an
Amended and Restated GenerationTransmission Interconnection
Agreement among American
Transmission Company LLC, Wisconsin
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
22025
Electric Power Company, and the
Midwest Independent Transmission
System Operator, Inc., (for the Elm Road
Generating Facility) Docket No. ER02–
548–001. ATCLLC requests an effective
date of April 16, 2005.
Comment Date: 5 p.m. eastern time on
May 4, 2005.
22. American Transmission Company
LLC
[Docket No. ER05–834–000]
Take notice that on April 14, 2005,
American Transmission Company LLC
(ATCLLC) tendered for filing an
Amended and Restated GenerationTransmission Interconnection
Agreement among American
Transmission Company LLC, Wisconsin
Electric Power Company, and the
Midwest Independent Transmission
System Operator, Inc., (for Port
Washington Generating Facility) Docket
No. ER02–548–001. ATCLLC requests
an effective date of April 17, 2005.
Comment Date: 5 p.m. eastern time on
May 5, 2005.
Standard Paragraph
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all parties to this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
E:\FR\FM\28APN1.SGM
28APN1
22026
Federal Register / Vol. 70, No. 81 / Thursday, April 28, 2005 / Notices
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–2039 Filed 4–27–05; 8:45 am]
BILLING CODE 6717–01–P
reporting requirement be incorporated
in the market-based rate tariff of each
entity authorized to make sales at
market-based rates.
Comment Date: 5 p.m. eastern time on
May 4, 2005.
3. Mitchell Electric Membership
Corporation
DEPARTMENT OF ENERGY
[Docket No. ER05–350–002]
Federal Energy Regulatory
Commission
Take notice that on April 15, 2005,
Mitchell Electric Membership
Corporation submitted a compliance
filing pursuant to the Commission’s
order issued March 25, 2005, Mitchell
Electric Membership Corporation, 110
FERC ¶ 61,350 (2005).
Comment Date: 5 p.m. eastern time on
May 6, 2005.
[Docket No. ER99–3491–004, et al.]
PPL Montana, LLC, et al.; Electric Rate
and Corporate Filings
April 21, 2005.
The following filings have been made
with the Commission. The filings are
listed in ascending order within each
docket classification.
1. PPL Montana, LLC, PPL Colstrip I,
LLC, PPL Colstrip II, LLC
[Docket Nos. ER99–3491–004, ER00–2184–
002, and ER00–2185–002]
Take notice that on April 15, 2005,
PPL Montana, LLC; PPL Colstrip I, LLC;
and PPL Colstrip II, LLC (collectively
the PPL MT Parties) submitted a
compliance filing pursuant to the
Commission’s deficiency letter issued
on March 25, 2005, in Docket Nos.
ER99–3491–002, et al., and pursuant to
the Commission’s order issued on
February 10, 2005, in Docket No. RM04–
14–000, Reporting Requirement for
Changes in Status for Public Utilities
With Market-Based Rate Authority,
Order No. 652, 70 FR 8253 (Feb 18,
2005). The PPL MT Parties state that the
compliance filing consists of responses
Commission Staff’s questions contained
in the March 25, 2005 deficiency letter
regarding the PPL and MT Parties’
triennial market-based rate update, and
revised tariff sheets to incorporate the
Commission’s change in status reporting
requirements.
The PPL MT Parties state that copies
of the filing were served on parties on
the official service list in Docket Nos.
ER99–3491–003, ER00–2184–001 and
ER00–2185–001.
Comment Date: 5 p.m. eastern time on
May 6, 2005.
2. Promet Energy Partners LLC
4. Wisconsin River Power Company
[Docket No. ER05–453–002]
Take notice that on April 14, 2005,
Wisconsin River Power Company
(Wisconsin River) filed revised tariff
sheets and information regarding
interlocking directorates in compliance
with the Commission’s Letter Order
issued March 25, 2005 (110 FERC
¶ 61,342).
Comment Date: 5 p.m. eastern time on
May 6, 2005.
5. Tucson Electric Power Company and
UNS Electric, Inc.
[Docket No. ER05–610–002]
Take notice that on April 19, 2005,
Tuscon Electric Power Company
(Tucson Electric) and UNS Electric, Inc.
filed substitute revised tariff sheets to its
February 18, 2005 filing in Docket Nos.
ER05–610–000 and 001 in compliance
with Standardization of Generator
Interconnection Agreements and
Procedures, 109 FERC ¶ 61,287 (2004).
Tucson Electric requests an effective
date of January 19, 2005.
Comment Date: 5 p.m. eastern time on
May 10, 2005.
[Docket No. ER05–713–001]
Take notice that on April 15, 2005,
KRK Energy submitted an amendment
to its March 17, 2005 filing in Docket
No. ER05–713–001.
Comment Date: 5 p.m. eastern time on
May 6, 2005.
7. Cokinos Power Trading Company
Take notice that on April 13, 2005,
Promet Energy Partners LLC, (Promet)
submitted for filing a revised Rate
Schedule FERC No. 1, Sheet No. 1.
Promet states that this revision was
necessary in order to comply with Order
No. 652, 110 FERC ¶ 61,097, (2005),
which requires change in status
[Docket No. ER05–832–000]
16:00 Apr 27, 2005
Jkt 205001
Take notice that on April 15, 2005,
Cokinos Power Trading Company,
submitted for filing a Notice of
Cancellation of its market-based rate
authority approved by the Commission’s
order issued May 14, 2002 in Docket No.
ER02–1365–000.
PO 00000
Frm 00035
Fmt 4703
8. New England Power Company
[Docket No. ER05–835–000]
Take notice that on April 18, 2005,
New England Power Company (NEP)
submitted two local service agreements
for local network service with Bear
Swamp Power Co., LLC (Bear Swamp
Power), under ISO New England Inc.’s
Transmission, Markets and Services
Tariff (ISO New England Inc., FERC
Electric Tariff No. 3).
NEP states that a copy of this filing
has been served upon Bear Swamp
Power, ISO New England Inc., and
regulators in the Commonwealth of
Massachusetts.
Comment Date: 5 p.m. eastern time on
May 9, 2005.
9. American Electric Power Service
Corporation
[Docket No. ER05–836–000 ]
Take notice that on April 18, 2005,
American Electric Power Service
Corporation (AEP), on behalf of its
affiliate Public Service Company of
Oklahoma, submitted for filing a letter
agreement that provides for AEP to
begin engineering, equipment
procurement and construction work on
the network upgrades required on the
AEP transmission system as a result of
interconnecting the wind power project
being developed by Blue Canyon
Windpower II, LLC to the Western
Farmers Electric Cooperative
transmission system. AEP requests an
effective date of April 4, 2005.
AEP states that a copy of the filing
was served upon Blue Canyon
Windpower II, LLC.
Comment Date: 5 p.m. eastern time on
May 9, 2005.
10. American Electric Power Service
Corporation
[Docket No. ER05–837–000]
6. KRK Energy
[Docket No. ER05–331–001]
VerDate jul<14>2003
Comment Date: 5 p.m. eastern time on
May 6, 2005.
Sfmt 4703
Take notice that on April 15, 2005,
the American Electric Power Service
Corporation, on behalf of its affiliate
Ohio Power Company (AEP) tendered
for filing pursuant to section 35.15 of
the Commission’s regulations, 18 CFR
section 35.15, a notice of termination of
an amended interconnection and
operation agreement between Ohio
Power Company and Lima Energy
Company, LLC. designated as Service
Agreement No. 463 under American
Electric Power Operating Companies’
open access transmission tariff. AEP
requests an effective date of April 15
2005.
AEP states that a copy of the filing
was served upon Lima Energy
E:\FR\FM\28APN1.SGM
28APN1
Agencies
[Federal Register Volume 70, Number 81 (Thursday, April 28, 2005)]
[Notices]
[Pages 22023-22026]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-2039]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER01-1527-006, et al.]
Sierra Pacific Power Company, et al.; Electric Rate and Corporate
Filings
April 20, 2005.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. Sierra Pacific Power Company; Nevada Power Company
[Docket Nos. ER01-1527-006 and ER01-1529-006]
Take notice that on March 3, 2005, Sierra Pacific Power Company and
Nevada Power Company (collectively, Sierra) submitted a response to
recent Commission staff inquiries regarding Sierra's triennial market
power study filed October 28, 2004, as supplemented on November 12,
2004.
Comment Date: 5 p.m. eastern time on May 2, 2005.
2. Somerset Windpower, LLC
[Docket Nos. ER01-2139-006 and ER05-661-001]
Take notice that, on April 15, 2005, Somerset Windpower, LLC
(Somerset) filed a supplement to its February 28, 2005 filing in Docket
Nos. ER01-2139-005 and ER05-661-000.
Somerset states that copies of the filing were served on parties on
the official service list for Docket Nos. ER01-2139 and ER05-661 and on
the Florida Public Service Commission.
Comment Date: 5 p.m. eastern time on April 22, 2005.
3. Midwest Independent Transmission System Operator, Inc.
[Docket Nos. ER04-691-035 and EL04-104-033]
Take notice that on April 14, 2005 the Midwest Independent
Transmission System Operator, Inc. (Midwest ISO) submitted its errata
filing to its April 6, 2005 filing in Docket Nos. ER04-691-034 and
EL04-104-032. The Midwest ISO requests an effective date of April 1,
2005 for the tariff sheets submitted as part of this filing.
The Midwest ISO states that it has electronically served a copy of
this filing, with attachments, upon all Midwest ISO Members, Member
representatives of Transmission Owners and Non-Transmission Owners, the
Midwest ISO Advisory Committee participants, as well as all State
commissions within the region. In addition, the Midwest ISO states that
the filing has been electronically posted on the Midwest ISO's Web site
at https://www.midwestiso.org under the heading ``Filings to FERC'' for
other interested parties in this matter. The Midwest ISO indicates that
it will provide hard copies to any interested parties upon request.
Comment Date: 5 p.m. eastern time on May 5, 2005.
4. Georgia Power Company
[Docket Nos. ER05-282-001 and ER04-939-002]
Take notice that on April 14, 2005, Georgia Power Company (Georgia
Power) resubmitted the Control Area Compact by and among Georgia Power
Company, Oglethorpe Power Corporation, and Georgia System Operations
Corporation (Control Area Compact), accepted by the Commission's letter
order issued January 27, 2005 in the above captioned dockets, to
reflect a rate schedule designation and other information in accordance
with section 35.9 of the Commission's regulations, 18 CFR 35.9 (2004).
Georgia Power Company also submitted a Notice of Termination of the
Revised and Restated Coordination Services Agreement Between and Among
Georgia Power Company, Oglethorpe Power Corporation, and Georgia System
Operations Corporation, which has been supplanted by the Control Area
Compact.
Comment Date: 5 p.m. eastern time on May 5, 2005.
5. Saracen Energy LP
[Docket No. ER05-493-001]
Take notice that on April 14, 2005, Saracen Energy LP (Saracen
Energy) submitted a compliance filing pursuant to the Commission's
March 24, 2005 order in this proceeding, 110 FERC ] 61,332 (2005).
Saracen Energy states that the compliance filing consists of an
amendment to Saracen Energy's Rate Schedule FERC No. 1 to reflect the
change-in-status reporting requirement adopted in Order No. 652,
Reporting Requirement for Change in Status for Public Utilities with
Market-Based Rate Authority, 110 FERC ] 61,097 (2005).
Saracen Energy states that copies of the filing were served on
parties on the official service list in the above-captioned proceeding.
Comment Date: 5 p.m. eastern time on May 5, 2005.
6. Saracen Energy Power Advisors LP
[Docket No. ER05-494-001]
Take notice that on April 14, 2005, Saracen Energy Power Advisors
LP (Saracen Power Advisors) submitted a compliance filing pursuant to
the Commission's March 24, 2005 order in this proceeding, 110 FERC ]
61,332 (2005). Saracen states that the compliance filing consists of an
amendment to Saracen Power Advisors's Rate Schedule FERC No. 1 to
reflect the change-in-status reporting requirement adopted in Order No.
652, Reporting Requirement for Change in Status for Public Utilities
with Market-Based Rate Authority, 110 FERC ] 61,097 (2005).
Saracen Power Advisors states that copies of the filing were served
on parties on the official service list in the above-captioned
proceeding.
Comment Date: 5 p.m. eastern time on May 5, 2005.
7. Saracen Merchant Energy LP
[Docket No. ER05-495-001]
Take notice that, on April 14, 2005, Saracen Merchant Energy LP
(Saracen Merchant) submitted a compliance filing pursuant to the
Commission's March 24, 2005 order in this proceeding, 110 FERC ] 61,332
(2005). Saracen Merchant states that the
[[Page 22024]]
compliance filing consists of an amendment to Saracen Merchant's Rate
Schedule FERC No. 1 to reflect the change-in-status reporting
requirement adopted in Order No. 652, Reporting Requirement for Change
in Status for Public Utilities with Market-Based Rate Authority, 110
FERC ] 61,097 (2005).
Saracen Merchant states that copies of the filing were served on
parties on the official service list in the proceeding.
Comment Date: 5 p.m. eastern time on May 5, 2005.
8. Wabash Valley Power Association, Inc.
[Docket No. ER05-814-000]
Take notice that on April 13, 2005, Wabash Valley Power
Association, Inc. (Wabash Valley) submitted Wabash Valley Rate Schedule
Nos. 33 through 47 and a request for certain waivers of the
Commission's regulations.
Wabash Valley states that copies of the filing were served upon
Wabash Valley's Members, AES Power, Inc., American Municipal Power-
Ohio, Inc., Big Rivers Electric Corporation, Cincinnati Gas and
Electric Company, Central Illinois Public Service Company, Indiana
Municipal Power Agency, Hoosier Energy Rural Electric Cooperative,
Southern Indiana Gas and Electric Company, PSI Energy, Inc., Cinergy
Services, Inc., Ontario Power Generation, Inc., Soyland Power
Cooperative, Inc., Illinois Municipal Electric Agency, Louisville Gas
and Electric Company, Indianapolis Power & Light Company, Northern
Indiana Public Service Company, and the State public service
commissions in Illinois, Indiana, Michigan and Ohio.
Comment Date: 5 p.m. eastern time on May 4, 2005.
9. PJM Interconnection, L.L.C.
[Docket No. ER05-815-000]
Take notice that on April 13, 2005, PJM Interconnection, L.L.C.
(PJM) submitted for filing an executed interconnection service
agreement (ISA) among PJM, PSEG Nuclear LLC, Public Service Electric
and Gas Company and Atlantic City Electric Company, and a notice of
cancellation for an ISA that has been superseded. PJM requests an
effective date of March 14, 1005.
PJM states that copies of this filing were served upon the parties
to the agreement and the State regulatory commissions within the PJM
region.
Comment Date: 5 p.m. eastern time on May 4, 2005.
10. CES Marketing VI, LLC , CES Marketing VII, LLC, CES Marketing VIII,
LLC, CES Marketing IX, LLC, CES Marketing X, LLC
[Docket Nos. ER05-816-000, ER05-817-000, ER05-818-000, ER05-819-000,
and ER05-820-000]
Take notice that on April 13, 2005, CES Marketing VI, LLC, CES
Marketing VII, LLC, CES Marketing VIII, LLC, CES Marketing IX, LLC and
CES Marketing X, LLC (Applicants) submitted: (1) proposed rate
schedules under which Applicants will make wholesale sales of electric
energy, capacity, replacement reserves, and ancillary services at
market-based rates, to reassign transmission capacity, and to resell
firm transmission rights; (2) requests for the grant of certain blanket
approvals; (3) and requests for the grant of certain waivers.
Comment Date: 5 p.m. eastern time on May 4, 2005.
11. Pastoria Energy Facility, L.L.C.
[Docket No. ER05-822-000]
Take notice that on April 14, 2005, Pastoria Energy Facility,
L.L.C. (Pastoria) submitted: (1) Notification of a change in the name
of the company from Pastoria Energy Center, LLC to Pastoria Energy
Facility, L.L.C.; and (2) a revised market-based rate tariff to provide
the correct name of the company and to incorporate the reporting
requirements adopted by the Commission in Order No. 652, Reporting
Requirements for Changes in Status for Public Utilities with Market-
Based Rate Authority, 110 FERC ] 61,097 (2005).
Pastoria states that a copy of this filing has been mailed to each
person designated on the official service list compiled by the
Secretary of this proceeding.
Comment Date: 5 p.m. eastern time on May 5, 2005.
12. Florida Power & Light Company
[Docket No. ER05-823-000]
Take notice that on April 14, 2005, Florida Power & Light Company
(FPL) tendered for filing a Notice of Cancellation of Service Agreement
No. 196, an Interconnection & Operation Agreement between FPL and Blue
Heron Energy Center, LLC (Blue Heron). FPL states that the Cancellation
of Service Agreement No. 196 has been mutually agreed to by FPL and
Blue Heron. FPL requests that the cancellation be made effective March
21, 2005.
FPL states that a copy of the filing was served upon Blue Heron.
Comment Date: 5 p.m. eastern time on May 5, 2005.
13. American Electric Power Service Corporation
[Docket No. ER05-824-000]
Take notice that on April 14, 2004, American Electric Power Service
Corporation (AEPSC), tendered for filing a Interconnection and Local
Delivery Service Agreement (ILDSA) for Wabash Valley Power Association,
Inc. (Wabash Valley) of the Indianapolis, Indiana, and a Facilities
Agreement, as an attachment to the ILDSA, for the establishment of a
new Delivery Point (the Huntertown Delivery Point) between Wabash
Valley and AEP. The ILDSA is being designated and filed as Service
Agreement No. 1262 under the PJM Interconnection, LLC (PJM's) FERC Open
Access Transmission Tariff Sixth Revised Volume No. 1, pursuant to FERC
Order dated February 25, 2005 under Docket Nos. ER04-1003-002 et al.
and EL05-62-000. Service Agreement No. 1262 is needed to eliminate from
the Network Integration Transmission Service Agreement between AEP and
Wabash Valley those transmission related services that are now provided
by PJM. AEPSC requests an effective date of April 1, 2005.
AEPSC states that a copy of the filing was served upon Wabash
Valley and the Public Service Commissions affected by the filing.
Comment Date: 5 p.m. eastern time on May 5, 2005.
14. Midwest Independent Transmission System Operator, Inc.
[Docket No. ER05-825-000]
Take notice that on April 15, 2005, Midwest Independent
Transmission System Operator, Inc., (Midwest ISO) pursuant to section
205 of the Federal Power Act and section 35.13 of the Commission's
regulations, 18 CFR 35.13 (2002), submitted for filing revisions to
Exhibit A and Exhibit B of the Network Integration Transmission Service
Agreement under the Midwest ISO's Open Access Transmission Tariff, FERC
Electric Tariff, Second Revised Volume No. 1, between the City of St.
Louis, Michigan and the Midwest ISO.
Midwest ISO states that a copy of this filing has been served on
all parties on the official service list compiled by the Secretary in
this proceeding.
Comment Date: 5 p.m. eastern time on May 6, 2005.
15. Consolidated Edison Company of New York, Inc.
[Docket No. ER05-826-000]
Take notice that on April 15, 2005, Consolidated Edison Company of
New
[[Page 22025]]
York, Inc. (Con Edison) tendered for filing amendments to Con Edison's
Open Access Transmission Tariff, FERC Electric Tariff, First Revised
Volume No. 1. Con Edison states that the filing proposes to revise the
rate design for unbundled retail transmission service to customers that
own on-site electric generators. Con Edison requests an effective date
of June 14, 2005.
Comment Date: 5 p.m. eastern time on May 6, 2005.
16. Northeast Utilities Service Company
[Docket No. ER05-827-000]
Take notice that on April 15, 2005, Northeast Utilities Service
Company (NUSCO), on behalf of its operating company affiliates, The
Connecticut Light and Power Company (CL&P), Western Massachusetts
Electric Company (WMECO), Holyoke Water Power Company (HWP), Holyoke
Power and Electric Company (HP&E), and Public Service Company of New
Hampshire (PSNH), submitted a Notice of Cancellation of the Memorandum
of Understanding--Pooling of Generation and Transmission (NUG&T)
between CL&P, WMECO, HWP, and HP&E; Notice of Cancellation of the
Sharing Agreement between PSNH and CL&P; and Notice of Cancellation of
the Capacity Transfer Agreements between CL&P and PSNH.
NUSCO states that copies of the filing were served upon the NUSCO's
jurisdictional customers, Connecticut Department of Public Utility
Control, New Hampshire Public Utilities Commission, and Massachusetts
Department of Telecommunications and Energy.
Comment Date: 5 p.m. eastern time on May 6, 2005.
17. Northwestern Wisconsin Electric Company
[Docket No. ER05-828-000]
Take notice that April 15, 2005, Northwestern Wisconsin Electric
Company, (NWEC) tendered for filing proposed changes in its
Transmission Use Charge, Rate Schedule FERC No. 2. NWEC states that the
proposed changes would increase revenues from jurisdictional sales by
$4,409.20 based on the 12-month period ending April 30, 2005. NWEC also
states that it is proposing this rate schedule change to more
accurately reflect the actual cost of transmitting energy from one
utility to another based on current cost data. NWEC further states that
the service agreement for which this rate is calculated calls for the
Transmission Use Charge to be reviewed annually and revised on May 1.
NWEC requests an effective date of May 1, 2005.
NWEC states that copies of this filing have been provided to the
respective parties and to the Public Service Commission of Wisconsin.
Comment Date: 5 p.m. eastern time on May 6, 2005.
18. American Transmission Company LLC
[Docket No. ER05-829-000]
Take notice that on April 15, 2005, American Transmission Company
LLC (ATCLLC) tendered for filing a Distribution-Transmission
Interconnection Agreement between ATCLLC and Lodi Utilities. ATCLLC
requests an effective date of March 31, 2005.
ATCLLC states that it has served a copy of this filing on Lodi
Utilities, the Midwest ISO, and the Public Service Commission of
Wisconsin.
Comment Date: 5 p.m. eastern time on May 6, 2005.
19. Xcel Energy Services Inc.
[Docket No. ER05-830-000]
Take notice that on April 15, 2005, Xcel Energy Services Inc., on
behalf of Public Service Company of Colorado (PSCo), submitted an
Amended and Restated Generation Interconnection Agreement between Ridge
Crest Wind Partners, LLC and PSCo.
Comment Date: 5 p.m. eastern time on May 6, 2005.
20. East Texas Electric Cooperative, Inc.
[Docket No. ER05-831-000]
Take notice that on April 13, 2005, East Texas Electric
Cooperative, Inc. (ETEC) submitted for filing a withdrawal of its filed
rates, effective upon ETEC's April 13, 2005 receipt of Rural Utilities
Service guaranteed loan funds, ETEC will no longer meet the definition
of a ``public utility'' pursuant to section 201 of the Federal Power
Act, 16 U.S.C. 824 and thus will not be subject to regulation by the
Commission for so long as ETEC has RUS loan funds outstanding.
ETEC states that it has provided its three constituent members with
a copy of this filing.
Comment Date: 5 p.m. eastern time on May 4, 2005.
21. American Transmission Company LLC
[Docket No. ER05-833-000]
Take notice that on April 13, 2005, American Transmission Company
LLC (ATCLLC) tendered for filing an Amended and Restated Generation-
Transmission Interconnection Agreement among American Transmission
Company LLC, Wisconsin Electric Power Company, and the Midwest
Independent Transmission System Operator, Inc., (for the Elm Road
Generating Facility) Docket No. ER02-548-001. ATCLLC requests an
effective date of April 16, 2005.
Comment Date: 5 p.m. eastern time on May 4, 2005.
22. American Transmission Company LLC
[Docket No. ER05-834-000]
Take notice that on April 14, 2005, American Transmission Company
LLC (ATCLLC) tendered for filing an Amended and Restated Generation-
Transmission Interconnection Agreement among American Transmission
Company LLC, Wisconsin Electric Power Company, and the Midwest
Independent Transmission System Operator, Inc., (for Port Washington
Generating Facility) Docket No. ER02-548-001. ATCLLC requests an
effective date of April 17, 2005.
Comment Date: 5 p.m. eastern time on May 5, 2005.
Standard Paragraph
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant and all parties to this proceeding.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
[[Page 22026]]
(866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-2039 Filed 4-27-05; 8:45 am]