186.13 tons/day. On January 12, 2005,
the availability of these budgets was
posted on EPA’s Web site for the
purpose of soliciting public comments.
The comment period closed on February
11, 2005, and we received no comments.
Today’s notice is simply an
announcement of a finding that we have
already made. EPA Region 6 sent a letter
to the Texas Commission on
Environmental Quality on March 23,
2005, finding that the motor vehicle
emissions budgets in the HoustonGalveston-Brazoria 8-county ozone
nonattainment area are adequate and
must be used for transportation
conformity determinations.
Transportation conformity is required
by section 176(c) of the Clean Air Act.
EPA’s conformity rule, 40 CFR part 93,
requires that transportation plans,
programs and projects conform to SIPs
and establishes the criteria and
procedures for determining whether or
not they do so. Conformity to a SIP
means that transportation activities will
not produce new air quality violations,
worsen existing violations, or delay
timely attainment of the National
Ambient Air Quality Standards. The
criteria by which EPA determines
whether a SIP’s motor vehicle emission
budgets are adequate for conformity
purposes are outlined in 40 CFR
93.118(e)(4). Please note that such an
adequacy review is separate from EPA’s
completeness review, and it should not
be used to prejudge EPA’s ultimate
approval of the SIP. Even if we find a
budget adequate, the SIP could later be
disapproved.
Authority: 42 U.S.C. 7401 et seq.
Dated: April 14, 2005.
Richard E. Greene,
Regional Administrator, Region 6.
[FR Doc. 05–8122 Filed 4–21–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6662–6]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental
Impact Statements filed April 14, 2005,
through April 15, 2005, pursuant to 40
CFR 1506.9.
EIS No. 20050152, Final EIS, AFS, MT,
Snow Talon Fire Salvage Project,
Proposes to Salvage Harvest Trees
Burned in the Fire, Helena National
VerDate jul<14>2003
15:27 Apr 21, 2005
Jkt 205001
Forest, Lincoln Ranger District, Lewis
and Clark County, MT, Wait Period
Ends: 05/23/2005, Contact: Dan
Seifert 406–362–4265.
EIS No. 20050153, Final EIS, FHW, UT,
Southern Corridor Construction, I–15
at Reference Post 2 in St. George to
UT–9 near Hurricane, Funding, Rightof-Way Grant and U.S. Army COE
Section 404 Permit Issuance, St.
George, Washington and Hurricane,
Washington County, UT, Wait Period
Ends: 05/23/2005, Contact: Gregory
Punske 801–963–0182.
EIS No. 20050154, Draft EIS, COE, DC,
Washington Aqueduct’s Project,
Proposed Waster Treatment Residuals
Management Process, NPDES Permit,
Dalecarlia and McMillan Water
Treatment Plants, Potomac River,
Washington, DC, Comment Period
Ends: 06/06/2005, Contact: Michael
Peterson 202–764–0025.
EIS No. 20050155, Final EIS, AFS, OR,
Plentybob Ecosystem Restoration
Project, Restoration Activities
Include: Prescribed Fire, Timber
Harvest, Road Obliteration, Hardwood
Planting and Noxious Weed
Treatment, Implementation, Walla
Walla Ranger District, Umatilla
National Forest, Umatilla County, OR,
Wait Period Ends: 05/23/2005,
Contact: Glen Westlund 509–522–
6009.
EIS No. 20050156, Final EIS, IBR, CA,
Folsom Dam Road Access Restriction
Project, Control Access to Folsom
Dam, City of Folsom, CA, Wait Period
Ends: 05/23/2005, Contact: Robert
Schroeder 916–989–7274.
EIS No. 20050157, Draft EIS, AFS, MT,
Middle East Fork Hazardous Fuel
Reduction Project, Implementation of
Three Alternatives, Bitterroot
National Forest, Sula Ranger District,
Ravalli County, MT, Comment Period
Ends: 06/06/2005, Contact: Tracy
Hollingshead 406–821–3201.
EIS No. 20050158, Draft EIS, AFS, ID,
Aspen Range Timber Sale and
Vegetation Treatment Project,
Proposal to Treat Forested and
Nonforested Vegetation, CaribouTarghee National Forest, Soda Springs
Ranger District, Caribou County, ID,
Comment Period Ends: 06/06/2005,
Contact: Doug Heyrend 208–547–
4356.
EIS No. 20050159, Final EIS, NIH, MD,
National Institutes of Health (NIH)
Master Plan 2003 Update, National
Institutes of Health Main Campus—
Bethesda, MD, Montgomery County,
MD, Wait Period Ends: 05/23/2005,
Contact: Ron Wilson 301–496–5037.
EIS No. 20050160, Draft EIS, AFS, ID,
Three Basins Timber Sale Project,
Proposal to Treat 760 Acres of Mature
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
Forest, Implementation, CaribouTarghee National Forest, Montpellier
Ranger District, Bearlake and Caribou
Counties, ID, Comment Period Ends:
06/06/2005, Contact: Ken Klingenberg
208–847–0375.
EIS No. 20050161, Final EIS, AFS, OR,
Rogue River-Siskiyou National Forest,
Special Use Permits for Outfitter and
Guide Operations on the Lower Rogue
and Lower Rogue and Lower Illinois
Rivers, Gold Beach Ranger District,
Rogue River-Siskiyou National Forest,
Curry County, OR, Wait Period Ends:
05/23/2005, John Borton 541–247–
3640.
EIS No. 20050162, Draft EIS, CGD, 00,
Pearl Crossing Liquefied Natural Gas
(LNG) Deepwater Port Terminal and
Pipeline Project, Proposes to
Construct a Liquefied Natural Gas
(LNG) Receiving, Storage, and
Regasification Facility, Gulf of
Mexico, Cameron and Calcasieu
Parishes, LA and San Patricio County,
TX, Comment Period Ends: 06/07/
2005, Contact: Lt. Ken Kusano 202–
267–1184.
EIS No. 20050163, Draft Supplement,
STB, SD, Powder River Basin
Expansion Project, New Information
on SEA’s Independent Analyses Four
Issues Remanded by the ‘‘8’’ Circuit
Court of Appeals, Finance Docket No.
33407—Dakota, Minnesota, Eastern
Railroad, SD, WY and MN, Due: 06/
06/2005, Contact: Victoria Rutson
202–565–1545.
EIS No. 20050164, Final EIS, FRC, TX,
Vista del Sol Liquefied Natural Gas
(LNG) Terminal Project, Construct,
Install and Operate and LNG Terminal
and Natural Gas Pipeline Facilities,
Vista del Sol LNG Terminal LP and
Vista del Sol Pipeline LP, TX, Wait
Period Ends: 05/23/2005, Contact:
Joyce Turner 202–502–8584.
Dated: April 20, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 05–8114 Filed 4–21–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6662–7]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
E:\FR\FM\22APN1.SGM
22APN1
Agencies
[Federal Register Volume 70, Number 77 (Friday, April 22, 2005)]
[Notices]
[Page 20900]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-8114]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6662-6]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements filed April 14,
2005, through April 15, 2005, pursuant to 40 CFR 1506.9.
EIS No. 20050152, Final EIS, AFS, MT, Snow Talon Fire Salvage Project,
Proposes to Salvage Harvest Trees Burned in the Fire, Helena National
Forest, Lincoln Ranger District, Lewis and Clark County, MT, Wait
Period Ends: 05/23/2005, Contact: Dan Seifert 406-362-4265.
EIS No. 20050153, Final EIS, FHW, UT, Southern Corridor Construction,
I-15 at Reference Post 2 in St. George to UT-9 near Hurricane, Funding,
Right-of-Way Grant and U.S. Army COE Section 404 Permit Issuance, St.
George, Washington and Hurricane, Washington County, UT, Wait Period
Ends: 05/23/2005, Contact: Gregory Punske 801-963-0182.
EIS No. 20050154, Draft EIS, COE, DC, Washington Aqueduct's Project,
Proposed Waster Treatment Residuals Management Process, NPDES Permit,
Dalecarlia and McMillan Water Treatment Plants, Potomac River,
Washington, DC, Comment Period Ends: 06/06/2005, Contact: Michael
Peterson 202-764-0025.
EIS No. 20050155, Final EIS, AFS, OR, Plentybob Ecosystem Restoration
Project, Restoration Activities Include: Prescribed Fire, Timber
Harvest, Road Obliteration, Hardwood Planting and Noxious Weed
Treatment, Implementation, Walla Walla Ranger District, Umatilla
National Forest, Umatilla County, OR, Wait Period Ends: 05/23/2005,
Contact: Glen Westlund 509-522-6009.
EIS No. 20050156, Final EIS, IBR, CA, Folsom Dam Road Access
Restriction Project, Control Access to Folsom Dam, City of Folsom, CA,
Wait Period Ends: 05/23/2005, Contact: Robert Schroeder 916-989-7274.
EIS No. 20050157, Draft EIS, AFS, MT, Middle East Fork Hazardous Fuel
Reduction Project, Implementation of Three Alternatives, Bitterroot
National Forest, Sula Ranger District, Ravalli County, MT, Comment
Period Ends: 06/06/2005, Contact: Tracy Hollingshead 406-821-3201.
EIS No. 20050158, Draft EIS, AFS, ID, Aspen Range Timber Sale and
Vegetation Treatment Project, Proposal to Treat Forested and
Nonforested Vegetation, Caribou-Targhee National Forest, Soda Springs
Ranger District, Caribou County, ID, Comment Period Ends: 06/06/2005,
Contact: Doug Heyrend 208-547-4356.
EIS No. 20050159, Final EIS, NIH, MD, National Institutes of Health
(NIH) Master Plan 2003 Update, National Institutes of Health Main
Campus--Bethesda, MD, Montgomery County, MD, Wait Period Ends: 05/23/
2005, Contact: Ron Wilson 301-496-5037.
EIS No. 20050160, Draft EIS, AFS, ID, Three Basins Timber Sale Project,
Proposal to Treat 760 Acres of Mature Forest, Implementation, Caribou-
Targhee National Forest, Montpellier Ranger District, Bearlake and
Caribou Counties, ID, Comment Period Ends: 06/06/2005, Contact: Ken
Klingenberg 208-847-0375.
EIS No. 20050161, Final EIS, AFS, OR, Rogue River-Siskiyou National
Forest, Special Use Permits for Outfitter and Guide Operations on the
Lower Rogue and Lower Rogue and Lower Illinois Rivers, Gold Beach
Ranger District, Rogue River-Siskiyou National Forest, Curry County,
OR, Wait Period Ends: 05/23/2005, John Borton 541-247-3640.
EIS No. 20050162, Draft EIS, CGD, 00, Pearl Crossing Liquefied Natural
Gas (LNG) Deepwater Port Terminal and Pipeline Project, Proposes to
Construct a Liquefied Natural Gas (LNG) Receiving, Storage, and
Regasification Facility, Gulf of Mexico, Cameron and Calcasieu
Parishes, LA and San Patricio County, TX, Comment Period Ends: 06/07/
2005, Contact: Lt. Ken Kusano 202-267-1184.
EIS No. 20050163, Draft Supplement, STB, SD, Powder River Basin
Expansion Project, New Information on SEA's Independent Analyses Four
Issues Remanded by the ``8'' Circuit Court of Appeals, Finance Docket
No. 33407--Dakota, Minnesota, Eastern Railroad, SD, WY and MN, Due: 06/
06/2005, Contact: Victoria Rutson 202-565-1545.
EIS No. 20050164, Final EIS, FRC, TX, Vista del Sol Liquefied Natural
Gas (LNG) Terminal Project, Construct, Install and Operate and LNG
Terminal and Natural Gas Pipeline Facilities, Vista del Sol LNG
Terminal LP and Vista del Sol Pipeline LP, TX, Wait Period Ends: 05/23/
2005, Contact: Joyce Turner 202-502-8584.
Dated: April 20, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 05-8114 Filed 4-21-05; 8:45 am]