Notice of Intent To File Application for Subsequent License, 20369 [E5-1824]
Download as PDF
Federal Register / Vol. 70, No. 74 / Tuesday, April 19, 2005 / Notices
Old Dominion also requests waiver
from the Commission’s competitive
bidding and negotiated placement
requirements at 18 CFR 34.2.
Comment Date: 5 p.m. eastern time on
May 3, 2005.
Standard Paragraph
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all parties to this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on–line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–1845 Filed 4–18–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Intent To File Application for
Subsequent License
April 11, 2005.
Take notice that the following notice
of intent has been filed with the
Commission and is available for public
inspection:
VerDate jul<14>2003
15:12 Apr 18, 2005
Jkt 205001
a. Type of filing: Notice of Intent To
File Application for a Subsequent
License.
b. Project No: 733–000.
c. Date filed: April 4, 2005.
d. Submitted by: Eric R. Jacobson.
e. Name of Project: Ouray Project.
f. Location: The project is located on
the Uncompahgre River in Ouray
County, Colorado. The project occupies
4.38 acres of U.S. Forest Service lands.
g. Filed Pursuant to: 18 CFR 16.6.
h. Effective date of current license:
January 1, 1980.
i. Expiration date of current license:
April 12, 2010.
j. Project Description: The project
consists of the following existing
facilities: (1) A 1.06-acre reservoir; (2) a
70-foot-long masonry, gravity dam with
a maximum height of 72 feet, a 51-footlong non-overflow section and a 19-footwide spillway; (3) a 6,130-foot-long
pipeline; (4) a powerhouse containing
three generating units with a total
authorized capacity of 632 kilowatts;
and (5) appurtenant facilities.
k. Pursuant to 18 CFR 16.7,
information on the project is available
from Eric R. Jacobson, Ouray Hydro
Plant, 303 Oak Street, Ouray, CO 81427;
(970) 729–0034.
l. FERC Contact: Steve Hocking at 888
First Street NE., Washington, DC 20426;
(202) 502–8753 or
steve.hocking@ferc.gov.
m. The licensee states its unequivocal
intent to submit an application for a
subsequent license for Project No. 733.
Pursuant to 18 CFR 16.8, 16.9, and
16.10, each application for a license and
any competing license applications
must be filed with the Commission at
least 24 months prior to the expiration
of the existing license. All applications
for license for this project must be filed
by April 12, 2008.
n. A copy of this filing is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or TTY (202)
502–8659. A copy is also available for
inspection and reproduction at the
address in item k above.
o. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
20369
Support as shown in the paragraph
above.
p. By this notice, the Commission is
seeking corrections and updates to the
attached mailing list for the Ouray
Project. Updates should be filed with
Magalie R. Salas, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
Magalie R. Salas,
Secretary.
[FR Doc. E5–1824 Filed 4–18–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Amendment
of License and Soliciting Comments,
Motions To Intervene, and Protests
April 11, 2005.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Amendment of
License.
b. Project No: 2004–176.
c. Date filed: March 23, 2005.
d. Applicant: City of Holyoke Gas &
Electric Company.
e. Name of Project: Holyoke
Hydroelectric Project.
f. Location: The project is located on
the Connecticut River, in Hampden,
Hampshire, and Franklin Counties,
Massachusetts.
g. Filed Pursuant to: License Article
418; Federal Power Act, 16 U.S.C.
791(a)–825(r).
h. Applicant Contact: Paul Ducheney,
66 Suffolk St., Holyoke, MA 01040,
(413) 536–9340.
i. FERC Contact: Any questions on
this notice should be addressed to
Hillary Berlin at (202) 502–8915, or email address: hillary.berlin@frec.gov.
j. Deadline for filing comments and or
motions: May 9, 2005.
All documents (original and eight
copies) should be filed with: Ms.
Magalie R. Salas, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
Please include the project number (P–
2004–176) on any comments or motions
filed. Comments, protests, and
interventions may be filed electronically
via the internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages efilings.
E:\FR\FM\19APN1.SGM
19APN1
Agencies
[Federal Register Volume 70, Number 74 (Tuesday, April 19, 2005)]
[Notices]
[Page 20369]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-1824]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Intent To File Application for Subsequent License
April 11, 2005.
Take notice that the following notice of intent has been filed with
the Commission and is available for public inspection:
a. Type of filing: Notice of Intent To File Application for a
Subsequent License.
b. Project No: 733-000.
c. Date filed: April 4, 2005.
d. Submitted by: Eric R. Jacobson.
e. Name of Project: Ouray Project.
f. Location: The project is located on the Uncompahgre River in
Ouray County, Colorado. The project occupies 4.38 acres of U.S. Forest
Service lands.
g. Filed Pursuant to: 18 CFR 16.6.
h. Effective date of current license: January 1, 1980.
i. Expiration date of current license: April 12, 2010.
j. Project Description: The project consists of the following
existing facilities: (1) A 1.06-acre reservoir; (2) a 70-foot-long
masonry, gravity dam with a maximum height of 72 feet, a 51-foot-long
non-overflow section and a 19-foot-wide spillway; (3) a 6,130-foot-long
pipeline; (4) a powerhouse containing three generating units with a
total authorized capacity of 632 kilowatts; and (5) appurtenant
facilities.
k. Pursuant to 18 CFR 16.7, information on the project is available
from Eric R. Jacobson, Ouray Hydro Plant, 303 Oak Street, Ouray, CO
81427; (970) 729-0034.
l. FERC Contact: Steve Hocking at 888 First Street NE., Washington,
DC 20426; (202) 502-8753 or steve.hocking@ferc.gov.
m. The licensee states its unequivocal intent to submit an
application for a subsequent license for Project No. 733. Pursuant to
18 CFR 16.8, 16.9, and 16.10, each application for a license and any
competing license applications must be filed with the Commission at
least 24 months prior to the expiration of the existing license. All
applications for license for this project must be filed by April 12,
2008.
n. A copy of this filing is available for review at the Commission
in the Public Reference Room or may be viewed on the Commission's Web
site at https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document. For assistance, contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3676,
or TTY (202) 502-8659. A copy is also available for inspection and
reproduction at the address in item k above.
o. Register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support as shown in the paragraph above.
p. By this notice, the Commission is seeking corrections and
updates to the attached mailing list for the Ouray Project. Updates
should be filed with Magalie R. Salas, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426.
Magalie R. Salas,
Secretary.
[FR Doc. E5-1824 Filed 4-18-05; 8:45 am]
BILLING CODE 6717-01-P