Notice of Intent To File Application for Subsequent License, 20369 [E5-1824]

Download as PDF Federal Register / Vol. 70, No. 74 / Tuesday, April 19, 2005 / Notices Old Dominion also requests waiver from the Commission’s competitive bidding and negotiated placement requirements at 18 CFR 34.2. Comment Date: 5 p.m. eastern time on May 3, 2005. Standard Paragraph Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all parties to this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on–line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Linda Mitry, Deputy Secretary. [FR Doc. E5–1845 Filed 4–18–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Intent To File Application for Subsequent License April 11, 2005. Take notice that the following notice of intent has been filed with the Commission and is available for public inspection: VerDate jul<14>2003 15:12 Apr 18, 2005 Jkt 205001 a. Type of filing: Notice of Intent To File Application for a Subsequent License. b. Project No: 733–000. c. Date filed: April 4, 2005. d. Submitted by: Eric R. Jacobson. e. Name of Project: Ouray Project. f. Location: The project is located on the Uncompahgre River in Ouray County, Colorado. The project occupies 4.38 acres of U.S. Forest Service lands. g. Filed Pursuant to: 18 CFR 16.6. h. Effective date of current license: January 1, 1980. i. Expiration date of current license: April 12, 2010. j. Project Description: The project consists of the following existing facilities: (1) A 1.06-acre reservoir; (2) a 70-foot-long masonry, gravity dam with a maximum height of 72 feet, a 51-footlong non-overflow section and a 19-footwide spillway; (3) a 6,130-foot-long pipeline; (4) a powerhouse containing three generating units with a total authorized capacity of 632 kilowatts; and (5) appurtenant facilities. k. Pursuant to 18 CFR 16.7, information on the project is available from Eric R. Jacobson, Ouray Hydro Plant, 303 Oak Street, Ouray, CO 81427; (970) 729–0034. l. FERC Contact: Steve Hocking at 888 First Street NE., Washington, DC 20426; (202) 502–8753 or steve.hocking@ferc.gov. m. The licensee states its unequivocal intent to submit an application for a subsequent license for Project No. 733. Pursuant to 18 CFR 16.8, 16.9, and 16.10, each application for a license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by April 12, 2008. n. A copy of this filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or TTY (202) 502–8659. A copy is also available for inspection and reproduction at the address in item k above. o. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 20369 Support as shown in the paragraph above. p. By this notice, the Commission is seeking corrections and updates to the attached mailing list for the Ouray Project. Updates should be filed with Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Magalie R. Salas, Secretary. [FR Doc. E5–1824 Filed 4–18–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests April 11, 2005. Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Amendment of License. b. Project No: 2004–176. c. Date filed: March 23, 2005. d. Applicant: City of Holyoke Gas & Electric Company. e. Name of Project: Holyoke Hydroelectric Project. f. Location: The project is located on the Connecticut River, in Hampden, Hampshire, and Franklin Counties, Massachusetts. g. Filed Pursuant to: License Article 418; Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Paul Ducheney, 66 Suffolk St., Holyoke, MA 01040, (413) 536–9340. i. FERC Contact: Any questions on this notice should be addressed to Hillary Berlin at (202) 502–8915, or email address: hillary.berlin@frec.gov. j. Deadline for filing comments and or motions: May 9, 2005. All documents (original and eight copies) should be filed with: Ms. Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Please include the project number (P– 2004–176) on any comments or motions filed. Comments, protests, and interventions may be filed electronically via the internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages efilings. E:\FR\FM\19APN1.SGM 19APN1

Agencies

[Federal Register Volume 70, Number 74 (Tuesday, April 19, 2005)]
[Notices]
[Page 20369]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-1824]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Intent To File Application for Subsequent License

April 11, 2005.
    Take notice that the following notice of intent has been filed with 
the Commission and is available for public inspection:
    a. Type of filing: Notice of Intent To File Application for a 
Subsequent License.
    b. Project No: 733-000.
    c. Date filed: April 4, 2005.
    d. Submitted by: Eric R. Jacobson.
    e. Name of Project: Ouray Project.
    f. Location: The project is located on the Uncompahgre River in 
Ouray County, Colorado. The project occupies 4.38 acres of U.S. Forest 
Service lands.
    g. Filed Pursuant to: 18 CFR 16.6.
    h. Effective date of current license: January 1, 1980.
    i. Expiration date of current license: April 12, 2010.
    j. Project Description: The project consists of the following 
existing facilities: (1) A 1.06-acre reservoir; (2) a 70-foot-long 
masonry, gravity dam with a maximum height of 72 feet, a 51-foot-long 
non-overflow section and a 19-foot-wide spillway; (3) a 6,130-foot-long 
pipeline; (4) a powerhouse containing three generating units with a 
total authorized capacity of 632 kilowatts; and (5) appurtenant 
facilities.
    k. Pursuant to 18 CFR 16.7, information on the project is available 
from Eric R. Jacobson, Ouray Hydro Plant, 303 Oak Street, Ouray, CO 
81427; (970) 729-0034.
    l. FERC Contact: Steve Hocking at 888 First Street NE., Washington, 
DC 20426; (202) 502-8753 or steve.hocking@ferc.gov.
    m. The licensee states its unequivocal intent to submit an 
application for a subsequent license for Project No. 733. Pursuant to 
18 CFR 16.8, 16.9, and 16.10, each application for a license and any 
competing license applications must be filed with the Commission at 
least 24 months prior to the expiration of the existing license. All 
applications for license for this project must be filed by April 12, 
2008.
    n. A copy of this filing is available for review at the Commission 
in the Public Reference Room or may be viewed on the Commission's Web 
site at https://www.ferc.gov using the ``eLibrary'' link. Enter the 
docket number excluding the last three digits in the docket number 
field to access the document. For assistance, contact FERC Online 
Support at FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3676, 
or TTY (202) 502-8659. A copy is also available for inspection and 
reproduction at the address in item k above.
    o. Register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and 
issuances related to this or other pending projects. For assistance, 
contact FERC Online Support as shown in the paragraph above.
    p. By this notice, the Commission is seeking corrections and 
updates to the attached mailing list for the Ouray Project. Updates 
should be filed with Magalie R. Salas, Secretary, Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426.

Magalie R. Salas,
Secretary.
[FR Doc. E5-1824 Filed 4-18-05; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.