Download as PDF 20364 Federal Register / Vol. 70, No. 74 / Tuesday, April 19, 2005 / Notices the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. Persons who wish to comment only on the environmental review of this project, or in support of or in opposition to this project, should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the applicant. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov) under the ‘‘e-Filing’’ link. Comment Date: 5 p.m. eastern time on May 2, 2005. Magalie R. Salas, Secretary. [FR Doc. E5–1829 Filed 4–18–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP05–99–000] Gulf South Pipeline Company, LP; Notice of Application April 13, 2005. Take notice that on March 30, 2005, Gulf South Pipeline Company, LP, 20 East Greenway, Houston, Texas 77046, filed in the above referenced docket, an application pursuant to Section 7(b) of VerDate jul<14>2003 15:12 Apr 18, 2005 Jkt 205001 the Natural Gas Act (NGA), requesting permission and approval to abandon, in place, the Lafayette Compressor Station in Lafayette Parish, Louisiana, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the Web at https://www.ferc.gov using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Specifically, Gulf South explains that the facilities to be abandoned in place, include four 1,100 horsepower reciprocating compressors, the main compressor building, the suction and discharge piping and associated valves, the fin fan coolers and building, the jacket water cooling system (rainwater tanks and facilities), the generator building, the water treatment system and building, the gas cooling and dehydration systems and buildings, and other related plant piping and minor associated structures. Gulf South asserts that the abandonment is necessitated by a change in natural gas markets served by Gulf South in southeast Louisiana and that the proposed abandonment will have no effect on the capacity and services currently provided by Gulf South. Any questions regarding this application should be directed to J. Kyle Stephens, Director of Certificates, Gulf South Pipeline Company, LP, 20 East Greenway Plaza, Houston, Texas 77046, phone (713) 544–7309. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 proceeding can ask for court review of Commission orders in the proceeding. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov) under the ‘‘e-Filing’’ link. Comment Date: May 4, 2005. Linda Mitry, Deputy Secretary. [FR Doc. E5–1830 Filed 4–18–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP05–266–000] Northern Natural Gas Company; Notice of Tariff Filing April 12, 2005. Take notice that on April 4, 2005, Northern Natural Gas Company (Northern) tendered for filing as part of its FERC Gas Tariff, Fifth Revised Volume No. 1, the following tariff sheets, with an effective date of May 5, 2005: Eighth Revised Sheet No. 101 Third Revised Sheet No. 102 Fourth Revised Sheet No. 116 Fourth Revised Sheet No. 117 Second Revised Sheet No. 308 Northern states that the filing is being filed to incorporate a full requirements option into Rate Schedule TF and Rate Schedule TFX. Northern states that copies of the filing have been mailed to each of its customers and interested State Commissions. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or E:\FR\FM\19APN1.SGM 19APN1 Federal Register / Vol. 70, No. 74 / Tuesday, April 19, 2005 / Notices protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E5–1819 Filed 4–18–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2181–000] Northern States Power Company; Notice of Authorization for Continued Project Operation April 12, 2005. On February 10, 2003, Northern States Power Company, licensee for the Menomonie Project No. 2181, filed an application for a new or subsequent license pursuant to the Federal Power Act (FPA) and the Commission’s regulations thereunder. Project No. 2181 is located on the Red Cedar River in Dunn County, Wisconsin. The license for Project No. 2181 was issued for a period ending March 31, 2005. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year to year an annual license to the then licensee under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. VerDate jul<14>2003 15:12 Apr 18, 2005 Jkt 205001 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 2181 is issued to Northern States Power Company for a period effective April 1, 2005 through March 31, 2006, or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before April 1, 2006, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that Northern States Power Company is authorized to continue operation of the Menomonie Project No. 2181 until such time as the Commission acts on its application for subsequent license. Magalie R. Salas, Secretary. [FR Doc. E5–1823 Filed 4–18–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2697–000] Northern States Power Company; Notice of Authorization for Continued Project Operation April 11, 2005. On February 10, 2003, Northern States Power Company, licensee for the Cedar Falls Project No. 2697, filed an application for a new or subsequent license pursuant to the Federal Power Act (FPA) and the Commission’s regulations thereunder. Project No. 2697 is located on the Red Cedar River in Dunn County, Wisconsin. PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 20365 The license for Project No. 2697 was issued for a period ending March 31, 2005. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year to year an annual license to the then licensee under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 2697 is issued to Northern States Power Company for a period effective April 1, 2005 through March 31, 2006, or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before April 1, 2006, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that Northern States Power Company is authorized to continue operation of the Cedar Falls Project No. 2697 until such time as the Commission acts on its application for subsequent license. Magalie R. Salas, Secretary. [FR Doc. E5–1828 Filed 4–18–05; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\19APN1.SGM 19APN1

Agencies

[Federal Register Volume 70, Number 74 (Tuesday, April 19, 2005)]
[Notices]
[Pages 20364-20365]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-1819]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RP05-266-000]


Northern Natural Gas Company; Notice of Tariff Filing

April 12, 2005.
    Take notice that on April 4, 2005, Northern Natural Gas Company 
(Northern) tendered for filing as part of its FERC Gas Tariff, Fifth 
Revised Volume No. 1, the following tariff sheets, with an effective 
date of May 5, 2005:

Eighth Revised Sheet No. 101
Third Revised Sheet No. 102
Fourth Revised Sheet No. 116
Fourth Revised Sheet No. 117
Second Revised Sheet No. 308

    Northern states that the filing is being filed to incorporate a 
full requirements option into Rate Schedule TF and Rate Schedule TFX.
    Northern states that copies of the filing have been mailed to each 
of its customers and interested State Commissions.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed in accordance with the provisions of 
Section 154.210 of the Commission's regulations (18 CFR 154.210). 
Anyone filing an intervention or protest must serve a copy of that 
document on the Applicant. Anyone filing an intervention or protest on 
or before the intervention or protest date need not serve motions to 
intervene or

[[Page 20365]]

protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Magalie R. Salas,
Secretary.
[FR Doc. E5-1819 Filed 4-18-05; 8:45 am]
BILLING CODE 6717-01-P