Morgan Stanley Capital Group Inc., et al.; Electric Rate and Corporate Filings, 20118-20119 [E5-1806]

Download as PDF 20118 Federal Register / Vol. 70, No. 73 / Monday, April 18, 2005 / Notices Morgan Stanley Capital Group Inc., et al.; Electric Rate and Corporate Filings revisions to its FERC Electric Tariff Fifth Revised Volume No. 9 in compliance with the Commission’s order issued March 3, 2005 in Docket No. ER99– 1435–003, et al., 110 FERC ¶ 61,216 (2005). Comment Date: 5 p.m. eastern time on April 25, 2005. April 11, 2005. 5. Avista Turbine Power, Inc. The following filings have been made with the Commission. The filings are listed in ascending order within each docket classification. [Docket No. ER00–1814–006] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EC05–66–000, et al.] 1. Morgan Stanley Capital Group Inc., South Eastern Electric Development Corporation, South Eastern Generating Corporation [Docket No. EC05–66–000] Take notice that on April 6, 2005, Morgan Stanley Capital Group Inc. (MSCG), South Eastern Electric Development Corporation (SEEDCO), and South Eastern Generating Corporation (SEGCO) (collectively, Applicants) submitted an application pursuant to section 203 of the Federal Power Act for authorization for MSCG’s acquisition from a third-party of securities in each of SEEDCO and SEGCO. The Applicants have requested privileged treatment of certain information and documentation submitted with the application. Comment Date: 5 p.m. eastern time on April 27, 2005. 2. Avista Energy, Inc. [Docket No. ER96–2408–023] Take notice that on April 4, 2005, Avista Energy, Inc., submitted proposed revisions to its First Revised Rate Schedule FERC No. 1 in compliance with the Commission’s order issued March 3, 2005 in Docket No. ER99– 1435–003, et al., 110 FERC ¶ 61,216 (2005). Comment Date: 5 p.m. eastern time on April 25, 2005. 3. Spokane Energy, LLC [Docket No. ER98–4336–012] Take notice that on April 4, 2005, Spokane Energy, LLC submitted proposed revisions to its First Revised Rate Schedule FERC No. 1 in compliance with the Commission’s order issued March 3, 2005 in Docket No. ER99–1435–003, et al., 110 FERC ¶ 61,216 (2005). Comment Date: 5 p.m. eastern time on April 25, 2005. 4. Avista Corporation [Docket No. ER99–1435–011] Take notice that on April 4, 2005, Avista Corporation submitted proposed VerDate jul<14>2003 16:08 Apr 15, 2005 Jkt 205001 Take notice that on April 4, 2005, Avista Turbine Power, Inc. submitted proposed revisions to its First Revised Rate Schedule No. 1 in compliance with the Commission’s order issued March 3, 2005 in Docket No. ER99–1435–003, et al., 110 FERC ¶ 61,216 (2005). Comment Date: 5 p.m. eastern time on April 25, 2005. 6. PJM Interconnection, L.L.C.; Virginia Electric and Power Company [Docket No. ER04–829–005] Take notice that on April 4, 2005, Virginia Electric and Power Company tender for filing changes to the PJM South Transmission Owner Agreement in compliance with the Commission’s order issued March 4, 2005, 110 FERC ¶ 61,234 (2005). Comment Date: 5 p.m. eastern time on April 25, 2005. 7. Midwest Independent Transmission System Operator, Inc. [Docket No. ER05–215–002] Take notice that on April 4, 2005, the Midwest Independent Transmission System Operator, Inc. (Midwest ISO) submitted an unexecuted Interconnection Agreement between the Midwest ISO, Prairie State Generation Company, LLC and Illinois Power Company. The Midwest ISO states that the filing was served on the parties to the Interconnection Agreement. Comment Date: 5 p.m. eastern time on April 25, 2005. 8. Arroyo Energy LP; Mohawk River Funding IV, L.L.C.; Utility Contract Funding, L.L.C.; Thermo Cogeneration Partnership, L.P.; Cedar Brakes I, L.L.C.; Cedar Brakes II, L.L.C. [Docket Nos. ER05–375–001, ER02–1582– 002, ER02–2102–003, ER02–1785–002, ER00–2885–004, ER01–2765–003] Take notice that on April 4, 2005, Arroyo Energy LP, Mohawk River Funding IV, L.L.C., Utility Contract Funding, L.L.C., Thermo Cogeneration Partnership, L.P., Cedar Brakes I, L.L.C. and Cedar Brakes II, L.L.C. (collectively, the Filing Entities) filed a Notification of Change of Status notifying the Commission that each of the Filing PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 Entities had become affiliated with, or that there were applications pending that would result in them being affiliated with, entities that sell energy an/or capacity in wholesale electricity markets. The Filing Entities state that copies of the filing were served on the parties on the official service list in these proceedings. Comment Date: 5 p.m. eastern time on April 25, 2005. 9. El Paso Electric Company [Docket No. ER05–427–001] Take notice that on April 4, 2005, El Paso Electric Company (EPE) submitted a compliance filing pursuant to the Commission’s letter order issued March 4, 2005 in Docket No. ER05–427–000. Comment Date: 5 p.m. eastern time on April 25, 2005. 10. Niagara Mohawk Power Corporation [Docket No. ER05–775–000] Take notice that on April 4, 2005, Niagara Mohawk Power Corporation, a National Grid company (Niagara Mohawk), submitted Notices of Cancellation for the following service agreements under Niagara Mohawk’s FERC Electric Tariff, Volume No. 3: Service Agreement Nos. 1 through 28 (inclusive), 30, 31, 32, 34, 35, 37, 38, 39, 59, 64, 65, 72, 78, 79, 80, 86, 90, 96, 101, 124, 125, 126, 128, 131, 134, 143, 145, 148, 150, 152, 162, 163, 167, 173, 182, 184, 188, 190, 194, 201, 206, 212, and 222. Niagara Mohawk states that these service agreements should be cancelled because they have terminated by their own terms and the parties to the agreements no longer take service from Niagara Mohawk. Niagara Mohawk states that a copy of this filing has been served upon the parties to the various agreements, New York Independent System Operator, and the New York State utility commission. Comment Date: 5 p.m. eastern time on April 25, 2005. 11. Florida Keys Electric Cooperative Association, Inc. [Docket No. ER05–776–000] Take notice that on April 4, 2005, Florida Keys Electric Cooperative Association, Inc. (FKEC) tendered for filing a revised rate for non-firm transmission service provided to Keys Energy Services, Key West, Florida (KES) in accordance with the terms and conditions of the Long-Term Joint Investment Transmission Agreement between KFEC and KES. FKEC states that the filing has been served on KES and the Florida Public Service Commission. E:\FR\FM\18APN1.SGM 18APN1 Federal Register / Vol. 70, No. 73 / Monday, April 18, 2005 / Notices Comment Date: 5 p.m. eastern time on April 25, 2005. 12. Puget Sound Energy, Inc. [Docket No. ER05–778–000] Take notice that on April 4, 2005, Puget Sound Energy, Inc. (PSE) tendered for filing a Non-Standard Provisions Agreement under the Western System Power Pool Agreement between PSE and Calpine Energy Management, L.P. (CEM). PSE requests an effective date of June 6, 2005. PSE states that the filing was served on CEM. Comment Date: 5 p.m. eastern time on April 25, 2005. 13. UAE Mecklenburg Cogeneration LP [Docket No. ER05–779–000] Take notice that on April 4, 2005, Virginia Electric and Power Company tender for filing a Notice of Cancellation of the market-based rate tariff of UAE Mecklenburg Cogeneration LP. Virginia Electric and Power Company requests an effective date of August 19, 2004. Comment Date: 5 p.m. eastern time on April 25, 2005. 14. James H. Hance, Jr. Take notice that on April 4, 2005, James H. Hance, Jr., filed an application for authorization under section 305(b) of the Federal Power Act to hold interlocking positions in Duke Energy Corporation and Sprint Corporation. Comment Date: 5 p.m. eastern time on April 25, 2005. Standard Paragraph Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all parties to this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 16:08 Apr 15, 2005 Linda Mitry, Deputy Secretary. [FR Doc. E5–1806 Filed 4–15–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Western Area Power Administration Pick-Sloan Missouri Basin Program— Eastern Division—Notice of Proposed Transmission and Ancillary Services Rates—Rate Order No. WAPA–122 Western Area Power Administration, DOE. ACTION: Notice of Proposed Transmission and Ancillary Services Rates. AGENCY: [Docket No. ID–4237–000] VerDate jul<14>2003 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Jkt 205001 SUMMARY: The Western Area Power Administration (Western) is proposing a minor transmission and ancillary services rate adjustment for the PickSloan Missouri Basin Program—Eastern Division (P–SMBP—ED). The P– SMBP—ED transmission and ancillary service rate schedules will expire on September 30, 2005. The proposed rates will provide sufficient revenue to pay all annual costs, including interest expense, and repayment of required investment within the allowable periods. Western will prepare a brochure providing detailed information on the rates to all interested parties. Western intends to conduct the public participation according to the minor rate adjustment process as defined in the Department of Energy’s (DOE) Procedures for Public Participation in Power and Transmission Rate Adjustments and Extensions. Western expects the proposed rates to go into effect October 1, 2005, and remain in effect through September 30, 2010. Publication of this Federal Register notice begins the formal process for the proposed rates. DATES: The consultation and comment period begins today and will end May 18, 2005. Western will accept written PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 20119 comments anytime during the consultation and comment period. ADDRESSES: Send written comments to Robert J. Harris, Regional Manager, Upper Great Plains Region, Western Area Power Administration, 2900 4th Avenue North, Billings, MT 59101– 1266, or e-mail at UGP_ISRate@wapa.gov. Western will post information about the rate process on its Web site at https://www.wapa.gov/ ugp/rates/2005ISRateAdj/default.htm. Western will post official comments received via letter and e-mail to its Web site after the close of the comment period. Western must receive written comments by the end of the consultation and comment period to ensure they are considered in Western’s decision process. FOR FURTHER INFORMATION CONTACT: Mr. Jon R. Horst, Rates Manager, Upper Great Plains Region, Western Area Power Administration, 2900 4th Avenue North, Billings, MT 59101–1266, telephone (406) 247–7444, e-mail horst@wapa.gov. SUPPLEMENTARY INFORMATION: The Deputy Secretary of Energy approved Rate Schedules UGP–FPT1, UGP– NFPT1, UGP–NT1, UGP–AS1, UGP– AS2, UGP–AS3, UGP–AS4, UGP–AS5, and UGP–AS6 for P–SMBP—ED firm and non-firm transmission rates and ancillary services rates on August 1, 1998, Rate Order No. WAPA–79. The Federal Energy Regulatory Commission (Commission) confirmed and approved the rate schedules on November 25, 1998, under FERC Docket No. EF98– 5031–000. These rate schedules were then extended through September 30, 2005, by Rate Order No. WAPA–100, which was confirmed and approved by the Commission on December 16, 2003, under FERC Docket No. EF03–5032– 000. The rate schedules for Rate Order No. WAPA–79 and Rate Order No. WAPA–100 contain formulary rates that are recalculated yearly using the fixed charge rate methodology. The proposed formulary rates will continue to use the fixed charge rate methodology and will continue to be recalculated from yearly updated financial and load data. However, the Generator Step Up Transformers are proposed for removal from the transmission revenue requirement. After the approval of the original transmission and ancillary service rates for P–SMBP—ED the Commission decided that Generator Step Up Transformers should not be included in transmission rates for jurisdictional utilities. Consistent with Western’s goal to observe Commission precedent to the extent consistent with its mission and permitted by law and E:\FR\FM\18APN1.SGM 18APN1

Agencies

[Federal Register Volume 70, Number 73 (Monday, April 18, 2005)]
[Notices]
[Pages 20118-20119]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-1806]



[[Page 20118]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EC05-66-000, et al.]


Morgan Stanley Capital Group Inc., et al.; Electric Rate and 
Corporate Filings

April 11, 2005.
    The following filings have been made with the Commission. The 
filings are listed in ascending order within each docket 
classification.

1. Morgan Stanley Capital Group Inc., South Eastern Electric 
Development Corporation, South Eastern Generating Corporation

[Docket No. EC05-66-000]

    Take notice that on April 6, 2005, Morgan Stanley Capital Group 
Inc. (MSCG), South Eastern Electric Development Corporation (SEEDCO), 
and South Eastern Generating Corporation (SEGCO) (collectively, 
Applicants) submitted an application pursuant to section 203 of the 
Federal Power Act for authorization for MSCG's acquisition from a 
third-party of securities in each of SEEDCO and SEGCO. The Applicants 
have requested privileged treatment of certain information and 
documentation submitted with the application.
    Comment Date: 5 p.m. eastern time on April 27, 2005.

2. Avista Energy, Inc.

[Docket No. ER96-2408-023]

    Take notice that on April 4, 2005, Avista Energy, Inc., submitted 
proposed revisions to its First Revised Rate Schedule FERC No. 1 in 
compliance with the Commission's order issued March 3, 2005 in Docket 
No. ER99-1435-003, et al., 110 FERC ] 61,216 (2005).
    Comment Date: 5 p.m. eastern time on April 25, 2005.

3. Spokane Energy, LLC

[Docket No. ER98-4336-012]

    Take notice that on April 4, 2005, Spokane Energy, LLC submitted 
proposed revisions to its First Revised Rate Schedule FERC No. 1 in 
compliance with the Commission's order issued March 3, 2005 in Docket 
No. ER99-1435-003, et al., 110 FERC ] 61,216 (2005).
    Comment Date: 5 p.m. eastern time on April 25, 2005.

4. Avista Corporation

[Docket No. ER99-1435-011]

    Take notice that on April 4, 2005, Avista Corporation submitted 
proposed revisions to its FERC Electric Tariff Fifth Revised Volume No. 
9 in compliance with the Commission's order issued March 3, 2005 in 
Docket No. ER99-1435-003, et al., 110 FERC ] 61,216 (2005).
    Comment Date: 5 p.m. eastern time on April 25, 2005.

5. Avista Turbine Power, Inc.

[Docket No. ER00-1814-006]

    Take notice that on April 4, 2005, Avista Turbine Power, Inc. 
submitted proposed revisions to its First Revised Rate Schedule No. 1 
in compliance with the Commission's order issued March 3, 2005 in 
Docket No. ER99-1435-003, et al., 110 FERC ] 61,216 (2005).
    Comment Date: 5 p.m. eastern time on April 25, 2005.

6. PJM Interconnection, L.L.C.; Virginia Electric and Power Company

[Docket No. ER04-829-005]

    Take notice that on April 4, 2005, Virginia Electric and Power 
Company tender for filing changes to the PJM South Transmission Owner 
Agreement in compliance with the Commission's order issued March 4, 
2005, 110 FERC ] 61,234 (2005).
    Comment Date: 5 p.m. eastern time on April 25, 2005.

7. Midwest Independent Transmission System Operator, Inc.

[Docket No. ER05-215-002]

    Take notice that on April 4, 2005, the Midwest Independent 
Transmission System Operator, Inc. (Midwest ISO) submitted an 
unexecuted Interconnection Agreement between the Midwest ISO, Prairie 
State Generation Company, LLC and Illinois Power Company.
    The Midwest ISO states that the filing was served on the parties to 
the Interconnection Agreement.
    Comment Date: 5 p.m. eastern time on April 25, 2005.

8. Arroyo Energy LP; Mohawk River Funding IV, L.L.C.; Utility Contract 
Funding, L.L.C.; Thermo Cogeneration Partnership, L.P.; Cedar Brakes I, 
L.L.C.; Cedar Brakes II, L.L.C.

[Docket Nos. ER05-375-001, ER02-1582-002, ER02-2102-003, ER02-1785-002, 
ER00-2885-004, ER01-2765-003]

    Take notice that on April 4, 2005, Arroyo Energy LP, Mohawk River 
Funding IV, L.L.C., Utility Contract Funding, L.L.C., Thermo 
Cogeneration Partnership, L.P., Cedar Brakes I, L.L.C. and Cedar Brakes 
II, L.L.C. (collectively, the Filing Entities) filed a Notification of 
Change of Status notifying the Commission that each of the Filing 
Entities had become affiliated with, or that there were applications 
pending that would result in them being affiliated with, entities that 
sell energy an/or capacity in wholesale electricity markets.
    The Filing Entities state that copies of the filing were served on 
the parties on the official service list in these proceedings.
    Comment Date: 5 p.m. eastern time on April 25, 2005.

9. El Paso Electric Company

[Docket No. ER05-427-001]

    Take notice that on April 4, 2005, El Paso Electric Company (EPE) 
submitted a compliance filing pursuant to the Commission's letter order 
issued March 4, 2005 in Docket No. ER05-427-000.
    Comment Date: 5 p.m. eastern time on April 25, 2005.

10. Niagara Mohawk Power Corporation

[Docket No. ER05-775-000]

    Take notice that on April 4, 2005, Niagara Mohawk Power 
Corporation, a National Grid company (Niagara Mohawk), submitted 
Notices of Cancellation for the following service agreements under 
Niagara Mohawk's FERC Electric Tariff, Volume No. 3: Service Agreement 
Nos. 1 through 28 (inclusive), 30, 31, 32, 34, 35, 37, 38, 39, 59, 64, 
65, 72, 78, 79, 80, 86, 90, 96, 101, 124, 125, 126, 128, 131, 134, 143, 
145, 148, 150, 152, 162, 163, 167, 173, 182, 184, 188, 190, 194, 201, 
206, 212, and 222. Niagara Mohawk states that these service agreements 
should be cancelled because they have terminated by their own terms and 
the parties to the agreements no longer take service from Niagara 
Mohawk.
    Niagara Mohawk states that a copy of this filing has been served 
upon the parties to the various agreements, New York Independent System 
Operator, and the New York State utility commission.
    Comment Date: 5 p.m. eastern time on April 25, 2005.

11. Florida Keys Electric Cooperative Association, Inc.

[Docket No. ER05-776-000]

    Take notice that on April 4, 2005, Florida Keys Electric 
Cooperative Association, Inc. (FKEC) tendered for filing a revised rate 
for non-firm transmission service provided to Keys Energy Services, Key 
West, Florida (KES) in accordance with the terms and conditions of the 
Long-Term Joint Investment Transmission Agreement between KFEC and KES.
    FKEC states that the filing has been served on KES and the Florida 
Public Service Commission.

[[Page 20119]]

    Comment Date: 5 p.m. eastern time on April 25, 2005.

12. Puget Sound Energy, Inc.

[Docket No. ER05-778-000]

    Take notice that on April 4, 2005, Puget Sound Energy, Inc. (PSE) 
tendered for filing a Non-Standard Provisions Agreement under the 
Western System Power Pool Agreement between PSE and Calpine Energy 
Management, L.P. (CEM). PSE requests an effective date of June 6, 2005.
    PSE states that the filing was served on CEM.
    Comment Date: 5 p.m. eastern time on April 25, 2005.

13. UAE Mecklenburg Cogeneration LP

[Docket No. ER05-779-000]

    Take notice that on April 4, 2005, Virginia Electric and Power 
Company tender for filing a Notice of Cancellation of the market-based 
rate tariff of UAE Mecklenburg Cogeneration LP. Virginia Electric and 
Power Company requests an effective date of August 19, 2004.
    Comment Date: 5 p.m. eastern time on April 25, 2005.

14. James H. Hance, Jr.

[Docket No. ID-4237-000]

    Take notice that on April 4, 2005, James H. Hance, Jr., filed an 
application for authorization under section 305(b) of the Federal Power 
Act to hold interlocking positions in Duke Energy Corporation and 
Sprint Corporation.
    Comment Date: 5 p.m. eastern time on April 25, 2005.

Standard Paragraph

    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Applicant and all parties to this proceeding.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Linda Mitry,
Deputy Secretary.
[FR Doc. E5-1806 Filed 4-15-05; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.