Morgan Stanley Capital Group Inc., et al.; Electric Rate and Corporate Filings, 20118-20119 [E5-1806]
Download as PDF
20118
Federal Register / Vol. 70, No. 73 / Monday, April 18, 2005 / Notices
Morgan Stanley Capital Group Inc., et
al.; Electric Rate and Corporate Filings
revisions to its FERC Electric Tariff Fifth
Revised Volume No. 9 in compliance
with the Commission’s order issued
March 3, 2005 in Docket No. ER99–
1435–003, et al., 110 FERC ¶ 61,216
(2005).
Comment Date: 5 p.m. eastern time on
April 25, 2005.
April 11, 2005.
5. Avista Turbine Power, Inc.
The following filings have been made
with the Commission. The filings are
listed in ascending order within each
docket classification.
[Docket No. ER00–1814–006]
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EC05–66–000, et al.]
1. Morgan Stanley Capital Group Inc.,
South Eastern Electric Development
Corporation, South Eastern Generating
Corporation
[Docket No. EC05–66–000]
Take notice that on April 6, 2005,
Morgan Stanley Capital Group Inc.
(MSCG), South Eastern Electric
Development Corporation (SEEDCO),
and South Eastern Generating
Corporation (SEGCO) (collectively,
Applicants) submitted an application
pursuant to section 203 of the Federal
Power Act for authorization for MSCG’s
acquisition from a third-party of
securities in each of SEEDCO and
SEGCO. The Applicants have requested
privileged treatment of certain
information and documentation
submitted with the application.
Comment Date: 5 p.m. eastern time on
April 27, 2005.
2. Avista Energy, Inc.
[Docket No. ER96–2408–023]
Take notice that on April 4, 2005,
Avista Energy, Inc., submitted proposed
revisions to its First Revised Rate
Schedule FERC No. 1 in compliance
with the Commission’s order issued
March 3, 2005 in Docket No. ER99–
1435–003, et al., 110 FERC ¶ 61,216
(2005).
Comment Date: 5 p.m. eastern time on
April 25, 2005.
3. Spokane Energy, LLC
[Docket No. ER98–4336–012]
Take notice that on April 4, 2005,
Spokane Energy, LLC submitted
proposed revisions to its First Revised
Rate Schedule FERC No. 1 in
compliance with the Commission’s
order issued March 3, 2005 in Docket
No. ER99–1435–003, et al., 110 FERC
¶ 61,216 (2005).
Comment Date: 5 p.m. eastern time on
April 25, 2005.
4. Avista Corporation
[Docket No. ER99–1435–011]
Take notice that on April 4, 2005,
Avista Corporation submitted proposed
VerDate jul<14>2003
16:08 Apr 15, 2005
Jkt 205001
Take notice that on April 4, 2005,
Avista Turbine Power, Inc. submitted
proposed revisions to its First Revised
Rate Schedule No. 1 in compliance with
the Commission’s order issued March 3,
2005 in Docket No. ER99–1435–003, et
al., 110 FERC ¶ 61,216 (2005).
Comment Date: 5 p.m. eastern time on
April 25, 2005.
6. PJM Interconnection, L.L.C.; Virginia
Electric and Power Company
[Docket No. ER04–829–005]
Take notice that on April 4, 2005,
Virginia Electric and Power Company
tender for filing changes to the PJM
South Transmission Owner Agreement
in compliance with the Commission’s
order issued March 4, 2005, 110 FERC
¶ 61,234 (2005).
Comment Date: 5 p.m. eastern time on
April 25, 2005.
7. Midwest Independent Transmission
System Operator, Inc.
[Docket No. ER05–215–002]
Take notice that on April 4, 2005, the
Midwest Independent Transmission
System Operator, Inc. (Midwest ISO)
submitted an unexecuted
Interconnection Agreement between the
Midwest ISO, Prairie State Generation
Company, LLC and Illinois Power
Company.
The Midwest ISO states that the filing
was served on the parties to the
Interconnection Agreement.
Comment Date: 5 p.m. eastern time on
April 25, 2005.
8. Arroyo Energy LP; Mohawk River
Funding IV, L.L.C.; Utility Contract
Funding, L.L.C.; Thermo Cogeneration
Partnership, L.P.; Cedar Brakes I,
L.L.C.; Cedar Brakes II, L.L.C.
[Docket Nos. ER05–375–001, ER02–1582–
002, ER02–2102–003, ER02–1785–002,
ER00–2885–004, ER01–2765–003]
Take notice that on April 4, 2005,
Arroyo Energy LP, Mohawk River
Funding IV, L.L.C., Utility Contract
Funding, L.L.C., Thermo Cogeneration
Partnership, L.P., Cedar Brakes I, L.L.C.
and Cedar Brakes II, L.L.C. (collectively,
the Filing Entities) filed a Notification of
Change of Status notifying the
Commission that each of the Filing
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
Entities had become affiliated with, or
that there were applications pending
that would result in them being
affiliated with, entities that sell energy
an/or capacity in wholesale electricity
markets.
The Filing Entities state that copies of
the filing were served on the parties on
the official service list in these
proceedings.
Comment Date: 5 p.m. eastern time on
April 25, 2005.
9. El Paso Electric Company
[Docket No. ER05–427–001]
Take notice that on April 4, 2005, El
Paso Electric Company (EPE) submitted
a compliance filing pursuant to the
Commission’s letter order issued March
4, 2005 in Docket No. ER05–427–000.
Comment Date: 5 p.m. eastern time on
April 25, 2005.
10. Niagara Mohawk Power
Corporation
[Docket No. ER05–775–000]
Take notice that on April 4, 2005,
Niagara Mohawk Power Corporation, a
National Grid company (Niagara
Mohawk), submitted Notices of
Cancellation for the following service
agreements under Niagara Mohawk’s
FERC Electric Tariff, Volume No. 3:
Service Agreement Nos. 1 through 28
(inclusive), 30, 31, 32, 34, 35, 37, 38, 39,
59, 64, 65, 72, 78, 79, 80, 86, 90, 96, 101,
124, 125, 126, 128, 131, 134, 143, 145,
148, 150, 152, 162, 163, 167, 173, 182,
184, 188, 190, 194, 201, 206, 212, and
222. Niagara Mohawk states that these
service agreements should be cancelled
because they have terminated by their
own terms and the parties to the
agreements no longer take service from
Niagara Mohawk.
Niagara Mohawk states that a copy of
this filing has been served upon the
parties to the various agreements, New
York Independent System Operator, and
the New York State utility commission.
Comment Date: 5 p.m. eastern time on
April 25, 2005.
11. Florida Keys Electric Cooperative
Association, Inc.
[Docket No. ER05–776–000]
Take notice that on April 4, 2005,
Florida Keys Electric Cooperative
Association, Inc. (FKEC) tendered for
filing a revised rate for non-firm
transmission service provided to Keys
Energy Services, Key West, Florida
(KES) in accordance with the terms and
conditions of the Long-Term Joint
Investment Transmission Agreement
between KFEC and KES.
FKEC states that the filing has been
served on KES and the Florida Public
Service Commission.
E:\FR\FM\18APN1.SGM
18APN1
Federal Register / Vol. 70, No. 73 / Monday, April 18, 2005 / Notices
Comment Date: 5 p.m. eastern time on
April 25, 2005.
12. Puget Sound Energy, Inc.
[Docket No. ER05–778–000]
Take notice that on April 4, 2005,
Puget Sound Energy, Inc. (PSE) tendered
for filing a Non-Standard Provisions
Agreement under the Western System
Power Pool Agreement between PSE
and Calpine Energy Management, L.P.
(CEM). PSE requests an effective date of
June 6, 2005.
PSE states that the filing was served
on CEM.
Comment Date: 5 p.m. eastern time on
April 25, 2005.
13. UAE Mecklenburg Cogeneration LP
[Docket No. ER05–779–000]
Take notice that on April 4, 2005,
Virginia Electric and Power Company
tender for filing a Notice of Cancellation
of the market-based rate tariff of UAE
Mecklenburg Cogeneration LP. Virginia
Electric and Power Company requests
an effective date of August 19, 2004.
Comment Date: 5 p.m. eastern time on
April 25, 2005.
14. James H. Hance, Jr.
Take notice that on April 4, 2005,
James H. Hance, Jr., filed an application
for authorization under section 305(b) of
the Federal Power Act to hold
interlocking positions in Duke Energy
Corporation and Sprint Corporation.
Comment Date: 5 p.m. eastern time on
April 25, 2005.
Standard Paragraph
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all parties to this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
16:08 Apr 15, 2005
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–1806 Filed 4–15–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Western Area Power Administration
Pick-Sloan Missouri Basin Program—
Eastern Division—Notice of Proposed
Transmission and Ancillary Services
Rates—Rate Order No. WAPA–122
Western Area Power
Administration, DOE.
ACTION: Notice of Proposed
Transmission and Ancillary Services
Rates.
AGENCY:
[Docket No. ID–4237–000]
VerDate jul<14>2003
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Jkt 205001
SUMMARY: The Western Area Power
Administration (Western) is proposing a
minor transmission and ancillary
services rate adjustment for the PickSloan Missouri Basin Program—Eastern
Division (P–SMBP—ED). The P–
SMBP—ED transmission and ancillary
service rate schedules will expire on
September 30, 2005. The proposed rates
will provide sufficient revenue to pay
all annual costs, including interest
expense, and repayment of required
investment within the allowable
periods. Western will prepare a
brochure providing detailed information
on the rates to all interested parties.
Western intends to conduct the public
participation according to the minor rate
adjustment process as defined in the
Department of Energy’s (DOE)
Procedures for Public Participation in
Power and Transmission Rate
Adjustments and Extensions. Western
expects the proposed rates to go into
effect October 1, 2005, and remain in
effect through September 30, 2010.
Publication of this Federal Register
notice begins the formal process for the
proposed rates.
DATES: The consultation and comment
period begins today and will end May
18, 2005. Western will accept written
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
20119
comments anytime during the
consultation and comment period.
ADDRESSES: Send written comments to
Robert J. Harris, Regional Manager,
Upper Great Plains Region, Western
Area Power Administration, 2900 4th
Avenue North, Billings, MT 59101–
1266, or e-mail at
UGP_ISRate@wapa.gov. Western will
post information about the rate process
on its Web site at https://www.wapa.gov/
ugp/rates/2005ISRateAdj/default.htm.
Western will post official comments
received via letter and e-mail to its Web
site after the close of the comment
period. Western must receive written
comments by the end of the
consultation and comment period to
ensure they are considered in Western’s
decision process.
FOR FURTHER INFORMATION CONTACT: Mr.
Jon R. Horst, Rates Manager, Upper
Great Plains Region, Western Area
Power Administration, 2900 4th Avenue
North, Billings, MT 59101–1266,
telephone (406) 247–7444, e-mail
horst@wapa.gov.
SUPPLEMENTARY INFORMATION: The
Deputy Secretary of Energy approved
Rate Schedules UGP–FPT1, UGP–
NFPT1, UGP–NT1, UGP–AS1, UGP–
AS2, UGP–AS3, UGP–AS4, UGP–AS5,
and UGP–AS6 for P–SMBP—ED firm
and non-firm transmission rates and
ancillary services rates on August 1,
1998, Rate Order No. WAPA–79. The
Federal Energy Regulatory Commission
(Commission) confirmed and approved
the rate schedules on November 25,
1998, under FERC Docket No. EF98–
5031–000. These rate schedules were
then extended through September 30,
2005, by Rate Order No. WAPA–100,
which was confirmed and approved by
the Commission on December 16, 2003,
under FERC Docket No. EF03–5032–
000. The rate schedules for Rate Order
No. WAPA–79 and Rate Order No.
WAPA–100 contain formulary rates that
are recalculated yearly using the fixed
charge rate methodology. The proposed
formulary rates will continue to use the
fixed charge rate methodology and will
continue to be recalculated from yearly
updated financial and load data.
However, the Generator Step Up
Transformers are proposed for removal
from the transmission revenue
requirement. After the approval of the
original transmission and ancillary
service rates for P–SMBP—ED the
Commission decided that Generator
Step Up Transformers should not be
included in transmission rates for
jurisdictional utilities. Consistent with
Western’s goal to observe Commission
precedent to the extent consistent with
its mission and permitted by law and
E:\FR\FM\18APN1.SGM
18APN1
Agencies
[Federal Register Volume 70, Number 73 (Monday, April 18, 2005)]
[Notices]
[Pages 20118-20119]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-1806]
[[Page 20118]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EC05-66-000, et al.]
Morgan Stanley Capital Group Inc., et al.; Electric Rate and
Corporate Filings
April 11, 2005.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. Morgan Stanley Capital Group Inc., South Eastern Electric
Development Corporation, South Eastern Generating Corporation
[Docket No. EC05-66-000]
Take notice that on April 6, 2005, Morgan Stanley Capital Group
Inc. (MSCG), South Eastern Electric Development Corporation (SEEDCO),
and South Eastern Generating Corporation (SEGCO) (collectively,
Applicants) submitted an application pursuant to section 203 of the
Federal Power Act for authorization for MSCG's acquisition from a
third-party of securities in each of SEEDCO and SEGCO. The Applicants
have requested privileged treatment of certain information and
documentation submitted with the application.
Comment Date: 5 p.m. eastern time on April 27, 2005.
2. Avista Energy, Inc.
[Docket No. ER96-2408-023]
Take notice that on April 4, 2005, Avista Energy, Inc., submitted
proposed revisions to its First Revised Rate Schedule FERC No. 1 in
compliance with the Commission's order issued March 3, 2005 in Docket
No. ER99-1435-003, et al., 110 FERC ] 61,216 (2005).
Comment Date: 5 p.m. eastern time on April 25, 2005.
3. Spokane Energy, LLC
[Docket No. ER98-4336-012]
Take notice that on April 4, 2005, Spokane Energy, LLC submitted
proposed revisions to its First Revised Rate Schedule FERC No. 1 in
compliance with the Commission's order issued March 3, 2005 in Docket
No. ER99-1435-003, et al., 110 FERC ] 61,216 (2005).
Comment Date: 5 p.m. eastern time on April 25, 2005.
4. Avista Corporation
[Docket No. ER99-1435-011]
Take notice that on April 4, 2005, Avista Corporation submitted
proposed revisions to its FERC Electric Tariff Fifth Revised Volume No.
9 in compliance with the Commission's order issued March 3, 2005 in
Docket No. ER99-1435-003, et al., 110 FERC ] 61,216 (2005).
Comment Date: 5 p.m. eastern time on April 25, 2005.
5. Avista Turbine Power, Inc.
[Docket No. ER00-1814-006]
Take notice that on April 4, 2005, Avista Turbine Power, Inc.
submitted proposed revisions to its First Revised Rate Schedule No. 1
in compliance with the Commission's order issued March 3, 2005 in
Docket No. ER99-1435-003, et al., 110 FERC ] 61,216 (2005).
Comment Date: 5 p.m. eastern time on April 25, 2005.
6. PJM Interconnection, L.L.C.; Virginia Electric and Power Company
[Docket No. ER04-829-005]
Take notice that on April 4, 2005, Virginia Electric and Power
Company tender for filing changes to the PJM South Transmission Owner
Agreement in compliance with the Commission's order issued March 4,
2005, 110 FERC ] 61,234 (2005).
Comment Date: 5 p.m. eastern time on April 25, 2005.
7. Midwest Independent Transmission System Operator, Inc.
[Docket No. ER05-215-002]
Take notice that on April 4, 2005, the Midwest Independent
Transmission System Operator, Inc. (Midwest ISO) submitted an
unexecuted Interconnection Agreement between the Midwest ISO, Prairie
State Generation Company, LLC and Illinois Power Company.
The Midwest ISO states that the filing was served on the parties to
the Interconnection Agreement.
Comment Date: 5 p.m. eastern time on April 25, 2005.
8. Arroyo Energy LP; Mohawk River Funding IV, L.L.C.; Utility Contract
Funding, L.L.C.; Thermo Cogeneration Partnership, L.P.; Cedar Brakes I,
L.L.C.; Cedar Brakes II, L.L.C.
[Docket Nos. ER05-375-001, ER02-1582-002, ER02-2102-003, ER02-1785-002,
ER00-2885-004, ER01-2765-003]
Take notice that on April 4, 2005, Arroyo Energy LP, Mohawk River
Funding IV, L.L.C., Utility Contract Funding, L.L.C., Thermo
Cogeneration Partnership, L.P., Cedar Brakes I, L.L.C. and Cedar Brakes
II, L.L.C. (collectively, the Filing Entities) filed a Notification of
Change of Status notifying the Commission that each of the Filing
Entities had become affiliated with, or that there were applications
pending that would result in them being affiliated with, entities that
sell energy an/or capacity in wholesale electricity markets.
The Filing Entities state that copies of the filing were served on
the parties on the official service list in these proceedings.
Comment Date: 5 p.m. eastern time on April 25, 2005.
9. El Paso Electric Company
[Docket No. ER05-427-001]
Take notice that on April 4, 2005, El Paso Electric Company (EPE)
submitted a compliance filing pursuant to the Commission's letter order
issued March 4, 2005 in Docket No. ER05-427-000.
Comment Date: 5 p.m. eastern time on April 25, 2005.
10. Niagara Mohawk Power Corporation
[Docket No. ER05-775-000]
Take notice that on April 4, 2005, Niagara Mohawk Power
Corporation, a National Grid company (Niagara Mohawk), submitted
Notices of Cancellation for the following service agreements under
Niagara Mohawk's FERC Electric Tariff, Volume No. 3: Service Agreement
Nos. 1 through 28 (inclusive), 30, 31, 32, 34, 35, 37, 38, 39, 59, 64,
65, 72, 78, 79, 80, 86, 90, 96, 101, 124, 125, 126, 128, 131, 134, 143,
145, 148, 150, 152, 162, 163, 167, 173, 182, 184, 188, 190, 194, 201,
206, 212, and 222. Niagara Mohawk states that these service agreements
should be cancelled because they have terminated by their own terms and
the parties to the agreements no longer take service from Niagara
Mohawk.
Niagara Mohawk states that a copy of this filing has been served
upon the parties to the various agreements, New York Independent System
Operator, and the New York State utility commission.
Comment Date: 5 p.m. eastern time on April 25, 2005.
11. Florida Keys Electric Cooperative Association, Inc.
[Docket No. ER05-776-000]
Take notice that on April 4, 2005, Florida Keys Electric
Cooperative Association, Inc. (FKEC) tendered for filing a revised rate
for non-firm transmission service provided to Keys Energy Services, Key
West, Florida (KES) in accordance with the terms and conditions of the
Long-Term Joint Investment Transmission Agreement between KFEC and KES.
FKEC states that the filing has been served on KES and the Florida
Public Service Commission.
[[Page 20119]]
Comment Date: 5 p.m. eastern time on April 25, 2005.
12. Puget Sound Energy, Inc.
[Docket No. ER05-778-000]
Take notice that on April 4, 2005, Puget Sound Energy, Inc. (PSE)
tendered for filing a Non-Standard Provisions Agreement under the
Western System Power Pool Agreement between PSE and Calpine Energy
Management, L.P. (CEM). PSE requests an effective date of June 6, 2005.
PSE states that the filing was served on CEM.
Comment Date: 5 p.m. eastern time on April 25, 2005.
13. UAE Mecklenburg Cogeneration LP
[Docket No. ER05-779-000]
Take notice that on April 4, 2005, Virginia Electric and Power
Company tender for filing a Notice of Cancellation of the market-based
rate tariff of UAE Mecklenburg Cogeneration LP. Virginia Electric and
Power Company requests an effective date of August 19, 2004.
Comment Date: 5 p.m. eastern time on April 25, 2005.
14. James H. Hance, Jr.
[Docket No. ID-4237-000]
Take notice that on April 4, 2005, James H. Hance, Jr., filed an
application for authorization under section 305(b) of the Federal Power
Act to hold interlocking positions in Duke Energy Corporation and
Sprint Corporation.
Comment Date: 5 p.m. eastern time on April 25, 2005.
Standard Paragraph
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant and all parties to this proceeding.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-1806 Filed 4-15-05; 8:45 am]
BILLING CODE 6717-01-P