Premcor Power Marketing LLC; Notice of Issuance of Order, 19948 [E5-1777]
Download as PDF
19948
Federal Register / Vol. 70, No. 72 / Friday, April 15, 2005 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP05–263–000]
Overthrust Pipeline Company; Notice
of Proposed Changes in Ferc Gas
Tariff
April 7, 2005.
Take notice that on April 1, 2005,
Overthrust Pipeline Company
(Overthrust) tendered for filing as part
of its FERC Gas Tariff, First Revised
Volume No. 1–A, the following tariff
sheets, to become effective May 1, 2005:
Thirteenth Revised Sheet No. 1
Sixteenth Revised Sheet No. 30
Third Revised Sheet No. 78I
First Revised Sheet No. 78I.01
14:34 Apr 14, 2005
Jkt 205001
Magalie R. Salas,
Secretary.
[FR Doc. E5–1773 Filed 4–14–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Overthrust states it is proposing to
remove tariff provisions implementing
the Commission’s CIG/Granite State
policy concerning a shipper’s retention
of its discounted rates when a secondary
point is used.
Overthrust states that copies of the
filing have been served upon
Overthrust’s customers and the public
service commissions of Utah and
Wyoming.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
VerDate jul<14>2003
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Federal Energy Regulatory
Commission
[Docket No. ER05–680–000]
Premcor Power Marketing LLC; Notice
of Issuance of Order
April 8, 2005.
Premcor Power Marketing LLC
(Premcor) filed an application for
market-based rate authority, with an
accompanying rate tariff. The proposed
rate tariff provides for the sales of
capacity, energy, and ancillary services
at market-based rates. Premcor also
requested waiver of various Commission
regulations. In particular, Premcor
requested that the Commission grant
blanket approval under 18 CFR part 34
of all future issuances of securities and
assumptions of liability by Premcor.
On April 5, 2005, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development—South, granted the
request for blanket approval under part
34. The Director’s order also stated that
the Commission would publish a
separate notice in the Federal Register
establishing a period of time for the
filing of protests. Accordingly, any
person desiring to be heard or to protest
the blanket approval of issuances of
securities or assumptions of liability by
Premcor should file a motion to
intervene or protest with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing motions to intervene
or protest is May 5, 2005.
Absent a request to be heard in
opposition by the deadline above,
Premcor is authorized to issue securities
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
and assume obligations or liabilities as
a guarantor, indorser, surety, or
otherwise in respect of any security of
another person; provided that such
issuance or assumption is for some
lawful object within the corporate
purposes of Premcor, compatible with
the public interest, and is reasonably
necessary or appropriate for such
purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approval of Premcor’s issuances of
securities or assumptions of liability.
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at
https://www.ferc.gov, using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E5–1777 Filed 4–14–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP05–262–000]
Questar Pipeline Company; Notice of
Tariff Filing
April 7, 2005.
Take notice that on April 1, 2005,
Questar Pipeline Company (Questar),
tendered for filing as part of its FERC
Gas Tariff, Fourth Revised Sheet No. 99,
with an effective date of May 1, 2005.
Questar states that it is proposing to
remove discounting provisions that
implemented the Commission’s CIG/
Granite State policy concerning a
shipper’s retention of its discounted
rates when a secondary point is used.
Questar states that copies of this filing
were served upon Questar’s customers,
the Public Service Commission of Utah
and the Public Service Commission of
Wyoming.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
E:\FR\FM\15APN1.SGM
15APN1
Agencies
[Federal Register Volume 70, Number 72 (Friday, April 15, 2005)]
[Notices]
[Page 19948]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-1777]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER05-680-000]
Premcor Power Marketing LLC; Notice of Issuance of Order
April 8, 2005.
Premcor Power Marketing LLC (Premcor) filed an application for
market-based rate authority, with an accompanying rate tariff. The
proposed rate tariff provides for the sales of capacity, energy, and
ancillary services at market-based rates. Premcor also requested waiver
of various Commission regulations. In particular, Premcor requested
that the Commission grant blanket approval under 18 CFR part 34 of all
future issuances of securities and assumptions of liability by Premcor.
On April 5, 2005, pursuant to delegated authority, the Director,
Division of Tariffs and Market Development--South, granted the request
for blanket approval under part 34. The Director's order also stated
that the Commission would publish a separate notice in the Federal
Register establishing a period of time for the filing of protests.
Accordingly, any person desiring to be heard or to protest the blanket
approval of issuances of securities or assumptions of liability by
Premcor should file a motion to intervene or protest with the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426, in accordance with Rules 211 and 214 of the Commission's Rules
of Practice and Procedure. 18 CFR 385.211, 385.214 (2004).
Notice is hereby given that the deadline for filing motions to
intervene or protest is May 5, 2005.
Absent a request to be heard in opposition by the deadline above,
Premcor is authorized to issue securities and assume obligations or
liabilities as a guarantor, indorser, surety, or otherwise in respect
of any security of another person; provided that such issuance or
assumption is for some lawful object within the corporate purposes of
Premcor, compatible with the public interest, and is reasonably
necessary or appropriate for such purposes.
The Commission reserves the right to require a further showing that
neither public nor private interests will be adversely affected by
continued approval of Premcor's issuances of securities or assumptions
of liability.
Copies of the full text of the Director's Order are available from
the Commission's Public Reference Room, 888 First Street, NE.,
Washington, DC 20426. The Order may also be viewed on the Commission's
Web site at https://www.ferc.gov, using the eLibrary link. Enter the
docket number excluding the last three digits in the docket number
filed to access the document. Comments, protests, and interventions may
be filed electronically via the Internet in lieu of paper. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. The Commission strongly encourages
electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E5-1777 Filed 4-14-05; 8:45 am]
BILLING CODE 6717-01-P